ANALISA SATUAN PEKERJAAN

PROGRAM PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


UPRATING INSTALASI PENGOLAHAN AIR (IPA)/PENAMBAHAN SUMUR DALAM TERLINDUNGI/BRONCAPTERING
DESA KERTAJAYA KECAMATAN CIGUGUR

NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH


DIV.1-1.5.1.1 PENGGALIAN 1 M3 TANAH BIASA SEDALAM 1 METER (UNTUK VOLUME S.D. 200 M3 DALAM SATU LOKASI)
BAHAN :

Jumlah Bahan -
UPAH :
Pekerja 0.7500 Oh 90,000.00 67,500.00
Mandor 0.0250 Oh 115,000.00 2,875.00
Jumlah Pekerja 70,375.00
Jumlah Bahan + Pekerja 70,375.00
Keuntungan 10 % 7,037.50
Jumlah Total 77,412.50
Dibulatkan 77,400.00
DIV.1-1.5.1.24 PENGURUGAN 1 M3 KEMBALI GALIAN TANAH
BAHAN :

Jumlah Bahan
UPAH :
Pekerja 0.5000 Oh 90,000.00 45,000.00
Mandor 0.0500 Oh -
Jumlah Pekerja 45,000.00
Jumlah Bahan + Pekerja 45,000.00
Keuntungan 10 % 4,500.00
Jumlah Total 49,500.00
Dibulatkan 49,500.00
DIV.1-1.5.1.27 PENGURUGAN 1 M3 PASIR URUG
BAHAN :
Pasir Urug 1.2000 m3 134,000.00 160,800.00

Jumlah Bahan 160,800.00


UPAH :
Pekerja 0.3000 Oh 90,000.00 27,000.00
Mandor 0.0100 Oh -
Jumlah Pekerja 27,000.00
Jumlah Bahan + Pekerja 187,800.00
Keuntungan 10 % -
Jumlah Total 187,800.00
Dibulatkan 187,800.00

1 dari 20
DIV.3-3.1.1.2 PEMASANGAN 1 M3 PONDASI BATU BELAH CAMPURAN 1 SP : 4 PP
BAHAN :
Batu Belah 15/20 1.2000 m3 200,000.00 240,000.00
Semen Portland 163.0000 kg 1,480.00 241,240.00
Pasir Pasang 0.5200 m3 300,000.00 156,000.00
Jumlah Bahan 637,240.00
UPAH :
Pekerja 1.5000 Oh 90,000.00 135,000.00
Tukang Batu 0.7500 Oh 105,000.00 78,750.00
Kepala Tukang 0.0750 Oh 115,000.00 8,625.00
Mandor 0.0750 Oh -
Jumlah Pekerja 222,375.00
Jumlah Bahan + Pekerja 859,615.00
Keuntungan 10 %
Jumlah Total 859,615.00
Dibulatkan 859,600.00
DIV.4-4.1.1.1 MEMBUAT 1 M3 BETON MUTU f'c = 7,4 Mpa (K 100), SLUMP (12 ± 2) CM, W/C = 0.87
BAHAN :
Semen Portland 247.000 kg 1,480.00 365,560.00
Pasir Beton 0.8690 m³ 310,000.00 269,390.00
Kerikil (Maks 30mm) 0.9990 m³ 380,000.00 379,620.00
Air 215.00 ltr
Jumlah Bahan 1,014,570.00
UPAH :
Pekerja 1.6500 Oh 90,000.00 148,500.00
Tukang Batu 0.2750 Oh 105,000.00 28,875.00
Kepala Tukang 0.0280 Oh 115,000.00 3,220.00
Mandor 0.0830 Oh -
Jumlah Pekerja 180,595.00
Jumlah Bahan + Pekerja 1,195,165.00
Keuntungan 10 %
Jumlah Total 1,195,165.00
Dibulatkan 1,195,100.00
DIV.4-4.1.1.4 MEMBUAT 1 M3 BETON MUTU f'c = 14,5 Mpa (K 175), SLUMP (12 ± 2) CM, W/C = 0.66
BAHAN :
Semen Portland 326.000 kg 1,480.00 482,480.00
Pasir Beton 0.7600 m³ 310,000.00 235,600.00
Kerikil (Maks 30mm) 1.0290 m³ 380,000.00 391,020.00
Air 215.00 ltr -
Jumlah Bahan 1,109,100.00
UPAH :
Pekerja 1.6500 Oh 90,000.00 148,500.00
Tukang Batu 0.2750 Oh 105,000.00 28,875.00
Kepala Tukang 0.0280 Oh 115,000.00 3,220.00
Mandor 0.0830 Oh - -
Jumlah Pekerja 180,595.00
Jumlah Bahan + Pekerja 1,289,695.00
Keuntungan 10 % 128,969.50
Jumlah Total 1,418,664.50
Dibulatkan 1,418,600.00

2 dari 20
DIV.4-4.1.1.13 PEMBESIAN 1 Kg DENGAN BESI POLOS ATAU BESI ULIR
BAHAN :
Besi Beton (Polos / ulir) 1.0500 kg 11,600.00 12,180.00
Kawat Beton 0.0150 kg 21,000.00 315.00
Jumlah Bahan 12,495.00
UPAH :
Pekerja 0.0070 Oh 90,000.00 630.00
Tukang Besi 0.0070 Oh 105,000.00 735.00
Kepala Tukang 0.0007 Oh 115,000.00 80.50
Mandor 0.0004 Oh -
Jumlah Pekerja 1,445.50
Jumlah Bahan + Pekerja 13,940.50
Keuntungan 10 %
Jumlah Total 13,940.50
Dibulatkan 13,900.00
DIV.4-4.1.1.15 PEMASANGAN 1 M2 BEKISTING UNTUK PONDASI
BAHAN :
Kayu Terentang Albasiah, Papan 0.0400 m³ 1,600,000.00 64,000.00
Paku 5 cm s/d 10 cm 0.3000 kg 18,000.00 5,400.00
Minyak Bekisting 0.1000 ltr 4,000.00 400.00
Jumlah Bahan 69,800.00
UPAH :
Pekerja 0.5200 Oh 90,000.00 46,800.00
Tukang Kayu 0.2600 Oh 105,000.00 27,300.00
Kepala Tukang 0.0260 Oh 115,000.00 2,990.00
Mandor 0.0260 Oh -
Jumlah Pekerja 77,090.00
Jumlah Bahan + Pekerja 146,890.00
Keuntungan 10 %
Jumlah Total 146,890.00
Dibulatkan 146,800.00
DIV.4-4.1.1.16 PEMASANGAN 1 M2 BEKISTING UNTUK SLOOF
BAHAN :
Kayu Terentang Albasiah, Papan 0.0450 m³ 1,600,000.00 72,000.00
Paku 5 cm s/d 10 cm / Paku Reng - Usuk 0.3000 kg 18,000.00 5,400.00
Minyak Bekisting 0.1000 ltr 4,000.00 400.00
Jumlah Bahan 77,800.00
UPAH :
Pekerja 0.5200 Oh 90,000.00 46,800.00
Tukang Kayu 0.2600 Oh 105,000.00 27,300.00
Kepala Tukang 0.0260 Oh 115,000.00 2,990.00
Mandor 0.0260 Oh -
Jumlah Pekerja 77,090.00
Jumlah Bahan + Pekerja 154,890.00
Keuntungan 10 %
Jumlah Total 154,890.00
Dibulatkan 154,800.00

