You are on page 1of 50

132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.

22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP

Moment capacity calculations for ULS of 250 mm thick slab Top and Botom Mesh with 40mm cover
Moment capacity of main top and bottom reinforcement of 250 mm thick Slab --

Thickness of Slab, D = 250 mm


Width of Slab, b = 1000 mm
Diametre of reinforcement, = 10 mm
Clear cover to reinforcement, dc = 40 mm
Effective depth, d = 205 mm
2
Yield Stress of reinforcement, fyk = 500 N/mm
2
Grade of Concrete, fck = 28 N/mm
2
fctm = 2.77 N/mm

Moment Capacity= 33 kN.m


2
K = Mu / (b.d .fck) = 0.028
K' = 0.167 (Assuming no distribution of moment)
K < K' Compression reinforcement not required

Leverarm, z = d [0.5+(0.25 - K/1.134)1/2] = 199.80 mm


0.95 d = 194.75 mm
Leverarm considered for design, z = 194.75 mm

Minimum area of steel As,min = 0.26(fctm/fyk).bt.d > 0.13%bd


= 295.28 mm
Area of steel required, Asr= [ Mu / (0.87 . fyk .z) ] =
2
389.54 mm
Reinforcement Provided =

Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 200 200 200 -
Area of steel provided, Asp = 392.70 0.00 0.00 -
Total Area of steel provided 392.70 SAFE

84
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP

Moment capacity of secondary top and bottom secondary reinforcement of 250 mm thick Slab --

Thickness of Slab, D = 250 mm


Width of Slab, b = 1000 mm
Diametre of reinforcement, = 10 mm
Clear cover to reinforcement, dc = 50 mm
Effective depth, d = 195 mm
2
Yield Stress of reinforcement, fyk = 500 N/mm
2
Grade of Concrete, fck = 28 N/mm
2
fctm = 2.77 N/mm

Moment Capacity= 31 kN.m


2
K = Mu / (b.d .fck) = 0.029
K' = 0.167 (Assuming no distribution of moment)
K < K' Compression reinforcement not required

Leverarm, z = d [0.5+(0.25 - K/1.134)1/2] = 189.86 mm


0.95 d = 185.25 mm
Leverarm considered for design, z = 185.25 mm

Minimum area of steel As,min = 0.26(fctm/fyk).bt.d > 0.13%bd


= 280.88 mm
Area of steel required, Asr= [ Mu / (0.87 . fyk .z) ] =
2
384.69 mm
Reinforcement Provided =

Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 200 200 200 -
Area of steel provided, Asp = 392.70 0.00 0.00 -
Total Area of steel provided 392.70 SAFE

85
ETABS 17.0.1 12/15/2022

250thk Slab Bottom Main Direction


5.873m LVL

-3.8 -1.9 0.0 1.9 3.8 5.7 7.6 9.5 11.4 13.3 15.2 17.1 19.0 20.9
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]

86
ETABS 17.0.1 12/15/2022

250thk Slab Bottom Main Direction

Bottom Main reinforcement 10@200 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not
required.

33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]

87
ETABS 17.0.1 12/15/2022

250thk Slab Bottom Secondary Direction

-10.5 -9.0 -7.5 -6.0 -4.5 -3.0 -1.5 0.0 1.5 3.0 4.5 6.0 7.5 9.0
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]

88
ETABS 17.0.1 12/15/2022

250thk Slab Bottom Secondary Direction

Bottom Secondary reinforcement 10@200 capacity 31 kN-m Beyond 31 kN-m moments are not developing. So further extra reinforcement not
required.

31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]

89
ETABS 17.0.1 12/15/2022

250thk Slab Top Main Direction

-28.8 -26.4 -24.0 -21.6 -19.2 -16.8 -14.4 -12.0 -9.6 -7.2 -4.8 -2.4 0.0 2.4
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]

90
ETABS 17.0.1 12/15/2022

250thk Slab Top Main Direction

Top Main reinforcement 10@200 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not required.

