You are on page 1of 1

225 225 225

2R20 2R20 2R20


R10@200c/c R10@200c/c R10@200c/c
400

400

400
2R16 2R16 2R16

2R20 2R20 2R20

SECT. A - A SECT. A - A SECT. A - A

NOTE 1 :
Concrete to frames
700

700

700
4-R2001 + 2R1601 4-R2001 + 2R1601 4-R2001 + 2R1601 2
must be fcu -25N/mm
75

75

75
BRC Mesh A142 BRC Mesh A142 BRC Mesh A142
Reinforcement TO BEAMS
450 150

450 150

450 150
2
600

600

600
Fy - 250N/mm - Mild Steel bars

Cover to reinforcement
Foundations -50mm
10-R1001-200 10-R1001-200 10-R1001-200
950

950

950
Columns -40mm
1500

1500

1500
A A A A A A slab - 25mm
C1 C1a C1a Staircase - 25mm
500

500

500
Beams -25mm
50mm blinding

50mm blinding

50mm blinding

13- R2002-150c/c BB 13- R2002-150c/c BB


1500 1500 1850
Client :
LOIS BOATENG
637.5 225 637.5 637.5 225 637.5 812.5 225 812.5 Project :

4- STOREY RESIDENTIAL FACILITY


Location :
550

550

725
BORTIANOR-ACCRA
10- R1601-150c/c BB 10- R1601-150c/c BB
Description :

R.C FOOTINGS
400

400

400
1500

1500

1850
C1 C1a C1a

10- R1601-150c/c BB 10- R1601-150c/c BB AD-CONSULT


550

550

725

Structural engineer :

FREDERICK OWUSU-ADDO (ING.)

Drawn by :
Sheet No.
Scale :
F1;C1(4no) F1;C1a(1no) F2;C1a (5no) Date :
1:100 3
MARCH, 2023