3 dari 20
DIV.4-4.1.1.17.a PEMASANGAN 1 M2 BEKISTING UNTUK KOLOM
BAHAN :
Kayu Terentang Albasiah, Papan 0.0400 m³ 1,600,000.00 64,000.00
Paku 5 cm s/d 12 cm 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 4,000.00 800.00
Balok Kayu Lokal Klas II 0.0150 m³ 1,800,000.00 27,000.00
Multiplek t = 9 mm 0.3500 lbr 150,000.00 52,500.00
Bambu Ø - 7 - 10 cm/ 6 m 1.4000 btg 15,000.00 21,000.00
Jumlah Bahan 172,500.00
UPAH :
Pekerja 0.6600 Oh 90,000.00 59,400.00
Tukang Kayu 0.3300 Oh 105,000.00 34,650.00
Kepala Tukang 0.0330 Oh 115,000.00 3,795.00
Mandor 0.0330 Oh - -
Jumlah Pekerja 97,845.00
Jumlah Bahan + Pekerja 270,345.00
Keuntungan 10 %
Jumlah Total 270,345.00
Dibulatkan 270,300.00
DIV.4-4.1.1.18.a PEMASANGAN 1 M2 BEKISTING UNTUK BALOK
BAHAN :
Kayu Terentang Albasiah, Papan 0.0400 m³ 1,600,000.00 64,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 4,000.00 800.00
Balok Kayu Lokal Klas II 0.0180 m³ 1,800,000.00 32,400.00
Multiplek t = 9 mm 0.3500 lbr 150,000.00 52,500.00
Bambu Ø - 7 - 10 cm/ 6 m 1.4000 btg 15,000.00 21,000.00
Jumlah Bahan 177,900.00
UPAH :
Pekerja 0.6600 Oh 90,000.00 59,400.00
Tukang Kayu 0.3300 Oh 105,000.00 34,650.00
Kepala Tukang 0.0330 Oh 115,000.00 3,795.00
Mandor 0.0330 Oh - -
Jumlah Pekerja 97,845.00
Jumlah Bahan + Pekerja 275,745.00
Keuntungan 10 %
Jumlah Total 275,745.00
Dibulatkan 275,700.00

4 dari 20
DIV.4-4.1.1.19.a PEMASANGAN 1 M2 BEKISTING UNTUK LANTAI
BAHAN :
Kayu Terentang Albasiah, Papan 0.0400 m³ 1,600,000.00 64,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 4,000.00 800.00
Balok Kayu Lokal Klas II 0.0150 m³ 1,800,000.00 27,000.00
Multiplek t = 9 mm 0.3500 lbr 150,000.00 52,500.00
Bambu Ø - 7 - 10 cm/ 6 m 4.0000 btg 15,000.00 60,000.00
Jumlah Bahan 211,500.00
UPAH :
Pekerja 0.6600 Oh 90,000.00 59,400.00
Tukang Kayu 0.3300 Oh 105,000.00 34,650.00
Kepala Tukang 0.0330 Oh 115,000.00 3,795.00
Mandor 0.0330 Oh - -
Jumlah Pekerja 97,845.00
Jumlah Bahan + Pekerja 309,345.00
Keuntungan 10 %
Jumlah Total 309,345.00
Dibulatkan 309,300.00
DIV.4-4.1.1.20.a PEMASANGAN 1 M2 BEKISTING UNTUK DINDING
BAHAN :
Kayu Terentang Albasiah, Papan 0.0300 m³ 1,600,000.00 48,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.4000 kg 18,000.00 7,200.00
Minyak Bekisting 0.2000 ltr 4,000.00 800.00
Balok Kayu Lokal Klas II 0.0200 m³ 1,800,000.00 36,000.00
Multiplek t = 9 mm 0.3500 lbr 150,000.00 52,500.00
Bambu Ø - 7 - 10 cm/ 6 m 2.0000 btg 15,000.00 30,000.00
Penjaga jarak bekisting/spacer 4.0000 buah 2,500.00 10,000.00
Jumlah Bahan 184,500.00
UPAH :
Pekerja 0.6600 Oh 90,000.00 59,400.00
Tukang Kayu 0.3300 Oh 105,000.00 34,650.00
Kepala Tukang 0.0330 Oh 115,000.00 3,795.00
Mandor 0.0330 Oh - -
Jumlah Pekerja 97,845.00
Jumlah Bahan + Pekerja 282,345.00
Keuntungan 10 %
Jumlah Total 282,345.00
Dibulatkan 282,300.00
DIV.4-4.4.1.4 PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1 BATU CAMPURAN 1SP : 5PP
BAHAN :
Bata Merah 5 x 11 x 22 cm 140.0000 bh 900.00 126,000.00
Semen Portland 22.2000 kg 1,480.00 32,856.00
Pasir Pasang 0.1020 m³ 300,000.00 30,600.00
Jumlah Bahan 189,456.00
UPAH :
Pekerja 0.6000 Oh 90,000.00 54,000.00
Tukang Batu 0.2000 Oh 105,000.00 21,000.00
Kepala Tukang 0.0200 Oh 115,000.00 2,300.00
Mandor 0.0300 Oh -
Jumlah Pekerja 77,300.00
Jumlah Bahan + Pekerja 266,756.00
Keuntungan 10 %

5 dari 20
Jumlah Total 266,756.00
Dibulatkan 266,700.00
DIV.4-4.4.2.4 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM
BAHAN :
Semen Portland 6.2400 kg 1,480.00 9,235.20
Pasir Pasang 0.0240 m³ 300,000.00 7,200.00
Jumlah Bahan 16,435.20
UPAH :
Pekerja 0.3000 Oh 90,000.00 27,000.00
Tukang Batu 0.1500 Oh 105,000.00 15,750.00
Kepala Tukang 0.0150 Oh 115,000.00 1,725.00
Mandor 0.0150 Oh -
Jumlah Pekerja 44,475.00
Jumlah Bahan + Pekerja 60,910.20
Keuntungan 10 %
Jumlah Total 60,910.20
Dibulatkan 60,900.00
DIV.4-4.4.2.27 1 M2 ACIAN PC
BAHAN :
Semen Portland 3.2500 kg 1,480.00 4,810.00
Jumlah Bahan 4,810.00
UPAH :
Pekerja 0.2000 Oh 90,000.00 18,000.00
Tukang Batu 0.1000 Oh 105,000.00 10,500.00
Kepala Tukang 0.0100 Oh 115,000.00 1,150.00
Mandor 0.0100 Oh -
Jumlah Pekerja 29,650.00
Jumlah Bahan + Pekerja 34,460.00
Keuntungan 10 %
Jumlah 34,460.00
Dibulatkan 34,400.00
DIV.4-4.7.1.10 PENGECATAN 1M2 TEMBOK BARU (1 LAPIS PLAMUUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
BAHAN :
Plamuur 0.1000 kg 32,500.00 3,250.00
Cat dasar 0.1000 kg 104,000.00 10,400.00
Cat penutup 0.2600 kg 104,000.00 27,040.00
Jumlah Bahan 40,690.00
UPAH :
Pekerja 0.0200 Oh 90,000.00 1,800.00
Tukang cat 0.0630 Oh 105,000.00 6,615.00
Kepala tukang 0.0063 Oh 115,000.00 724.50
Mandor 0.0030 Oh -
Jumlah Pekerja 9,139.50
Jumlah Bahan + Pekerja 49,829.50
Keuntungan 10 %
Jumlah Total 49,829.50
Dibulatkan 49,800.00