-33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]

91
ETABS 17.0.1 12/15/2022

250thk Slab Top Secondary Direction

-20.0 -18.0 -16.0 -14.0 -12.0 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]

92
ETABS 17.0.1 12/15/2022

250thk Slab Top Secondary Direction

Top Secondary reinforcement 10@200 capacity 31 kN-m Beyond 31 kN-m moments are not developing. So further extra reinforcement not
required.

-31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0
Wadi 07.12.22.EDB Plan View - Lower Roof - Z = 7.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]

93
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP

Moment capacity calculations for ULS of 200 mm thick slab Top and Botom Mesh with 40mm cover
Moment capacity of main top and bottom reinforcement of 200 mm thick Slab --

Thickness of Slab, D = 200 mm


Width of Slab, b = 1000 mm
Diametre of reinforcement, = 10 mm
Clear cover to reinforcement, dc = 40 mm
Effective depth, d = 155 mm
2
Yield Stress of reinforcement, fyk = 500 N/mm
2
Grade of Concrete, fck = 28 N/mm
2
fctm = 2.77 N/mm

Moment Capacity= 33 kN.m


2
K = Mu / (b.d .fck) = 0.049
K' = 0.167 (Assuming no distribution of moment)
K < K' Compression reinforcement not required

Leverarm, z = d [0.5+(0.25 - K/1.134)1/2] = 147.98 mm


0.95 d = 147.25 mm
Leverarm considered for design, z = 147.25 mm

Minimum area of steel As,min = 0.26(fctm/fyk).bt.d > 0.13%bd


= 223.26 mm
Area of steel required, Asr= [ Mu / (0.87 . fyk .z) ] =
2
515.19 mm
Reinforcement Provided =

Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 150 200 200 -
Area of steel provided, Asp = 523.60 0.00 0.00 -
Total Area of steel provided 523.60 SAFE

94
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP

Moment capacity of Secondary top and bottom secondary reinforcement of 200 mm thick Slab --

Thickness of Slab, D = 200 mm


Width of Slab, b = 1000 mm
Diametre of reinforcement, = 10 mm
Clear cover to reinforcement, dc = 50 mm
Effective depth, d = 145 mm
2
Yield Stress of reinforcement, fyk = 500 N/mm
2
Grade of Concrete, fck = 28 N/mm
2
fctm = 2.77 N/mm

Moment Capacity= 23 kN.m


2
K = Mu / (b.d .fck) = 0.039
K' = 0.167 (Assuming no distribution of moment)
K < K' Compression reinforcement not required

Leverarm, z = d [0.5+(0.25 - K/1.134)1/2] = 139.82 mm


0.95 d = 137.75 mm
Leverarm considered for design, z = 137.75 mm

Minimum area of steel As,min = 0.26(fctm/fyk).bt.d > 0.13%bd


= 208.86 mm
Area of steel required, Asr= [ Mu / (0.87 . fyk .z) ] =
2
383.84 mm
Reinforcement Provided =

Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 200 200 200 -
Area of steel provided, Asp = 392.70 0.00 0.00 -
Total Area of steel provided 392.70 SAFE

95
ETABS 17.0.1 12/15/2022

200thk Slab Bottom Main Direction

-14.4 -12.8 -11.2 -9.6 -8.0 -6.4 -4.8 -3.2 -1.6 0.0 1.6 3.2 4.8 6.4
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M11 Diagram (ULS) [kN-m/m]

96
ETABS 17.0.1 12/15/2022

200thk Slab Bottom Main Direction

Bottom Main reinforcement 10@150 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not
required.

33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M11 Diagram (ULS) [kN-m/m]

97
ETABS 17.0.1 12/15/2022

200thk Slab Bottom Secondary Direction

-8.00 -7.00 -6.00 -5.00 -4.00 -3.00 -2.00 -1.00 0.00 1.00 2.00 3.00 4.00 5.00
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M22 Diagram (ULS) [kN-m/m]

98
ETABS 17.0.1 12/15/2022

200thk Slab Bottom Secondary Direction

Bottom Secondary reinforcement 10@200 capacity 23 kN-m Beyond 23 kN-m moments are not developing. So further extra reinforcement not
required.

