Professional Documents
Culture Documents
The Punjab School Off Grid System 6.7kW-02
The Punjab School Off Grid System 6.7kW-02
The Punjab School Off Grid System 6.7kW-02
Date: 10-10-2023
Our Mission
To provide clean energy universally available by building a distributed and
intelligent solar, managed via the Internet across the world.
Our Values
Sense of Responsibility - To our work, our customers and our planet
Trustworthiness - In our dealings externally and internally
Reliability - Of our products and services
Innovation - Constantly raising the industry bar in what we do
Diligence - In what we do
Excellence in Design - For products that excite people
86-Ali Town, Rawind Road, Lahore (Pakistan) | Tel: +9230 515 999 06 | Email: info@landmarkenergy.com.pk
Quotation # LME/23/TPS/09
Date: 10-10-2023
Location: Lahore
Dear Sir,
Thank you for providing Landmark Energy with the opportunity to conduct business with yourself. We
assure you we deliver the best results for your current project as well as any future assignments.
As you know that Solar energy is already much cost-effective in comparison to diesel (or other fossil fuels),
and with the unending power woes coupled with perpetual hikes in grid electricity prices over the past
few years, solar electricity has now progressed into the most viable power solution for the country.
According to the latest studies, worldwide renewables are a better investment than the stock market, as
we keep using electricity during recessions. A unit produced by Diesel costs between 65 to 70 PKR per
unit, whereas a unit produced by solar ranges between $0.3 - $0.45 per unit.
At LANDMARK Energy, we offer the best services for solar in terms of Design, Project management,
Procurement and Testing Commissioning. Our product is based on new-generation alternate energy smart
solar solutions. We take pride in providing convenience with complete control. Our solutions provided by
smart energy intelligence and analytics are suitable for domestic and commercial needs and bring down
overall energy costs.
We believe we should address your energy requirements through our advanced solar solutions and help
you bring down the energy costs.
86-Ali Town, Rawind Road, Lahore (Pakistan) | Tel: +9230 515 999 06 | Email: info@landmarkenergy.com.pk
Scope of Work
Client LANDMARK
Sr. Description
Scope Energy Scope
No.
1 Roof Boundary wall for safety
2 Free and Safe to Site
3 On-Site Ware Housing (Lock & Key)
4 Regular Cleaning of Solar Modules
Maintenance of System During 1 Year of
5
Warranty Service and Support
DC, AC, Grounding and control Cables supply
6
Utilities (Electricity, Water and Security) during
7
Project Execution
Installation, Testing & Commissioning of
8
Complete System as per Design
On-Site Internet Availability (Wifi/Ethernet/4G as
9
required)
10 Any Upgradation in existing Electrical Infrastructure
11 Basic Training of On-Site Staff for Operation and
Maintenance
12 24/7 Remote Monitoring
Note: Any change in scope of work added to the bill of materials and ratings or any variation
86-Ali Town, Rawind Road, Lahore (Pakistan) | Tel: +9230 515 999 06 | Email: info@landmarkenergy.com.pk
DESIGNER REPORT Page 1 of 4 Site ID: 7635510232423621
SIMULATION RESULTS
* *
CO
Installed DC Power Max Achieved AC Power Annual Energy Production CO2 Emission Saved Equivalent Trees Planted
(Annually) (Annually)
6.78 kWp 6.6 kW 10.73 MWh 4.21 t 193
Max Achieved DC Power DC/AC Oversizing Max Active AC Power Performance Ratio Performance Index
1.25
0.75
MWh
0.5
0.25
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Month Solar Production (kWh) Consumption (kWh) Self-consumption (kWh) Clipped Energy (kWh)
Jan 664 - - -
Feb 777 - - -
Mar 987 - - -
Apr 1,001 - - -
May 1,059 - - -
Jun 1,037 - - -
Jul 946 - - -
Aug 1,008 - - -
Sep 999 - - -
Oct 856 - - -
Nov 725 - - -
Dec 672 - - -
DESIGNER REPORT Page 3 of 4 Site ID: 7635510232423621
PV MODULES
ELECTRICAL DESIGN
PV modules per
Inverters & Storage Strings per inverter Optimizers per string string
SIMULATION PARAMETERS
Grid 400V L-L, 230V L-N Incidence angle modi er (IAM), ASHRAE b0 param. 0.05
fi
Thermal loss factor Uc (const) Flush mount 20
System unavailability 0%
NOTES
2.15 3.82
B B
2.00
2.00
Smith Leg
2.00
A A
4 3 2 1
6 5 4 3 2 1
D D
50.0
0
510.