6 dari 20
DIV.10-10.4.1.17 PEMASANGAN 1 M PIPA HDPE DIA. 63 MM
BAHAN :
Pipa HDPE dia.63 mm 1.0000 m -
Jumlah Bahan -
UPAH :
Pekerja 0.0350 Oh 90,000.00 3,150.00
Tukang Pipa 0.0170 Oh 105,000.00 1,785.00
Mandor 0.0030 Oh -
Jumlah Pekerja 4,935.00
PERALATAN :
Sewa Tripot/ Tackel 0.0190 hari -
Jumlah Peralatan -
Jumlah Bahan + Pekerja + Peralatan 4,935.00
Keuntungan 10 %
Jumlah Total 4,935.00
Dibulatkan 4,900.00
DIV.10-10.4.1.17.a PEMASANGAN 1 M PIPA HDPE DIA. 50 MM
BAHAN :
Pipa HDPE dia.50 mm 1.0000 m -
Jumlah Bahan -
UPAH :
Pekerja 0.0233 Oh 90,000.00 2,100.00
Tukang Pipa 0.0113 Oh 105,000.00 1,190.00
Mandor 0.0020 Oh - -
Jumlah Pekerja 3,290.00
PERALATAN :
Sewa Tripot/ Tackel 0.0190 hari -
Jumlah Peralatan -
Jumlah Bahan + Pekerja + Peralatan 3,290.00
Keuntungan 10 %
Jumlah Total 3,290.00
Dibulatkan 3,200.00
DIV.10-10.4.1.17.b PEMASANGAN 1 M PIPA HDPE DIA. 20 MM
BAHAN :
Pipa HDPE dia.20 mm 1.0000 m -
Jumlah Bahan -
UPAH :
Pekerja 0.0175 Oh 90,000.00 1,575.00
Tukang Pipa 0.0085 Oh 105,000.00 892.50
Mandor 0.0015 Oh - -
Jumlah Pekerja 2,467.50
PERALATAN :
Sewa Tripot/ Tackel 0.0190 hari - -
Jumlah Peralatan -
Jumlah Bahan + Pekerja + Peralatan 2,467.50
Keuntungan 10 %
Jumlah Total 2,467.50
Dibulatkan 2,400.00

7 dari 20
REKAPITULASI RENCANA ANGGARAN BIAYA
Program : Program Pengelolaan dan Pengembangan Sistem Penyediaan Air Minum
: Uprating Instalasi Pengolahan Air (IPA)/Penambahan Sumur Dalam
Kegiatan
Terlindungi/Broncaptering
Pekerjaan : Desa Kertajaya Kecamatan Cigugur
Tahun Anggaran : 2023
Jumlah Sambungan Rumah : 97 (SR)
JUMLAH HARGA
No. URAIAN PEKERJAAN Rp.
MATERIAL UPAH

A. PEKERJAAN RESEVOIR DAN BRONCAPTERING


I PEKERJAAN PERSIAPAN 6,800,000.00
II PEKERJAAN BRONCAPTERING DAN INTAKE 18,562,341.40 4,959,905.07
III PEKERJAAN RESERVOIR 98,167,208.40 26,699,508.68
B. PENGADAAN PIPA & PEMASANGAN PIPA 99,594,521.20 37,008,681.10
C. PIPA SR (Sambungan Rumah) 97 SR 45,778,298.02 4,854,202.53

JUMLAH 262,102,369.01 80,322,297.37


JUMLAH REAL COST 342,424,666.38
D ADMINISTRASI DAN OPERASIONAL KSM 14,245,000.00
JUMLAH TOTAL 356,669,666.38
DIBULATKAN 356,669,000.00

TERBILANG :
Tiga Ratus Lima Puluh Enam Juta Enam Ratus Enam Puluh Sembilan Ribu

Dibantu Oleh : Dibuat Oleh :


Tenaga Fasilitator Lapangan Kelompok Swadaya Masyarakat
(TFL) KSM AIR MINUM DESA KERTAJAYA

ASEP MARPU, S.Pd.I


ABDUL AZIS RACHMAT P, ST Ketua KSM
TFL

Diperiksa Oleh : Diperiksa Oleh :


Pelaksana Teknis Kegiatan Pelaksana Teknis Kegiatan
(PTK) (PTK)

GILANG PAMUNGKAS, A.Md. DANI RUSWANDANI, S.T.


NIP. 19900716 202203 1 005 NO. IDEKS 62019090012

Mengetahui : Menyetujui :
Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
(PPK) (PPTK)

KURNIA HENDRIANA, ST BAMBANG ARUMAN, S.ST


NIP. 19770120 200901 1 008 NIP. 19840211 201503 1 001
RINCIAN RENCANA ANGGARAN BIAYA
Program : Program Pengelolaan dan Pengembangan Sistem Penyediaan Air Minum
Kegiatan : Uprating Instalasi Pengolahan Air (IPA)/Penambahan Sumur Dalam Terlindungi/Broncaptering
Pekerjaan : Desa Kertajaya Kecamatan Cigugur
Tahun Anggaran : 2023
Jumlah Sambungan Rumah : 97 (SR)
HARGA SATUAN JUMLAH HARGA SATUAN
No. URAIAN PEKERJAAN KODE ANALIS SAT. VOL Rp. Rp.
MATERIAL UPAH MATERIAL UPAH
A. PEKERJAAN RESEVOIR DAN BRONCAPTERING
I PEKERJAAN PERSIAPAN
1 Mobilisasi Material
- Upah Angkut Material - HOK 40.00 90,000.00 3,600,000.00
2 Pengujian Laboratorium Air - Ls 2.00 1,600,000.00 3,200,000.00
Jumlah - 6,800,000.00
II PEKERJAAN BRONCAPTERING DAN INTAKE
A. PEK. TANAH DAN PONDASI
1 Pek. Galian Tanah Pondasi DIV.1-1.5.1.1 m3 5.93 70,375.00 417,323.75
2 Pek. Urugan Pasir DIV.1-1.5.1.27 m3 0.21 160,800.00 27,000.00 33,768.00 5,670.00
3 Pek. Lantai Kerja DIV.4-4.1.1.1 m3 0.21 1,014,570.00 180,595.00 213,059.70 37,924.95
4 Pek. Pondasi Pasangan Batu Kali 1 : 4 DIV.3-3.1.1.2 m3 1.50 637,240.00 222,375.00 955,860.00 333,562.50
B. PEK. BETON - -
1 Pek. Lantai Beton Tumbuk - -
a. Pek. Beton K 175 DIV.4-4.1.1.4 m3 1.05 1,109,100.00 180,595.00 1,164,555.00 189,624.75
b. Pembesian DIV.4-4.1.1.13 kg 146.16 12,495.00 1,445.50 1,826,269.20 211,274.28
2 Pek. Kolom Beton Bertulang K1 20/20 -
a. Pek. Beton K175 DIV.4-4.1.1.4 m3 0.30 1,109,100.00 180,595.00 332,730.00 54,178.50
a. Pas. Bekisting DIV.4-4.1.1.17.a m2 3.75 172,500.00 97,845.00 646,875.00 366,918.75
b. Pembesian DIV.4-4.1.1.13 kg 35.14 12,495.00 1,445.50 439,074.30 50,794.87
3 Pek. Sloof Beton Bertulang K1 20/25 -
a. Pek. Beton K175 DIV.4-4.1.1.4 m3 0.51 1,109,100.00 180,595.00 565,641.00 92,103.45
b. Pas. Bekisting DIV.4-4.1.1.16 m2 4.20 77,800.00 77,090.00 326,760.00 323,778.00
a. Pembesian DIV.4-4.1.1.13 kg 45.55 12,495.00 1,445.50 569,147.25 65,842.53
4 Pek. Balok Bertulang 20/35 -
a. Pek. Beton K175 DIV.4-4.1.1.4 m3 0.51 1,109,100.00 180,595.00 565,641.00 92,103.45
b. Pas. Bekisting DIV.4-4.1.1.18.a m2 9.18 177,900.00 97,845.00 1,633,122.00 898,217.10
c. Pembesian DIV.4-4.1.1.13 kg 45.55 12,495.00 1,445.50 569,147.25 65,842.53
5 Pek. Plat Tutup Beton Bertulang t= 10 cm -
a. Pek. Beton K175 DIV.4-4.1.1.4 m3 0.24 1,109,100.00 180,595.00 266,184.00 43,342.80
b. Pas. Bekisting DIV.4-4.1.1.19.a m2 1.60 211,500.00 97,845.00 156,552.00
c. Pembesian DIV.4-4.1.1.13 kg 32.37 12,495.00 1,445.50 404,463.15 46,790.84
6 Pek. Dinding Beton Bertulang t= 20 cm -
a. Pek. Beton K175 DIV.4-4.1.1.4 m3 1.23 1,109,100.00 180,595.00 1,364,193.00 222,131.85
b. Pas. Bekisting DIV.4-4.1.1.20.a m2 8.37 184,500.00 97,845.00 1,544,265.00 818,962.65
c. Pembesian DIV.4-4.1.1.13 kg 223.77 12,495.00 1,445.50 2,796,006.15 323,459.54
C. PEK. FINISHING - - -
1 Pek. Acian DIV.4-4.4.2.27 m2 4.84 4,810.00 29,650.00 23,280.40 143,506.00
D. PERLENGKAPAN BRONCAPTERING
1 Pipa Inlet