23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M22 Diagram (ULS) [kN-m/m]

99
ETABS 17.0.1 12/15/2022

200thk Slab Top Main Direction

3.31m LVL

-19.8 -18.0 -16.2 -14.4 -12.6 -10.8 -9.0 -7.2 -5.4 -3.6 -1.8 0.0 1.8 3.6
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M11 Diagram (ULS) [kN-m/m]

100
ETABS 17.0.1 12/15/2022

200thk Slab Top Main Direction

Top Main reinforcement 10@150 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not required.

-33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M11 Diagram (ULS) [kN-m/m]

101
ETABS 17.0.1 12/15/2022

200thk Slab Top Secondary Direction

-13.0 -11.7 -10.4 -9.1 -7.8 -6.5 -5.2 -3.9 -2.6 -1.3 0.0 1.3 2.6 3.9
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M22 Diagram (ULS) [kN-m/m]

102
ETABS 17.0.1 12/15/2022

200thk Slab Top Secondary Direction

Top Secondary reinforcement 10@200 capacity 23 kN-m Beyond 23 kN-m moments are not developing. So further extra reinforcement not
required.

-23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0
Wadi 07.12.22.EDB Plan View - Stair case-2 - Z = 3.31 (m) Resultant M22 Diagram (ULS) [kN-m/m]

103
Project : 132/11kV WADI ABA SALEEL-1 S/S DOC. NO. DATE

Contractor : L & T Qatar


End User : KAHRAMAA DESIGNED CHECKED APPROVED
Title : Roof UDY MIM VRP

104
Stair Case -2 8/1/2017 12:05 AM

1 2 3 4 5 6 7 8 9

H
E-3

500

400
G

300

F 200

100

E
-100

-200

-300
D

-400

-500
C
Maximum allowable deflection = Span/250
= 6885/250 -600

= 27.54 mm or 20 mm
-700
Deflection obtained = 0.8mm < 20 mm
(Hence safe) -800
B

X A

SAFE 2016 16.0.0 Deformed Shape - Displacements (SLS) Min [mm] kN - m

105
Stair Case -2 8/1/2017 12:05 AM

Maximum allowable deflection = Span/250


= 6885/250
= 27.54 mm or 20 mm
Deflection obtained = 0.8mm < 20 mm
(Hence safe)
SAFE 2016 16.0.0 Deformed Shape - Displacements (SLS) Min [mm] kN - m

106
LONG -TERM DEFLECTION CHECK
Stair Case -2 8/1/2017 12:06 AM

1 2 3 4 5 6 7 8 9

0.60

0.45
G

0.30

F 0.15

0.00

-0.15

E
-0.30

-0.45

-0.60
D

-0.75

-0.90
C

-1.05

Maximum allowable deflection = Span/250


-1.20
= 6885/250
= 27.54 mm or 20 mm
B -1.35
Deflection obtained = 1.35mm < 20 mm
(Hence safe)
Y

X A

SAFE 2016 16.0.0 Deformed Shape - Displacements (LTD) [mm] kN - m

107
Stair Case -2 8/1/2017 12:06 AM

0.60

0.45

0.30

0.15

0.00

-0.15

-0.30

-0.45

-0.60

-0.75

-0.90

-1.05

-1.20

-1.35
Maximum allowable deflection = Span/250
= 6885/250
= 27.54 mm or 20 mm
Deflection obtained = 1.35mm < 20 mm
(Hence safe)

SAFE 2016 16.0.0 Deformed Shape - Displacements (LTD) [mm] kN - m

108
SHORT-TERM DEFLECTION CHECK

Lower Roof 11.1.23 8/1/2017 12:02 AM

1 2 3 4 5 6 7 8 9

H
1.00

0.50

0.00

G
-0.50

F
-1.00

-1.50

-2.00
E
-2.50

-3.00

D -3.50

-4.00

C
-4.50

-5.00

Maximum allowable deflection = Span/250 -5.50


= 5480/250 B

= 21.92 mm or 20 mm
Y
Deflection obtained = 5.5mm < 20 mm
(Hence safe)
X A

SAFE 2016 16.0.0 Deformed Shape - Displacements (SLS) Min [mm] kN - m

109
Lower roof 8/1/2017 12:04 AM

Maximum allowable deflection = Span/250


= 5480/250
= 21.92 mm or 20 mm
Deflection obtained = 5.5mm < 20 mm
(Hence safe)

