TAJUK PROJEK
Description of works
Location : ……………………………………………………………………………………………………………………………..
*see note : ……………………………………………………………………………………………………………………………..
: ……………………………………………………………………………………………………………………………..
: ……………………………………………………………………………………………………………………………..
: ……………………………………………………………………………………………………………………………..
: ……………………………………………………………………………………………………………………………..
*note : include details of materials, labour and plant, and number of delivery trucks to be used.
This request was received by : …………………… at …………………… (time) on ………………………. (date)
………………………. (signature)
Inspected by : …………………………..on………………………… at …………………………….
Engineers Comments
1. Delete as inapplicable
a. Inspection passed. The Contractor as allowed to proceed with the works.
b. Remedial works listed below to be completed an re-inspection is required afterward.
c. Remedial works listed below to be completed but no further inspection required.
Name: Name:
Position: Position:
On……………………at………………... On……………………..at…………………