a. Pipa GI 2" Harsat Bahan m' 8.00 82,000.00 656,000.00

b. Knee GI 2" Harsat Bahan bh 2.00 74,000.00 148,000.00


2 Pipa Peluap

a. Pipa GI 2" Harsat Bahan m' 2.00 82,000.00 164,000.00


3 Pipa Penguras

a. Pipa GI 2" Harsat Bahan m' 2.00 82,000.00 164,000.00


4 Pipa Outlet

a. Pipa GI 2" Harsat Bahan m' 6.00 82,000.00 492,000.00

b. Socket Drat Dalam HDPE 2" Harsat Bahan bh 1.00 78,300.00 78,300.00
3 Pipa Ventilasi

a. Pipa GI 1" Harsat Bahan m' 1.00 20,000.00 20,000.00

b. TEE GI 1" Harsat Bahan bh 1.00 33,000.00 33,000.00

c. Knee GI 1" Harsat Bahan bh 2.00 24,000.00 48,000.00

d. Double Napple GI 1" Harsat Bahan bh 1.00 19,000.00 19,000.00


4 Manhole 60 x 60 cm (Plat Bordes) Harsat Bahan bh 1.00 500,000.00 500,000.00
Jumlah 18,562,341.40 4,959,905.07
III PEKERJAAN RESERVOIR
A. PEK. TANAH DAN PONDASI
1 Pek. Galian Tanah Pondasi DIV.1-1.5.1.1 m3 21.12 - 70,375.00 - 1,486,320.00
2 Pek. Urugan Pasir DIV.1-1.5.1.27 m3 1.60 160,800.00 27,000.00 257,280.00 43,200.00
3 Pek. Lantai Kerja DIV.4-4.1.1.1 m3 0.80 1,014,570.00 180,595.00 811,656.00 144,476.00
3 Pek. Urugan Tanah Kembali DIV.1-1.5.1.24 m3 6.34 45,000.00 - 285,300.00
4 Pek. Pondasi Pasangan Batu Kali 1 : 4 DIV.3-3.1.1.2 m3 14.08 637,240.00 222,375.00 8,972,339.20 3,131,040.00
B PEK. BETON & PIPA
1 Pek. Lantai Beton
a. Pek. Beton K175 DIV.4-4.1.1.4 m3 5.12 1,109,100.00 180,595.00 5,678,592.00 924,646.40
b. Pas. Bekisting DIV.4-4.1.1.15 m2 8.76 69,800.00 77,090.00 611,448.00 675,308.40
c. Pembesian DIV.4-4.1.1.13 kg 455.96 12,495.00 1,445.50 5,697,220.20 659,090.18
2 Pek. Kolom Beton Bertulang K1 20/20
a. Pek. Beton K175 DIV.4-4.1.1.4 m3 0.92 1,109,100.00 180,595.00 1,020,372.00 166,147.40
a. Pas. Bekisting DIV.4-4.1.1.17.a m2 9.18 172,500.00 97,845.00 1,583,550.00 898,217.10
b. Pembesian DIV.4-4.1.1.13 kg 125.65 12,495.00 1,445.50 1,569,996.75 181,627.08
3 Pek. Sloof Beton Bertulang K1 20/25
a. Pek. Beton K175 DIV.4-4.1.1.4 m3 1.05 1,109,100.00 180,595.00 1,164,555.00 189,624.75
b. Pas. Bekisting DIV.4-4.1.1.16 m2 16.02 77,800.00 77,090.00 1,246,356.00 1,234,981.80
a. Pembesian DIV.4-4.1.1.13 kg 93.21 12,495.00 1,445.50 1,164,658.95 134,735.06
4 Pek. Balok Bertulang 20/35
a. Pek. Beton K175 DIV.4-4.1.1.4 m3 1.47 1,109,100.00 180,595.00 1,630,377.00 265,474.65
b. Pas. Bekisting DIV.4-4.1.1.18.a m2 4.18 177,900.00 97,845.00 743,622.00 408,992.10
c. Pembesian DIV.4-4.1.1.13 kg 104.33 12,495.00 1,445.50 1,303,603.35 150,809.01
5 Pek. Plat Tutup Beton Bertulang t= 20 cm
a. Pek. Beton K175 DIV.4-4.1.1.4 m3 3.77 1,109,100.00 180,595.00 4,181,307.00 680,843.15
b. Pas. Bekisting DIV.4-4.1.1.19.a m2 18.72 211,500.00 97,845.00 3,959,280.00 1,831,658.40
c. Pembesian DIV.4-4.1.1.13 kg 499.37 12,495.00 1,445.50 6,239,628.15 721,839.34
6 Pek. Dinding Beton Bertulang t= 20 cm
a. Pek. Beton K175 DIV.4-4.1.1.4 m3 7.54 1,109,100.00 180,595.00 8,362,614.00 1,361,686.30
b. Pas. Bekisting 2 Kali Pakai DIV.4-4.1.1.20.a m2 52.88 184,500.00 97,845.00 9,756,360.00 5,174,043.60
c. Pembesian DIV.4-4.1.1.13 kg 1,332.09 12,495.00 1,445.50 16,644,464.55 1,925,536.10
C PEK. FINISHING
1 Pek. Acian DIV.4-4.4.2.27 m2 98.02 4,810.00 29,650.00 471,476.20 2,906,293.00
2 Pek. Pengecatan Dinding DIV.4-4.7.1.10 m2 53.52 40,690.00 9,139.50 2,177,728.80 489,146.04
D. PERLENGKAPAN RESERVO1R
1 Pipa Inlet

a. Pipa GI 1.5" Harsat Bahan m' 7.00 67,000.00 469,000.00

b. Knee GI 1.5" Harsat Bahan bh 5.00 69,900.00 349,500.00

c. Socket Drat Luar HDPE 1.5" Harsat Bahan bh 1.00 45,000.00 45,000.00
2 Pipa Peluap