SAFE 2016 16.0.0 Deformed Shape - Displacements (SLS) Min [mm] kN - m

110
LONG-TERM DEFLECTION CHECK

Lower Roof 11.1.23 8/1/2017 12:04 AM

1 2 3 4 5 6 7 8 9

H
3.0

1.5

0.0

G
-1.5

F
-3.0

-4.5

-6.0
E
-7.5

-9.0

D -10.5

-12.0

C
-13.5

-15.0

-16.5
Maximum allowable deflection = Span/250 B

= 5480/250
Y = 21.92 mm or 20 mm
Deflection obtained = 16.5mm < 20 mm
X (Hence safe) A

SAFE 2016 16.0.0 Deformed Shape - Displacements (LTD) [mm] kN - m

111
Lower roof 8/1/2017 12:06 AM

Maximum allowable deflection = Span/250


= 5480/250
= 21.92 mm or 20 mm
Deflection obtained = 16.5mm < 20 mm
(Hence safe)
SAFE 2016 16.0.0 Deformed Shape - Displacements (LTD) [mm] kN - m

112
Project : 132/11kV WADI ABA SALEEL-1 S/S DOC. NO. DATE

Contractor : L & T Qatar


End User : KAHRAMAA DESIGNED CHECKED APPROVED
Title : Roof UDY MIM VRP

158
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP

Moment capacity calculations for ULS of 200 mm thick slab Top and Botom Mesh with 40mm cover
Moment capacity of main top and bottom reinforcement of 200 mm thick Slab --

Thickness of Slab, D = 200 mm


Width of Slab, b = 1000 mm
Diametre of reinforcement, = 10 mm
Clear cover to reinforcement, dc = 40 mm
Effective depth, d = 155 mm
2
Yield Stress of reinforcement, fyk = 500 N/mm
2
Grade of Concrete, fck = 28 N/mm
2
fctm = 2.77 N/mm

Moment Capacity= 33 kN.m


2
K = Mu / (b.d .fck) = 0.049
K' = 0.167 (Assuming no distribution of moment)
K < K' Compression reinforcement not required

Leverarm, z = d [0.5+(0.25 - K/1.134)1/2] = 147.98 mm


0.95 d = 147.25 mm
Leverarm considered for design, z = 147.25 mm

Minimum area of steel As,min = 0.26(fctm/fyk).bt.d > 0.13%bd


= 223.26 mm
Area of steel required, Asr= [ Mu / (0.87 . fyk .z) ] =
2
515.19 mm
Reinforcement Provided =

Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 150 200 200 -
Area of steel provided, Asp = 523.60 0.00 0.00 -
Total Area of steel provided 523.60 SAFE

159
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP

Moment capacity of Secondary top and bottom secondary reinforcement of 200 mm thick Slab --

Thickness of Slab, D = 200 mm


Width of Slab, b = 1000 mm
Diametre of reinforcement, = 10 mm
Clear cover to reinforcement, dc = 50 mm
Effective depth, d = 145 mm
2
Yield Stress of reinforcement, fyk = 500 N/mm
2
Grade of Concrete, fck = 28 N/mm
2
fctm = 2.77 N/mm

Moment Capacity= 31 kN.m


2
K = Mu / (b.d .fck) = 0.053
K' = 0.167 (Assuming no distribution of moment)
K < K' Compression reinforcement not required

Leverarm, z = d [0.5+(0.25 - K/1.134)1/2] = 137.92 mm


0.95 d = 137.75 mm
Leverarm considered for design, z = 137.75 mm

Minimum area of steel As,min = 0.26(fctm/fyk).bt.d > 0.13%bd


= 208.86 mm
Area of steel required, Asr= [ Mu / (0.87 . fyk .z) ] =
2
517.35 mm
Reinforcement Provided =

Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 150 200 200 -
Area of steel provided, Asp = 523.60 0.00 0.00 -
Total Area of steel provided 523.60 SAFE

160
ETABS 17.0.1 12/15/2022

200thk Slab Bottom Main Direction


1 2 3 4 5 6 7 8 9

A
X
-26.0 -21.5 -16.9 -12.4 -7.8 -3.3 1.2 5.8 10.3 14.8 19.4 23.9 28.5 33.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]

161
ETABS 17.0.1 12/15/2022

200thk Slab Bottom Main 1Direction2 3 4 5 6 7 8 9

Bottom Main reinforcement 10@150 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not
required. Y

A
X
33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]

162
ETABS 17.0.1 12/15/2022

1 2 3 4 5 6 7 8 9
200thk Slab Bottom Secondary Direction
H

A
X
-20.0 -16.1 -12.2 -8.2 -4.3 -0.4 3.5 7.5 11.4 15.3 19.2 23.2 27.1 31.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]

163
ETABS 17.0.1 12/15/2022

1 2 3 4 5 6 7 8 9
200thk Slab Bottom Secondary Direction
H

Y
Bottom Secondary reinforcement 10@150 capacity 31 kN-m Beyond 31 kN-m moments are not developing. So further extra reinforcement
not required.
A
X
31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0 31.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]

164
ETABS 17.0.1 12/15/2022

1 2 3 4 5 6 7 8 9
200thk Slab Top Main Direction
H

A
X
-33.0 -28.5 -23.9 -19.4 -14.8 -10.3 -5.8 -1.2 3.3 7.8 12.4 16.9 21.5 26.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]

165
ETABS 17.0.1 12/15/2022

200thk Slab Top Main Direction


1 2 3 4 5 6 7 8 9

Top Main reinforcement


Y
10@150 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not required.

A
X
-33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M11 Diagram (ULS) [kN-m/m]

166
ETABS 17.0.1 12/15/2022

200thk Slab Top Secondary


1 Direction
2 3 4 5 6 7 8 9

A
X
-31.0 -27.1 -23.2 -19.2 -15.3 -11.4 -7.5 -3.5 0.4 4.3 8.2 12.2 16.1 20.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]

167
ETABS 17.0.1 12/15/2022

1 2 3 4 5 6 7 8 9 200thk Slab Top Secondary Direction

Top Secondary reinforcement 10@150 capacity 31 kN-m Beyond 31 kN-m moments are not developing. So further extra reinforcement not
required. Y

A
X
-31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0 -31.0
Wadi 07.12.22.EDB Plan View - Roof - Z = 10.23 (m) Resultant M22 Diagram (ULS) [kN-m/m]

168
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP

Moment capacity calculations for ULS of 200 mm thick slab Top and Botom Mesh with 40mm cover
Moment capacity of main top and bottom reinforcement of 200 mm thick Slab --

Thickness of Slab, D = 200 mm


Width of Slab, b = 1000 mm
Diametre of reinforcement, = 10 mm
Clear cover to reinforcement, dc = 40 mm
Effective depth, d = 155 mm
2
Yield Stress of reinforcement, fyk = 500 N/mm
2
Grade of Concrete, fck = 28 N/mm
2
fctm = 2.77 N/mm

Moment Capacity= 33 kN.m


2
K = Mu / (b.d .fck) = 0.049
K' = 0.167 (Assuming no distribution of moment)
K < K' Compression reinforcement not required

Leverarm, z = d [0.5+(0.25 - K/1.134)1/2] = 147.98 mm


0.95 d = 147.25 mm
Leverarm considered for design, z = 147.25 mm

Minimum area of steel As,min = 0.26(fctm/fyk).bt.d > 0.13%bd


= 223.26 mm
Area of steel required, Asr= [ Mu / (0.87 . fyk .z) ] =
2
515.19 mm
Reinforcement Provided =

Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 150 200 200 -
Area of steel provided, Asp = 523.60 0.00 0.00 -
Total Area of steel provided 523.60 SAFE

169
132/11kV WADI ABA SALEEL-1 S/S Date : 11.12.22
Part : Main Building Prepared By : SAR
Job No : GTC/735A/2015 Checked By : MIM
Title : Super Structure Approved By: VRP

Moment capacity of Secondary top and bottom secondary reinforcement of 200 mm thick Slab --

Thickness of Slab, D = 200 mm


Width of Slab, b = 1000 mm
Diametre of reinforcement, = 10 mm
Clear cover to reinforcement, dc = 50 mm
Effective depth, d = 145 mm
2
Yield Stress of reinforcement, fyk = 500 N/mm
2
Grade of Concrete, fck = 28 N/mm
2
fctm = 2.77 N/mm

Moment Capacity= 23 kN.m


2
K = Mu / (b.d .fck) = 0.039
K' = 0.167 (Assuming no distribution of moment)
K < K' Compression reinforcement not required

Leverarm, z = d [0.5+(0.25 - K/1.134)1/2] = 139.82 mm


0.95 d = 137.75 mm
Leverarm considered for design, z = 137.75 mm

Minimum area of steel As,min = 0.26(fctm/fyk).bt.d > 0.13%bd


= 208.86 mm
Area of steel required, Asr= [ Mu / (0.87 . fyk .z) ] =
2
383.84 mm
Reinforcement Provided =

Diameter of reinforcement, = 10 0 0
Spacing of reinforcement, s = 200 200 200 -
Area of steel provided, Asp = 392.70 0.00 0.00 -
Total Area of steel provided 392.70 SAFE

170
ETABS 17.0.1 12/15/2022

200thk Slab Bottom Main Direction

-3.0 -2.0 -1.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M22 Diagram (ULS) [kN-m/m]

171
ETABS 17.0.1 12/15/2022

200thk Slab Bottom Main Direction

Bottom Main reinforcement 10@150 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not
required.

33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0 33.0
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M22 Diagram (ULS) [kN-m/m]

172
ETABS 17.0.1 12/15/2022

200thk Slab Bottom Secondary Direction

-8.40 -7.20 -6.00 -4.80 -3.60 -2.40 -1.20 0.00 1.20 2.40 3.60 4.80 6.00 7.20
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M11 Diagram (ULS) [kN-m/m]

173
ETABS 17.0.1 12/15/2022

200thk Slab Bottom Secondary Direction

Bottom Secondary reinforcement 10@200 capacity 23 kN-m Beyond 23 kN-m moments are not developing. So further extra reinforcement not
required.

23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0 23.0
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M11 Diagram (ULS) [kN-m/m]

174
ETABS 17.0.1 12/15/2022

200thk Slab Top Main Direction

-9.10 -7.80 -6.50 -5.20 -3.90 -2.60 -1.30 0.00 1.30 2.60 3.90 5.20 6.50 7.80
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M22 Diagram (ULS) [kN-m/m]

175
ETABS 17.0.1 12/15/2022

200thk Slab Top Main Direction

Top Main reinforcement 10@150 capacity 33 kN-m Beyond 33 kN-m moments are not developing. So further extra reinforcement not required.

-33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0 -33.0
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M22 Diagram (ULS) [kN-m/m]

176
ETABS 17.0.1 12/15/2022

200thk Slab Top Secondary Direction

-11.7 -10.4 -9.1 -7.8 -6.5 -5.2 -3.9 -2.6 -1.3 0.0 1.3 2.6 3.9 5.2
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M11 Diagram (ULS) [kN-m/m]

177
ETABS 17.0.1 12/15/2022

200thk Slab Top Secondary Direction

Top Secondary reinforcement 10@200 capacity 23 kN-m Beyond 23 kN-m moments are not developing. So further extra reinforcement not
required.

-23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0 -23.0
Wadi 07.12.22.EDB Plan View - Head Room - Z = 10.48 (m) Resultant M11 Diagram (ULS) [kN-m/m]

178

You might also like