RAB PEMBUATAN LAPANGAN BASKET

RINCIAN PERHITUNGAN
N0 URAIAN JUMLAH
VOLUME SATUAN HARGA SATUAN
1 Pasir Urug 5 Rit 550,000 2,750,000
2 Pasir Sedang 15 Rit 600,000 9,000,000
3 Batu Split 10 Rit 750,000 7,500,000
4 Semen 175 Zak 85,000 14,875,000
5 Besi wiremesh 6 mm (5x2m) 80 Lembar 450,000 36,000,000
6 Papan Begesting 1 m3 1,800,000 1,800,000
7 Cat Propan 3 Pail 1,250,000 3,750,000
8 Tiang Ring 2 Unit 8,500,000 17,000,000
9 Ring Basket 2 Unit 1,750,000 3,500,000
10 Upah Pekerja 1 Paket 10,000,000 10,000,000
11 Biaya Tak Terduga 1 2,000,000 2,000,000
TOTAL 108,175,000