a. Pipa GI 2" Harsat Bahan m' 3.00 67,000.00 201,000.00

b. Knee GI 2" Harsat Bahan bh 2.00 69,900.00 139,800.00


3 Pipa Penguras

a. Pipa GI 2" Harsat Bahan m' 1.00 67,000.00 67,000.00

b. Knee GI 2" Harsat Bahan bh 2.00 69,900.00 139,800.00

c. Stopkran Kuningan 2" (KITZ) Harsat Bahan bh 1.00 650,000.00 650,000.00


4 Pipa Outlet

a. Pipa GI 2" Harsat Bahan m' 3.00 67,000.00 201,000.00

b. Knee GI 2" Harsat Bahan bh 2.00 69,900.00 139,800.00

c. Stopkran Kuningan 2" (KITZ) Harsat Bahan bh 1.00 650,000.00 650,000.00

d. Socket Drat Luar HDPE 2" Harsat Bahan bh 1.00 67,000.00 67,000.00
5 Pipa Ventilasi

a. Pipa GI 2" Harsat Bahan m 1.00 67,000.00 67,000.00

b. TEE GI 2" Harsat Bahan bh 1.00 94,000.00 94,000.00

c. Knee GI 2" Harsat Bahan bh 2.00 69,900.00 139,800.00

d. Double Napple GI 2" Harsat Bahan bh 2.00 52,000.00 104,000.00


6 Manhole 80 x 80 cm (Plat Bordes) Harsat Bahan bh 1.00 900,000.00 900,000.00
7 Manhole 138 x 80 cm (Plat Bordes) Harsat Bahan bh 3.00 1,500,000.00 4,500,000.00
8 Tangga Besi 2.5 m Harsat Bahan bh 1.00 1,200,000.00 1,200,000.00
9 Media Filter Ls 1.00 1,000,000.00 1,000,000.00
E. PEK. BAK VALVE 90 X 90 X 90
1 Pas. Dinding Bata Merah 1 : 5 DIV.4-4.4.1.4 m2 3.24 189,456.00 77,300.00 613,837.44 250,452.00
2 Pek. Plesteran 1 : 5 DIV.4-4.4.2.4 m2 4.54 16,435.20 44,475.00 74,615.81 201,916.50
3 Pek. Acian DIV.4-4.4.2.27 m2 4.54 4,810.00 29,650.00 21,837.40 134,611.00
4 Pek. Pengecatan Dinding DIV.4-4.7.1.10 m2 4.54 40,690.00 9,139.50 184,732.60 41,493.33
5 Manhole 80 x 80 cm (Plat Bordes) Harsat Bahan unit 1.00 900,000.00 900,000.00 -
Jumlah 98,167,208.40 26,699,508.68
RINCIAN RENCANA ANGGARAN BIAYA
Pekerjaan : Program Pengelolaan dan Pengembangan Sistem Penyediaan Air Minum
Lokasi : Uprating Instalasi Pengolahan Air (IPA)/Penambahan Sumur Dalam Terlindungi/Broncaptering
Tahun Anggaran : 2023

HARGA SATUAN JUMLAH HARGA SATUAN


No. URAIAN PEKERJAAN KODE ANALIS SAT. VOL Rp. Rp.
MATERIAL UPAH MATERIAL UPAH
B. PENGADAAN PIPA & PEMASANGAN PIPA
I. PIPA HDPE
1 PengadaanPipa HDPE dia.63 mm (2") SDR-17 / PN - 10 Harsat Bahan m' 600.00 44,400.00 26,640,000.00 -
2 PengadaanPipa HDPE dia.50 mm (1,5") SDR-17 / PN - 10 Harsat Bahan m' 1,000.00 27,800.00 27,800,000.00
3 PengadaanPipa HDPE dia.32 mm (1") SDR-17 / PN - 10 Harsat Bahan m' 400.00 11,700.00 4,680,000.00
4 PengadaanPipa HDPE dia.20 mm (0,5") SDR-11 / PN - 16 Harsat Bahan m' 1,000.00 7,500.00 7,500,000.00
II. PIPA GALVANIS -
1 Pipa GI 3" Harsat Bahan btg 4.00 819,000.00 3,276,000.00
2 Pipa GI 2" Harsat Bahan btg 5.00 491,500.00 2,457,500.00
3 Pipa GI 1.5" Harsat Bahan btg 3.00 401,500.00 1,204,500.00
4 Knee 90° GI 1.5" Harsat Bahan btg 4.00 52,000.00 208,000.00
5 Knee 45° GI 1.5" Harsat Bahan btg 4.00 57,000.00 228,000.00

III. ACCESSORIES PIPA


1 Coupler HDPE 2 inch x 2 Inch (HOCO) Harsat Bahan bh 8.00 116,800.00 934,400.00 -
2 Coupler HDPE 1.5 inch x 1.5 Inch (HOCO) Harsat Bahan bh 12.00 70,200.00 842,400.00
3 Coupler HDPE 1 inch x 1 Inch (HOCO) Harsat Bahan bh 4.00 27,300.00 109,200.00
4 Coupler HDPE 0.5 inch x 0.5 Inch (HOCO) Harsat Bahan bh 12.00 12,900.00 154,800.00 -
5 Reducer Coupler HDPE 2 inch x 1.5 Inch (HOCO) Harsat Bahan bh 5.00 84,900.00 424,500.00
6 Reducer Coupler HDPE 2 inch x 1 Inch (HOCO) Harsat Bahan bh 5.00 70,400.00 352,000.00
7 Reducer Coupler HDPE 1.5 inch x 1 Inch (HOCO) Harsat Bahan bh 3.00 45,900.00 137,700.00
8 Reducer Coupler HDPE 1 inch x 0.5 Inch (HOCO) Harsat Bahan bh 5.00 21,500.00 107,500.00 -
9 Tee HDPE 2 inch x 2 Inch x 2 Inch (HOCO) Harsat Bahan bh 1.00 199,000.00 199,000.00
10 Tee HDPE 2 Inch x 2 Inch x 1.5 Inch (HOCO) Harsat Bahan bh 1.00 195,000.00 195,000.00
11 Tee HDPE 2 Inch x 2 inch x 1 Inch (HOCO) Harsat Bahan bh 2.00 149,500.00 299,000.00
12 Tee HDPE 1.5 inch x 1.5 Inch x 1 Inch (HOCO) Harsat Bahan bh 1.00 22,500.00 22,500.00
13 Tee HDPE 1 inch x 1 inch x 1 Inch (HOCO) Harsat Bahan bh 1.00 46,100.00 46,100.00
14 Tee HDPE 0.5 inch x 0.5 Inch (HOCO) Harsat Bahan bh 30.00 22,500.00 675,000.00
15 Elbow 90° HDPE 2 inch (HOCO) Harsat Bahan bh 10.00 122,900.00 1,229,000.00
16 Elbow 90° HDPE 1.5 inch (HOCO) Harsat Bahan bh 8.00 69,900.00 559,200.00
17 Elbow 90° HDPE 1 inch (HOCO) Harsat Bahan bh 9.00 28,900.00 260,100.00
18 Elbow 90° HDPE 0.5 inch (HOCO) Harsat Bahan bh 8.00 13,600.00 108,800.00
19 Dop HDPE 2 inch (HOCO) Harsat Bahan bh 2.00 75,000.00 150,000.00
20 Dop HDPE 1.5 inch (HOCO) Harsat Bahan bh 4.00 37,500.00 150,000.00
21 Dop HDPE 1 inch (HOCO) Harsat Bahan bh 5.00 17,700.00 88,500.00
22 Clamp Saddle 2 Inch x 0.5 Inch (HOCO) Harsat Bahan bh 16.00 32,200.00 515,200.00
23 Clamp Saddle 1.5 Inch x 0.5 Inch (HOCO) Harsat Bahan bh 37.00 32,200.00 1,191,400.00
24 Clamp Saddle 1 Inch x 0.5 Inch (HOCO) Harsat Bahan bh 20.00 22,800.00 456,000.00
25 Clamp Saddle 1.5 Inch x 1 Inch (HOCO) Harsat Bahan bh 3.00 23,700.00 71,100.00
26 Sealtipe Harsat Bahan roll 40.00 6,000.00 240,000.00
27 Socket Drat Luar HDPE 2" (HOCO) Harsat Bahan bh 8.00 67,000.00 536,000.00
28 Socket Drat Luar HDPE 1.5" (HOCO) Harsat Bahan bh 10.00 45,000.00 450,000.00
29 Socket Drat Luar HDPE 1" (HOCO) Harsat Bahan bh 8.00 19,500.00 156,000.00
30 HQ Brass Gate Valve BSPT (HOCO) 2" Harsat Bahan bh 3.00 474,000.00 1,422,000.00
31 HQ Brass Gate Valve BSPT (HOCO) 1.5" Harsat Bahan bh 4.00 300,000.00 1,200,000.00
32 HQ Brass Gate Valve BSPT (HOCO) 1" Harsat Bahan bh 4.00 152,000.00 608,000.00
33 Single Air Valve WP : PN 16 1 Inch (HOCO) Harsat Bahan bh 3.00 407,400.00 1,222,200.00
34 Double Nipple HDPE 1 inch x 1 Inch (HOCO) Harsat Bahan bh 3.00 6,000.00 18,000.00
IV. PEK. BOX VALVE 50 x 50 x 50
1 Pek. Galian Tanah Biasa DIV.1-1.5.1.1 m3 1.75 - 70,375.00 - 123,156.25
2 Pek. Beton K175 DIV.4-4.1.1.4 m3 1.12 1,109,100.00 180,595.00 1,242,192.00 202,266.40
3 Pek. Bekisting 3 kali pakai DIV.4-4.1.1.4 m2 7.47 69,800.00 77,090.00 521,406.00 575,862.30
4 Pek. Pembesian DIV.4-4.1.1.13 kg 74.10 12,495.00 1,445.50 925,879.50 107,111.55
5 Pek. Acian DIV.4-4.4.2.27 m2 11.20 40,690.00 9,139.50 455,728.00 102,362.40
6 Manhole 40 x 40 cm (Plat Bordes) Harsat Bahan unit 14.00 450,000.00 6,300,000.00 -
V. PEMASANGAN PIPA
a. Pipa HDPE 2 inch
1 Galian Tanah DIV.1-1.5.1.1 m3 73.27 70,375.00 - 5,156,376.25
2 Urugan Tanah Kembali DIV.1-1.5.1.24 m3 21.98 45,000.00 - 989,100.00
3 Pemasangan Pipa DIV.10-10.4.1.17 m' 600.00 4,900.00 - 2,940,000.00
4 Perbaikan Rabat Beton 1 : 2 : 3 DIV.4-4.1.1.1 m3 0.36 1,014,570.00 180,595.00 365,245.20 65,014.20
b. Pipa HDPE 1,5 inch
1 Galian Tanah DIV.4-4.1.1.13 kg 116.00 70,375.00 - 8,163,500.00
2 Urugan Tanah Kembali DIV.1-1.5.1.24 m3 34.80 45,000.00 - 1,566,000.00
3 Pemasangan Pipa DIV.10-10.4.1.17.a m' 1,000.00 3,200.00 - 3,200,000.00
4 Perbaikan Rabat Beton 1 : 2 : 3 DIV.4-4.1.1.1 m3 0.29 1,014,570.00 180,595.00 294,225.30 52,372.55
c. Pipa HDPE 1 inch
1 Galian Tanah DIV.1-1.5.1.1 m3 31.72 70,375.00 - 2,232,295.00
2 Urugan Tanah Kembali DIV.1-1.5.1.24 m3 34.80 45,000.00 - 1,566,000.00
3 Pemasangan Pipa DIV.10-10.4.1.17.b m' 400.00 2,400.00 - 960,000.00
4 Perbaikan Rabat Beton 1 : 2 : 3 DIV.4-4.1.1.1 m3 0.13 1,014,570.00 180,595.00 131,894.10 23,477.35
d. Pipa HDPE 0,5 inch
1 Galian Tanah DIV.1-1.5.1.1 m3 78.00 70,375.00 - 5,489,250.00
2 Urugan Tanah Kembali DIV.1-1.5.1.24 m3 23.40 45,000.00 - 1,053,000.00
3 Pemasangan Pipa DIV.10-10.4.1.17.b m' 1,000.00 2,400.00 - 2,400,000.00
4 Perbaikan Rabat Beton 1 : 2 : 3 DIV.4-4.1.1.1 m3 0.23 1,014,570.00 180,595.00 233,351.10 41,536.85

Jumlah 99,594,521.20 37,008,681.10


RINCIAN RENCANA ANGGARAN BIAYA
Pekerjaan : Program Pengelolaan dan Pengembangan Sistem Penyediaan Air Minum
Lokasi : Uprating Instalasi Pengolahan Air (IPA)/Penambahan Sumur Dalam Terlindungi/Broncaptering
Tahun Anggaran : 2023

HARGA SATUAN JUMLAH HARGA SATUAN


No. URAIAN PEKERJAAN KODE ANALIS SAT. VOL Rp. Rp.
MATERIAL UPAH MATERIAL UPAH
C. PIPA SR (Sambungan Rumah) 97 SR

1 Gate Valve 1/2 Inch CAB Harsat Bahan bh 1.00 55,000.00 55,000.00 -
2 Knee GI 1/2 inch Harsat Bahan bh 4.00 15,000.00 60,000.00 -
3 Double Nepple GI 1/2 inch Harsat Bahan bh 2.00 10,000.00 20,000.00 -
4 Water Meter AMNB 1/2 inch Harsat Bahan bh 1.00 100,000.00 100,000.00 -
5 Box Meter Air Harsat Bahan bh 1.00 50,000.00 50,000.00 -
6 Plug Kran 1/2 Inch CAB Harsat Bahan bh 1.00 50,000.00 50,000.00 -
7 Tee GI 1/2 Inch Harsat Bahan bh 1.00 15,000.00 15,000.00 -
8 Dop GI 1/2 Inch Harsat Bahan bh 1.00 9,000.00 9,000.00 -
9 Atap Kran 1/2 Inch Onda Harsat Bahan bh 1.00 43,000.00 43,000.00
10 Sealtipe Harsat Bahan roll 2.00 6,000.00 12,000.00 -
11 Pipa GI 0.5 Inch Medium A 25 cm Harsat Bahan m' 0.75 23,600.00 17,700.00 -
12 Pipa GI 0.5 Inch Medium A 50 cm Harsat Bahan m' 0.50 23,600.00 11,800.00 -
13 Knee Drat Dalam HDPE 1/2 Inch Harsat Bahan bh 1.00 9,500.00 9,500.00 -
14 Pek. Beton Tumbuk 1:3:5 Dudukan Water Meter DIV.4-4.1.1.1 m3 0.02 1,014,570.00 180,595.00 15,218.55 2,708.92
15 Bekisting Lantai 3 kali pakai DIV.4-4.1.1.15 m2 0.16 23,266.67 77,090.00 3,722.67 12,334.40
16 Upah Pemasangan - HOK 1.00 35,000.00 - 35,000.00
Jumlah SR 1 UNIT 471,941.22 50,043.33

Jumlah SR 97 UNIT 45,778,298.02 4,854,202.53


RENCANA KERJA MASYARAKAT
DANA OPERASIONAL

JUMLAH SATUAN
NO URAIAN PEKERJAAN VOL SATUAN HARGA SATUAN
BAHAN
1 2 3 4 5 6
C ADMINISTRASI DAN OPERASIONAL KSM
I. Alat Tulis Kantor (ATK)
1 Kertas A4 5.00 rim 50,000.00 250,000.00
2 Tinta Printer Hitam ( Refill ) 2.00 bh 40,000.00 80,000.00
3 Tinta Printer Warna ( Refill ) 3.00 bh 40,000.00 120,000.00
4 Ballpoint 1.00 dus 15,000.00 15,000.00
5 Kwitansi 1.00 bh 15,000.00 15,000.00
6 Hekter No.10 1.00 bh 10,000.00 10,000.00
7 Paku Hekter No.10 2.00 dus 5,000.00 10,000.00
8 Gunting Besar 1.00 bh 20,000.00 20,000.00
9 Lem Perekat 2.00 bh 10,000.00 20,000.00
10 Map 5.00 bh 2,000.00 10,000.00
11 Punch / Pembolong Kertas 1.00 bh 25,000.00 25,000.00
12 Bindex 5.00 bh 25,000.00 125,000.00

II. Lain-lain
1 Alat Pelindung diri (APD)
- Topi pelindung (Safety Helmet) 8.00 bh 75,000.00 600,000.00
- Sarung tangan (Safety Gloves) 8.00 psg 20,000.00 160,000.00
- Sepatu keselamatan (Safety Shoes) 8.00 psg 85,000.00 680,000.00
- Rompi keselamatan (Safety Vest) 8.00 bh 15,000.00 120,000.00
2 Papan Nama Proyek 1.00 Ls 100,000.00 100,000.00
3 Rambu - Rambu 1.00 Ls 100,000.00 100,000.00
4 Alat Potong Pipa HDPE 20-63mm 2.00 bh 200,000.00 400,000.00
5 Kunci Pipa 2.00 bh 200,000.00 400,000.00
6 Arko 1.00 bh 600,000.00 600,000.00

III. Pembuatan Dokumen


1 Dokumen LPD Tahap 1
- Penjilidan Dokumen 3.00 bh 25,000.00 75,000.00
- Penggandaan Dokumen 3.00 Rangkap 400,000.00 1,200,000.00
2 Dokumen LPD Tahap 2
- Penjilidan Dokumen 3.00 bh 25,000.00 75,000.00
- Penggandaan Dokumen 3.00 Rangkap 400,000.00 1,200,000.00
3 Dokumen LPD Tahap 3
- Penjilidan Dokumen 3.00 bh 25,000.00 75,000.00
- Penggandaan Dokumen 3.00 Rangkap 400,000.00 1,200,000.00
4 Dokumen Pengadaan Barang & Jasa -
- Penjilidan Dokumen 3.00 bh 25,000.00 75,000.00
- Penggandaan Dokumen 3.00 Rangkap 200,000.00 600,000.00
5 Dokumen Laporan Akhir -
- Penjilidan Dokumen 4.00 bh 25,000.00 100,000.00
- Penggandaan Dokumen 3.00 Rangkap 500,000.00 1,500,000.00

IV. Transportasi
1 Transportasi Operasional KSM 23.00 kali 100,000.00
2 Transportasi Material 4.00 kali 50,000.00
2 Rapat Dan Pertemuan
- Snack 51.00 org 15,000.00 765,000.00
- Nasi Box 51.00 org 20,000.00 1,020,000.00

11,745,000.00
Jumlah Bahan dan Upah
Dibulatkan
Terbilang : Dua Belas Juta Lima Ratus Ribu Rupiah
JUMLAH SATUAN
UPAH
7

2,300,000.00
200,000.00

2,500,000.00
14,245,000.00
14,245,000.00
s Ribu Rupiah
RENCANA PENARIKAN DANA (RPD) TAHAP 1

: Dana Alokasi Khusus ( DAK ) Air Minum


: Pengembangan Jaringan Distribusi dan Sambungan Rumah ( SR )
: Desa Selasari Kecamatan Parigi
: 2023
: 135 SR
: KSM Air Minum Desa Selasari

VOLUME HARGA SAT. JUMLAH

No. Uraian Kegiatan VOL. SAT. ANALISA / KOEF KEB.TOTAL Pengajuan


Realisasi Pengajuan
Sampai Dengan (Rp.) (Rp.)
Tahap Lalu Saat Ini
Saat Ini

1 2 3 4 5 6(3*5) 7 8 9 (7+8) 10 11 (8*10)


I PEKERJAAN PERSIAPAN
1 Mobilisasi Material
Upah Angkut Material 40.00 HOK 40.00 25.00 25.00 90,000.00 2,250,000.00
2 Pengujian Laboratorium Air 2.00 Ls 2.00 1.00 1.00 1,600,000.00 1,600,000.00
Subtotal Pekerjaan Persiapan 3,850,000.00
II PEKERJAAN BRONCAPTERING DAN INTAKE

A. PEK. TANAH DAN PONDASI


1 Pek. Galian Tanah Pondasi 5.93 m3 DIV.1-1.5.1.1
2 Pek. Urugan Pasir 0.21 m3 DIV.1-1.5.1.27 - 90,000.00 -
3 Pek. Lantai Kerja 0.21 m3 DIV.4-4.1.1.1 -
4 Pek. Pondasi Pasangan Batu Kali 1 : 4 1.50 m3 DIV.3-3.1.1.2 -
B. PEK. BETON - 250,000.00 -
1 Pek. Lantai Beton Tumbuk - -
a. Pek. Beton K 175 1.05 m3 DIV.4-4.1.1.4 - 90,000 -
b. Pembesian 146.16 kg DIV.4-4.1.1.13 - 105,000 -
2 Pek. Kolom Beton Bertulang K1 20/20 - - -
a. Pek. Beton K175 0.30 m3 DIV.4-4.1.1.4 - - -
a. Pas. Bekisting 3.75 m2 DIV.4-4.1.1.17.a - 200,000 -
b. Pembesian 35.14 kg DIV.4-4.1.1.13 - 1,500 -
3 Pek. Sloof Beton Bertulang K1 20/25 - 277,500 -
a. Pek. Beton K175 0.51 m3 DIV.4-4.1.1.4 - -
b. Pas. Bekisting 4.20 m2 DIV.4-4.1.1.16 - 90,000 -
a. Pembesian 45.55 kg DIV.4-4.1.1.13 - 105,000 -
4 Pek. Balok Bertulang 20/35 - 105,000 -
a. Pek. Beton K175 0.51 m3 DIV.4-4.1.1.4 - - -
b. Pas. Bekisting 9.18 m2 DIV.4-4.1.1.18.a - - -
c. Pembesian 45.55 kg DIV.4-4.1.1.13 - 1,500 -
5 Pek. Plat Tutup Beton Bertulang t= 10 cm - 277,500 -
a. Pek. Beton K175 0.24 m3 DIV.4-4.1.1.4 - - -
b. Pas. Bekisting 1.60 m2 DIV.4-4.1.1.19.a - 90,000 -
c. Pembesian 32.37 kg DIV.4-4.1.1.13 - 105,000 -
6 Pek. Dinding Beton Bertulang t= 20 cm - 105,000 -
a. Pek. Beton K175 1.23 m3 DIV.4-4.1.1.4 - - -
b. Pas. Bekisting 8.37 m2 DIV.4-4.1.1.20.a - - -
c. Pembesian 223.77 kg DIV.4-4.1.1.13 - 1,500 -
C. PEK. FINISHING - - -
1 Pek. Acian 4.84 m2 DIV.4-4.4.2.27 - 105,000 -
D. PERLENGKAPAN BRONCAPTERING - - -
1 Pipa Inlet - - -
a. Pipa GI 2" 8.00 m' Harsat Bahan - - -
b. Knee GI 2" 2.00 bh Harsat Bahan - 1,500 -
2 Pipa Peluap - 277,500 -
a. Pipa GI 2" 2.00 m' Harsat Bahan - 380,000 -
3 Pipa Penguras - - -
a. Pipa GI 2" 2.00 m' Harsat Bahan - 90,000 -
4 Pipa Outlet - 105,000 -
a. Pipa GI 2" 6.00 m' Harsat Bahan - 105,000 -
b. Socket Drat Dalam HDPE 2" 1.00 bh Harsat Bahan - - -
3 Pipa Ventilasi
a. Pipa GI 1" 1.00 m' Harsat Bahan - 1,600,000 -
b. TEE GI 1" 1.00 bh Harsat Bahan - 18,000 -
c. Knee GI 1" 2.00 bh Harsat Bahan - 4,000 -
d. Double Napple GI 1" 1.00 bh Harsat Bahan - 1,800,000 -
4 Manhole 60 x 60 cm (Plat Bordes) 1.00 bh Harsat Bahan - 150,000 -
Subtotal Pekerjaan Broncaptering dan Intake -
III PEKERJAAN RESERVOIR - - -
A. PEK. TANAH DAN PONDASI - 90,000 -
1 Pek. Galian Tanah Pondasi 21.12 m3 DIV.1-1.5.1.1 - 105,000 -
2 Pek. Urugan Pasir 1.60 m3 DIV.1-1.5.1.27 - 105,000 -
3 Pek. Lantai Kerja 0.80 m3 DIV.4-4.1.1.1 - - -
3 Pek. Urugan Tanah Kembali 6.34 m3 DIV.1-1.5.1.24 - - -
4 Pek. Pondasi Pasangan Batu Kali 1 : 4 14.08 m3 DIV.3-3.1.1.2 - 11,400 -
B PEK. BETON & PIPA - 21,000 -
1 Pek. Lantai Beton - - -
a. Pek. Beton K175 5.12 m3 DIV.4-4.1.1.4 - - -
b. Pas. Bekisting 8.76 m2 DIV.4-4.1.1.15
c. Pembesian 455.96 kg DIV.4-4.1.1.13 - 1,500 -
2 Pek. Kolom Beton Bertulang K1 20/20 - 277,500 -
a. Pek. Beton K175 0.92 m3 DIV.4-4.1.1.4 - 380,000 -
a. Pas. Bekisting 9.18 m2 DIV.4-4.1.1.17.a -
b. Pembesian 125.65 kg DIV.4-4.1.1.13 - 90,000 -
3 Pek. Sloof Beton Bertulang K1 20/25 - 105,000 -
a. Pek. Beton K175 1.05 m3 DIV.4-4.1.1.4 - 105,000 -
b. Pas. Bekisting 16.02 m2 DIV.4-4.1.1.16 -
a. Pembesian 93.21 kg DIV.4-4.1.1.13
4 Pek. Balok Bertulang 20/35 1,600,000
a. Pek. Beton K175 1.47 m3 DIV.4-4.1.1.4 18,000
b. Pas. Bekisting 4.18 m2 DIV.4-4.1.1.18.a 4,000
c. Pembesian 104.33 kg DIV.4-4.1.1.13 1,800,000
5 Pek. Plat Tutup Beton Bertulang t= 20 cm 150,000
a. Pek. Beton K175 3.77 m3 DIV.4-4.1.1.4 12,000
b. Pas. Bekisting 18.72 m2 DIV.4-4.1.1.19.a
c. Pembesian 499.37 kg DIV.4-4.1.1.13 90,000
6 Pek. Dinding Beton Bertulang t= 20 cm 105,000
a. Pek. Beton K175 7.54 m3 DIV.4-4.1.1.4 105,000
b. Pas. Bekisting 2 Kali Pakai 52.88 m2 DIV.4-4.1.1.20.a
c. Pembesian 1,332.09 kg DIV.4-4.1.1.13
C PEK. FINISHING 10,924
1 Pek. Acian 98.02 m2 DIV.4-4.4.2.27
2 Pek. Pengecatan Dinding 53.52 m2 DIV.4-4.7.1.10 90,000.00
D. PERLENGKAPAN RESERVO1R 105,000.00
1 Pipa Inlet - - 150,000.00 -
a. Pipa GI 1.5" 7.00 m' Harsat Bahan - - 12,000.00 -
b. Knee GI 1.5" 5.00 bh Harsat Bahan - -
c. Socket Drat Luar HDPE 1.5" 1.00 bh Harsat Bahan - - 90,000.00 -
2 Pipa Peluap - -
a. Pipa GI 2" 3.00 m' Harsat Bahan - -
b. Knee GI 2" 2.00 bh Harsat Bahan - - 11,400.00 -
3 Pipa Penguras - - 105,000.00 -
a. Pipa GI 2" 1.00 m' Harsat Bahan - - 105,000.00 -
b. Knee GI 2" 2.00 bh Harsat Bahan - - -
c. Stopkran Kuningan 2" (KITZ) 1.00 bh Harsat Bahan - - 110,000.00 -
4 Pipa Outlet -
a. Pipa GI 2" 3.00 m' Harsat Bahan
b. Knee GI 2" 2.00 bh Harsat Bahan
c. Stopkran Kuningan 2" (KITZ) 1.00 bh Harsat Bahan
d. Socket Drat Luar HDPE 2" 1.00 bh Harsat Bahan
5 Pipa Ventilasi - - 90,000.00 -
a. Pipa GI 2" 1.00 m Harsat Bahan - - -
b. TEE GI 2" 1.00 bh Harsat Bahan
c. Knee GI 2" 2.00 bh Harsat Bahan - - 250,000.00 -
d. Double Napple GI 2" 2.00 bh Harsat Bahan - -
6 Manhole 80 x 80 cm (Plat Bordes) 1.00 bh Harsat Bahan - - 90,000.00 -
7 Manhole 138 x 80 cm (Plat Bordes) 3.00 bh Harsat Bahan - - 105,000.00 -
8 Tangga Besi 2.5 m 1.00 bh Harsat Bahan - - -
9 Media Filter 1.00 Ls - - -
E. PEK. BAK VALVE 90 X 90 X 90 - - 90,000.00 -
1 Pas. Dinding Bata Merah 1 : 5 3.24 m2 DIV.4-4.4.1.4 - - -
2 Pek. Plesteran 1 : 5 4.54 m2 DIV.4-4.4.2.4 - -
3 Pek. Acian 4.54 m2 DIV.4-4.4.2.27 - - 200,000.00 -
4 Pek. Pengecatan Dinding 4.54 m2 DIV.4-4.7.1.10 - - 1,500.00 -
5 Manhole 80 x 80 cm (Plat Bordes) 1.00 unit Harsat Bahan - - 277,500.00 -
Jumlah - - -
Jumlah 3,850,000.00
Dibulatkan 3,850,000.00
( Seratus Dua Puluh Dua Juta Lima Ratus Empat Puluh Enam Ribu Tujuh Ratus Rupiah)

Mengetahui / Menyetujui : Mengetahui : Diperiksa : Dibuat Oleh :


Kepala Bidang Cipta Karya Pejabat Pelaksana Teknis Kegiatan Tenaga Fasilitator Lapangan Kelompok Swadaya Masyarakat
Selaku Pejabat Pembuat Komitmen ( PPTK ) TFL ( KSM ) Air Minum Desa Selasari
( PPK )
KURNIA HENDRIANA. S.T. BAMBANG ARUMAN, S. S.T. EKA RIYANTO, S.T EDI SUPRIADI
NIP. 19770120 200901 1 008 NIP. 19840211 201503 1 001 Ketua