CONSTRUCTION OPERATIONAL HSE FILE DOC NR CR 00-0

INDEX
CONSTRUCTION MANAGEMENT Pro X Projects (PTY) LTD

This document needs to be compiled for every Project, in order to determine that the necessary operational
actions and documentation was done on Site

CONSTRUCTION SITE:

ACTIONS REQUIRED REQUIREMENTS COMPLIANCE


YES NO
Job Requirement Pro X Projects/ Principal Contractor to define
Scope of Work for project
Notification of Construction work Principal Contractor to ensure notice + proof of
to Dept of Labour fax on file available. Forward document to Pro X
projects

Permit to Work To be completed by Permit Requester/Issuer.


Discussed with Employees.
Forward Permit to work document to Pro X
Projects

Toolbox Talk Document to indicate all Safety Issues to be


discussed daily (Attendance Register Signed
daily) Forward Toolbox talk document to Pro X
Projects
Emergency Preparation Emergency Nr’s displayed on Site daily

Emergency Layout document completed and


discussed with Team during a Toolbox Talk for
the project (Attendance Register signed)
Forward Emergency Layout document to Pro X
Projects
NB Training on Emergency Layout to be
discussed on Toolbox Talk

Task Risk Assessment + Method Task Risk Assessment / Method Statement


Statement completed and discussed with Team during
Toolbox Talk daily (Attendance Register daily)
Forward TRA / Method Statement + Attendance
Register document to Pro X Projects

Site Specific HSE Plan Discussed with Team for the project (Attendance
Register) Forward Attendance Register to Pro X
projects
Fall Protection Plan Discussed with Team for the project (Attendance
Register) Forward Attendance Register toPro X
Projects
Notes : Registers: Ensure Applicable Registers are up to date: PPE
Issued, Firs Aid Box, Fire Extinguisher
Daily Crane Inspection / Lifting Equipment
Inspection as per frequencies required
Notes : Legal Appointments & All appointments and Medicals are done for
Medical Certificates employees on site per project

 Project SHE Files to be scanned onto a CD and forwarded to Pro X Projects once
project is done
Pro X Projects (Pty) Ltd REV/DATE
REVIEW NR
09.04.2015
00

CONSTRUCTION OPERATIONAL HSE FILE DOC NR CR 00-0

INDEX
CONSTRUCTION MANAGEMENT Pro X Projects (PTY) LTD

 Maintenance SHE File – Only hand in daily documentation until further notice