16A2093-C0008revA Instructions For Drawing Diagrams
16A2093-C0008revA Instructions For Drawing Diagrams
P.O.Box 4 (Jaakonkatu 3)
FI-01621 Vantaa
Finland
Domicile Vantaa, Finland
Technical project instruction Business ID. 1071411-1
Tel. +358 9 894 71
Fax +358 9 878 1818
Contents 1 Introduction
2 Diagram Types
3 Flow Diagrams and PI Diagrams
4 Flow Markings
5 Units
6 Other Markings
7 Title Block
8 Key Plan
9 Distribution Table
10 Revision Table
Distribution MB
JPH/JMR, APA Files
1 INTRODUCTION
The purpose of these instructions is to standardize the appearance of diagrams, their
presentation and specially the markings on them. All suppliers shall comply with these
instructions.
These instructions apply to the process technical diagrams, but shall also be complied
with in preparing HVAC diagrams if applicable.
2 DIAGRAM TYPES
In the project for example the following diagrams are prepared:
− line diagrams
− flow diagrams
− PI diagrams
− route diagrams
− distribution diagrams
−
Line diagrams, if deemed necessary, are preliminary diagrams supporting
procurement and layout design. These diagrams present only the main equipment and
lines.
During flow diagram design only one base diagram of the specific process shall be
prepared. In beginning the diagram just presents the process connections (preliminary
flow diagram), but as engineering progresses it develops into a dimensioned flow
diagram and later on into a PI diagram.
All received information shall immediately be inserted in the diagrams. The diagrams
can, however, be plotted in simplified versions as required in each case.
3.1 General
The flow diagrams shall be created with AutoCAD (to be compatible with AutoCAD
2000) complying with instruction S37 used by the client.
The purpose is that also suppliers, if they prepare final diagrams, shall comply with
the client’s standard.
16A2093-C0008
For distribution purposes the diagrams are plotted in A4 height and for revisions in A2
height.
The sheets of long diagrams (extended A0) shall be generated as individual drawings.
The lines presenting process or process control shall, however, continue at the same
elevation when moving from one sheet to another on the diagram. The connecting
points of standard-length A0 parts shall be marked with short vertical lines at the top
and bottom of the diagram to indicate the point in which the diagram parts can be
separated if required for filing or copying purposes or for other reasons. On the
connecting border of the diagram parts, a margin of 2 to 3 cm shall be left on both
sides on which no equipment shall be drawn and no process markings inserted. These
margins shall be reserved for allocating the address data of process flows and control
lines (Appendix III).
The equipment and tank frames shall be drawn with black lines, but the same colour
as used for describing a flow substance can be used as filler colour for tanks.
Right before the box a mark can be added indicating where the flow/control goes or
from where the flow/control comes. Also possible equipment position number can be
inserted.
16A2093-C0008
4 FLOW MARKINGS
Balances shall be calculated to the design production of the department under normal
operating conditions. The flows shall be marked on diagrams without units but with
max flow within parenthesis.
For example
consistency %
If the units of a flow substance deviate from generally used units, they shall be written
next to this flow.
Flow data markings shall be inserted in several locations above the process flow or on
the reference line, and always together with incoming or outgoing process lines on
diagram ends. Incoming and outgoing process flows to/from diagrams shall be written
also in clear text indicating the flow substances and, if possible, also where diagram
sheets overlap.
5 UNITS
Units to be used are presented in project instruction 16A2093-L00013.
6 OTHER MARKINGS
For example
7 TITLE BLOCK
Title block as presented in Appendix I/1 shall be inserted on diagrams. On diagrams
consisting of several sheets the title block shall be inserted on every sheet.
Also each diagram sheet shall have its own client drawing number in addition to the
supplier number.
The client drawing number is used in the diagram, also in part diagrams.
The checking and approval markings in the last part diagram apply to the entire diagram.
When in correspondence reference is made to a diagram, only the number of the last part
diagram shall be given as reference number.
During the engineering phase revisions shall be marked only on the last part at the client
drawing number.
8 KEY PLAN
The client drawing number, not the sheet number of each part, shall be inserted in the
key plan. Appendix III.
16A2093-C0008
9 DISTRIBUTION TABLE
Appendix II.
10 REVISION TABLE
Appendix II.
JAAKKO PÖYRY OY
P.O.Box 4 (Jaakonkatu 3)
FI-01621 Vantaa
Finland
Domicile Vantaa, Finland
Appendix I Business ID. 1071411-1
Tel. +358 9 894 71
Fax +358 9 878 1818
TITLE BLOCK
JAAKKO PÖYRY OY
P.O.Box 4 (Jaakonkatu 3)
FI-01621 Vantaa
Finland
Domicile Vantaa, Finland
Appendix II Business ID. 1071411-1
Tel. +358 9 894 71
Fax +358 9 878 1818
Ref. No 16A2093-C0008
Page 1 (1)
Contact Jyrki Rautkorpi
Botnia S.A. Pulp Technology Division
Direct dial +358 9 8947 2769
Project Uruguay Direct fax +358 9 878 2384
E-mail jyrki.rautkorpi@poyry.fi
Delivery limits for Supplier Core, Open Book and Balance of the Plant items shall be
marked to the PI diagrams as follows:
Marking: