Professional Documents
Culture Documents
Upper ROOF SLAB
Upper ROOF SLAB
22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP
Moment capacity calculations for ULS of 250 mm thick slab Top and Botom Mesh with 40mm cover
Moment capacity of main top and bottom reinforcement of 250 mm thick Slab --
Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 200 200 200 -
Area of steel provided, Asp = 392.70 0.00 0.00 -
Total Area of steel provided 392.70 SAFE
84
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP
Moment capacity of secondary top and bottom secondary reinforcement of 250 mm thick Slab --
Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 200 200 200 -
Area of steel provided, Asp = 392.70 0.00 0.00 -
Total Area of steel provided 392.70 SAFE
85
ETABS 17.0.1 12/15/2022
-3.8 -1.9 0.0 1.9 3.8 5.7 7.6 9.5 11.4 13.3 15.2 17.1 19.0 20.9
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]
86
ETABS 17.0.1 12/15/2022
Bottom Main reinforcement 10@200 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not
required.
33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]
87
ETABS 17.0.1 12/15/2022
-10.5 -9.0 -7.5 -6.0 -4.5 -3.0 -1.5 0.0 1.5 3.0 4.5 6.0 7.5 9.0
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]
88
ETABS 17.0.1 12/15/2022
Bottom Secondary reinforcement 10@200 capacity 31 kN-m Beyond 31 kN-m moments are not developing. So further extra reinforcement not
required.
31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]
89
ETABS 17.0.1 12/15/2022
-28.8 -26.4 -24.0 -21.6 -19.2 -16.8 -14.4 -12.0 -9.6 -7.2 -4.8 -2.4 0.0 2.4
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]
90
ETABS 17.0.1 12/15/2022
Top Main reinforcement 10@200 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not required.
-33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]
91
ETABS 17.0.1 12/15/2022
-20.0 -18.0 -16.0 -14.0 -12.0 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]
92
ETABS 17.0.1 12/15/2022
Top Secondary reinforcement 10@200 capacity 31 kN-m Beyond 31 kN-m moments are not developing. So further extra reinforcement not
required.
-31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]
93
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP
Moment capacity calculations for ULS of 200 mm thick slab Top and Botom Mesh with 40mm cover
Moment capacity of main top and bottom reinforcement of 200 mm thick Slab --
Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 150 200 200 -
Area of steel provided, Asp = 523.60 0.00 0.00 -
Total Area of steel provided 523.60 SAFE
94
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP
Moment capacity of Secondary top and bottom secondary reinforcement of 200 mm thick Slab --
Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 200 200 200 -
Area of steel provided, Asp = 392.70 0.00 0.00 -
Total Area of steel provided 392.70 SAFE
95
ETABS 17.0.1 12/15/2022
-14.4 -12.8 -11.2 -9.6 -8.0 -6.4 -4.8 -3.2 -1.6 0.0 1.6 3.2 4.8 6.4
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M11 Diagram (ULS) [kN-m/m]
96
ETABS 17.0.1 12/15/2022
Bottom Main reinforcement 10@150 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not
required.
33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M11 Diagram (ULS) [kN-m/m]
97
ETABS 17.0.1 12/15/2022
-8.00 -7.00 -6.00 -5.00 -4.00 -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 4.00 5.00
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M22 Diagram (ULS) [kN-m/m]
98
ETABS 17.0.1 12/15/2022
Bottom Secondary reinforcement 10@200 capacity 23 kN-m Beyond 23 kN-m moments are not developing. So further extra reinforcement not
required.
23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M22 Diagram (ULS) [kN-m/m]
99
ETABS 17.0.1 12/15/2022
3.31m LVL
-19.8 -18.0 -16.2 -14.4 -12.6 -10.8 -9.0 -7.2 -5.4 -3.6 -1.8 0.0 1.8 3.6
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M11 Diagram (ULS) [kN-m/m]
100
ETABS 17.0.1 12/15/2022
Top Main reinforcement 10@150 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not required.
-33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M11 Diagram (ULS) [kN-m/m]
101
ETABS 17.0.1 12/15/2022
-13.0 -11.7 -10.4 -9.1 -7.8 -6.5 -5.2 -3.9 -2.6 -1.3 0.0 1.3 2.6 3.9
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M22 Diagram (ULS) [kN-m/m]
102
ETABS 17.0.1 12/15/2022
Top Secondary reinforcement 10@200 capacity 23 kN-m Beyond 23 kN-m moments are not developing. So further extra reinforcement not
required.
-23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M22 Diagram (ULS) [kN-m/m]
103
Project : 132/11kV WADI ABA SALEEL-1 S/S DOC. NO. DATE
104
Stair Case -2 8/1/2017 12:05 AM
1 2 3 4 5 6 7 8 9
H
E-3
500
400
G
300
F 200
100
E
-100
-200
-300
D
-400
-500
C
Maximum allowable deflection = Span/250
= 6885/250 -600
= 27.54 mm or 20 mm
-700
Deflection obtained = 0.8mm < 20 mm
(Hence safe) -800
B
X A
105
Stair Case -2 8/1/2017 12:05 AM
106
LONG -TERM DEFLECTION CHECK
Stair Case -2 8/1/2017 12:06 AM
1 2 3 4 5 6 7 8 9
0.60
0.45
G
0.30
F 0.15
0.00
-0.15
E
-0.30
-0.45
-0.60
D
-0.75
-0.90
C
-1.05
X A
107
Stair Case -2 8/1/2017 12:06 AM
0.60
0.45
0.30
0.15
0.00
-0.15
-0.30
-0.45
-0.60
-0.75
-0.90
-1.05
-1.20
-1.35
Maximum allowable deflection = Span/250
= 6885/250
= 27.54 mm or 20 mm
Deflection obtained = 1.35mm < 20 mm
(Hence safe)
108
SHORT-TERM DEFLECTION CHECK
1 2 3 4 5 6 7 8 9
H
1.00
0.50
0.00
G
-0.50
F
-1.00
-1.50
-2.00
E
-2.50
-3.00
D -3.50
-4.00
C
-4.50
-5.00
= 21.92 mm or 20 mm
Y
Deflection obtained = 5.5mm < 20 mm
(Hence safe)
X A
109
Lower roof 8/1/2017 12:04 AM
110
LONG-TERM DEFLECTION CHECK
1 2 3 4 5 6 7 8 9
H
3.0
1.5
0.0
G
-1.5
F
-3.0
-4.5
-6.0
E
-7.5
-9.0
D -10.5
-12.0
C
-13.5
-15.0
-16.5
Maximum allowable deflection = Span/250 B
= 5480/250
Y = 21.92 mm or 20 mm
Deflection obtained = 16.5mm < 20 mm
X (Hence safe) A
111
Lower roof 8/1/2017 12:06 AM
112
Project : 132/11kV WADI ABA SALEEL-1 S/S DOC. NO. DATE
158
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP
Moment capacity calculations for ULS of 200 mm thick slab Top and Botom Mesh with 40mm cover
Moment capacity of main top and bottom reinforcement of 200 mm thick Slab --
Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 150 200 200 -
Area of steel provided, Asp = 523.60 0.00 0.00 -
Total Area of steel provided 523.60 SAFE
159
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP
Moment capacity of Secondary top and bottom secondary reinforcement of 200 mm thick Slab --
Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 150 200 200 -
Area of steel provided, Asp = 523.60 0.00 0.00 -
Total Area of steel provided 523.60 SAFE
160
ETABS 17.0.1 12/15/2022
A
X
-26.0 -21.5 -16.9 -12.4 -7.8 -3.3 1.2 5.8 10.3 14.8 19.4 23.9 28.5 33.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]
161
ETABS 17.0.1 12/15/2022
Bottom Main reinforcement 10@150 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not
required. Y
A
X
33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]
162
ETABS 17.0.1 12/15/2022
1 2 3 4 5 6 7 8 9
200thk Slab Bottom Secondary Direction
H
A
X
-20.0 -16.1 -12.2 -8.2 -4.3 -0.4 3.5 7.5 11.4 15.3 19.2 23.2 27.1 31.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]
163
ETABS 17.0.1 12/15/2022
1 2 3 4 5 6 7 8 9
200thk Slab Bottom Secondary Direction
H
Y
Bottom Secondary reinforcement 10@150 capacity 31 kN-m Beyond 31 kN-m moments are not developing. So further extra reinforcement
not required.
A
X
31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]
164
ETABS 17.0.1 12/15/2022
1 2 3 4 5 6 7 8 9
200thk Slab Top Main Direction
H
A
X
-33.0 -28.5 -23.9 -19.4 -14.8 -10.3 -5.8 -1.2 3.3 7.8 12.4 16.9 21.5 26.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]
165
ETABS 17.0.1 12/15/2022
A
X
-33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]
166
ETABS 17.0.1 12/15/2022
A
X
-31.0 -27.1 -23.2 -19.2 -15.3 -11.4 -7.5 -3.5 0.4 4.3 8.2 12.2 16.1 20.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]
167
ETABS 17.0.1 12/15/2022
Top Secondary reinforcement 10@150 capacity 31 kN-m Beyond 31 kN-m moments are not developing. So further extra reinforcement not
required. Y
A
X
-31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]
168
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP
Moment capacity calculations for ULS of 200 mm thick slab Top and Botom Mesh with 40mm cover
Moment capacity of main top and bottom reinforcement of 200 mm thick Slab --
Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 150 200 200 -
Area of steel provided, Asp = 523.60 0.00 0.00 -
Total Area of steel provided 523.60 SAFE
169
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP
Moment capacity of Secondary top and bottom secondary reinforcement of 200 mm thick Slab --
Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 200 200 200 -
Area of steel provided, Asp = 392.70 0.00 0.00 -
Total Area of steel provided 392.70 SAFE
170
ETABS 17.0.1 12/15/2022
-3.0 -2.0 -1.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M22 Diagram (ULS) [kN-m/m]
171
ETABS 17.0.1 12/15/2022
Bottom Main reinforcement 10@150 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not
required.
33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M22 Diagram (ULS) [kN-m/m]
172
ETABS 17.0.1 12/15/2022
-8.40 -7.20 -6.00 -4.80 -3.60 -2.40 -1.20 0.00 1.20 2.40 3.60 4.80 6.00 7.20
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M11 Diagram (ULS) [kN-m/m]
173
ETABS 17.0.1 12/15/2022
Bottom Secondary reinforcement 10@200 capacity 23 kN-m Beyond 23 kN-m moments are not developing. So further extra reinforcement not
required.
23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M11 Diagram (ULS) [kN-m/m]
174
ETABS 17.0.1 12/15/2022
-9.10 -7.80 -6.50 -5.20 -3.90 -2.60 -1.30 0.00 1.30 2.60 3.90 5.20 6.50 7.80
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M22 Diagram (ULS) [kN-m/m]
175
ETABS 17.0.1 12/15/2022
Top Main reinforcement 10@150 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not required.
-33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M22 Diagram (ULS) [kN-m/m]
176
ETABS 17.0.1 12/15/2022
-11.7 -10.4 -9.1 -7.8 -6.5 -5.2 -3.9 -2.6 -1.3 0.0 1.3 2.6 3.9 5.2
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M11 Diagram (ULS) [kN-m/m]
177
ETABS 17.0.1 12/15/2022
Top Secondary reinforcement 10@200 capacity 23 kN-m Beyond 23 kN-m moments are not developing. So further extra reinforcement not
required.
-23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M11 Diagram (ULS) [kN-m/m]
178