00
2500
.00
C 1990
.00 C
711.30
550.00
556.75
112.53
408.65
15.15°
B 57.50 2059.94 B
2481.47
UNLESS OTHERWISE SPECIFIED: FINISH: DEBURR AND
DO NOT SCALE DRAWING REVISION
DIMENSIONS ARE IN MILLIMETERS BREAK SHARP
SURFACE FINISH: EDGES
TOLERANCES:
LINEAR:
ANGULAR:
DRAWN
CHK'D
APPV'D
MFG
6 5 4 3 2 1
6 5 4 3 2 1
D 11
33
D
6.00 .0
0
225
25
.0
0
C C
0 .80
1 32
B 0.60 B
43
UNLESS OTHERWISE SPECIFIED: FINISH: DEBURR AND
DO NOT SCALE DRAWING REVISION
DIMENSIONS ARE IN MILLIMETERS BREAK SHARP
SURFACE FINISH: EDGES
TOLERANCES:
LINEAR:
ANGULAR:
DRAWN
CHK'D
APPV'D
MFG
6 5 4 3 2 1
Quotation # LME/23/TPS/09
Date: 10.10.2023
Commercial Proposal
86-Ali Town, Rawind Road, Lahore (Pakistan) | Tel: +9230 515 999 06 | Email: info@landmarkenergy.com.pk
Quotation # LME/23/TPS/09
Date: 10.10.2023
86-Ali Town, Rawind Road, Lahore (Pakistan) | Tel: +9230 515 999 06 | Email: info@landmarkenergy.com.pk
Quotation # LME/23/TPS/09
Date: 10.10.2023
The quoted price includes design, sourcing, testing, installation & commissioning,
as per the bill of materials & ratings submitted by LANDMARK Energy. Any change
Price
in scope of work added to the bill of materials and ratings
or any variation shall be charged to the customer.
LANDMARK Energy will provide a Maintenance manual and training to the client.
LANDMARK Energy will provide free-of-cost O&M service for First One (1) year. The
One-year service will include:
Remote monitoring of system performance and faults.
No charge for site visits in case of any faults in the system
FOC Site visits in case of abnormal performance degradation of PV
Operation & plant.
Maintenance One Dedicated resource will be there on site for a year to monitor the
system performance.
After One (1) year, either an SLA would be signed for the next period, the rate of
which will be 1% annually of the initial agreed amount of solar system or any
mutually agreed amount. In case of SLA is not signed, the customer will be charged
as mutually agreed per site visit charges.
LANDMARK Energy will support in any warranty claim to the OEM within 1 year.
Solar Panels Cleaning will be client’s scope, Landmark will provide initial
supervision for it.
Force majeure shall mean any cause, existing or future, which is beyond the
Order reasonable control of LANDMARK Energy including, but not limited to, acts of God,
Reversal storm, fire, floods, quarantine, earthquake, strike, lockout, acts of war (declared
or
undeclared), LANDMARK Energy shall not be liable for the failure to perform any
obligation in terms of this Proposal if and to such extent a Force Majeure causes
such failure
86-Ali Town, Rawind Road, Lahore (Pakistan) | Tel: +9230 515 999 06 | Email: info@landmarkenergy.com.pk
Quotation # LME/23/TPS/09
Date: 10.10.2023
If the order is cancelled by the client after PO issuance, LandMark Energy (Pvt) Ltd. reserves the right to
charge stocking fee of 25 % of the selling price of the offered equipment.
Customer will be responsible to provide site access to LandMark Energy. Safety and security of
equipment, once delivered on the premises of the customer are the responsibility of the customer.
Electrical and mechanical scope of work will be as per agreed terms & conditions.
Solar panels will have 12 years product & workmanship warranty and 30 years linear performance
warranty.
Hybrid inverters will have a warranty of 2 years with parts and 5 years of service as per respective brand
warranty policy.
All prices are subject to change without prior notice due to currency fluctuations.
86-Ali Town, Rawind Road, Lahore (Pakistan) | Tel: +9230 515 999 06 | Email: info@landmarkenergy.com.pk
Quotation # LME/23/TPS/09
Date: 10.10.2023
Net-metering process may take up to 4 months and is dependent on WAPDA and NEPRA officials.
The customer has to arrange separation of identified load according to his requirement at site.
LandMark Energy will only be responsible for Grid Input and Inverter Output. The respective cables
to be taken to and from main DB to identified place where the Solar Inverter is to be installed.
Meter sanctioned load change and I&C required other than the above-mentioned scope of work
shall be charged as per actual.
Acknowledgement
I hereby agree to the price and proposal terms mentioned above. I have read the complete document
and am fully aware of all conditions. I would also adhere to payment timelines and the scope of work
mentioned
Name: Name:
Company: Date:
Date:
CNIC/NTN:
86-Ali Town, Rawind Road, Lahore (Pakistan) | Tel: +9230 515 999 06 | Email: info@landmarkenergy.com.pk