70
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP
Moment capacity calculations for ULS of 200 mm thick slab Top and Botom Mesh with 40mm cover
Moment capacity of main top and bottom reinforcement of 200 mm thick Slab --
Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 150 200 200 -
Area of steel provided, Asp = 523.60 0.00 0.00 -
Total Area of steel provided 523.60 SAFE
71
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP
Moment capacity of Secondary top and bottom secondary reinforcement of 200 mm thick Slab --
Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 175 200 200 -
Area of steel provided, Asp = 448.80 0.00 0.00 -
Total Area of steel provided 448.80 SAFE
72
132/11kV WADI ABA SALEEL-1 S/S Date : 11.01.23
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP
Moment capacity calculations for ULS of 200 mm thick slab Top and Botom Mesh with 40mm cover
Moment capacity of main top and bottom reinforcement of 200 mm thick Slab --
Diameter of reinforcement, = 10 10 0
Spacing of reinforcement, s = 150 150 200 10@150 Extra
Area of steel provided, Asp = 523.60 523.60 0.00 -
Total Area of steel provided 1047.20 SAFE
73
132/11kV WADI ABA SALEEL-1 S/S Date : 11.01.23
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP
Moment capacity of secondary top and bottom secondary reinforcement of 200 mm thick Slab --
Diameter of reinforcement, = 10 10 0
Spacing of reinforcement, s = 175 175 200 10@175 Extra
Area of steel provided, Asp = 448.80 448.80 0.00 -
Total Area of steel provided 897.60 SAFE
74
ETABS 17.0.1 1/11/2023
A X
-20.0 -15.9 -11.8 -7.8 -3.7 0.4 4.5 8.5 12.6 16.7 20.8 24.8 28.9 33.0
Wadi 10.01.23.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]
75
ETABS 17.0.1 1/11/2023
Bottom Main reinforcement 10@150 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not
Y
required.
A X
33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
Wadi 10.01.23.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]
76
ETABS 17.0.1 1/11/2023
A X
-50.0 -44.2 -38.3 -32.5 -26.6 -20.8 -14.9 -9.1 -3.2 2.6 8.5 14.3 20.2 26.0
Wadi 10.01.23.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]
77
ETABS 17.0.1 1/11/2023
Bottom Secondary reinforcement 10@175 capacity 26 kN-m Beyond 26 kN-m moments are not developing. So further extra reinforcement not
Y
required.
A X
26.0 26.0 26.0 26.0 26.0 26.0 26.0 26.0 26.0 26.0 26.0 26.0 26.0 26.0
Wadi 10.01.23.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]
78
ETABS 17.0.1 1/11/2023
A X
-33.0 -28.2 -23.3 -18.5 -13.6 -8.8 -3.9 0.9 5.8 10.6 15.5 20.3 25.2 30.0
Wadi 10.01.23.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]
79
ETABS 17.0.1 1/11/2023
A X
-33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0
Wadi 10.01.23.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]
80
ETABS 17.0.1 1/11/2023
A X
-50.0 -44.6 -39.2 -33.8 -28.5 -23.1 -17.7 -12.3 -6.9 -1.5 3.8 9.2 14.6 20.0
Wadi 10.01.23.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]
81
ETABS 17.0.1 1/11/2023
Top Secondary reinforcement 10@175 capacity 26 kN-m Beyond 26 kN-m moments are developing. So extra reinforcement provided
in highlighlited portions Y
A X
-50.0 -48.2 -46.3 -44.5 -42.6 -40.8 -38.9 -37.1 -35.2 -33.4 -31.5 -29.7 -27.8 -26.0
Wadi 10.01.23.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]
82
ETABS 17.0.1 1/11/2023
Top Secondary reinforcementY 10@175+10@175 capacity 50 kN-m Beyond 50 kN-m no moments are developing. So further extra reinforcement not
required.
A X
-50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0 -50.0
Wadi 10.01.23.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]