Professional Documents
Culture Documents
300m 300m
B METALLIC SPACERS METALLIC SPACERS B
A
A
MHH-2 MHH-2 MHH-2 MHH-2 MHH-2 MHH-2 1.5m MHH-2 MHH-2 MHH-2 MHH-2
1.5m
A
A
Electronic drawings once printed, are uncontrolled and may become out-dated. Refer to Aconex for current revision.
C C
D 200 200 D
100
100
100
100
CONCRETE BACKFILL
CONCRETE BACKFILL
170
650
650
(FOR CUSTOMER)
320
METALLIC SPACER
METALLIC SPACER 1.5m DISTANCE
1.5m DISTANCE
F F
250
(FOR CUSTOMER)
100
PE 100, PN 16 30 PE 100, PN 16
30
WELDED WELDED
G G
SECTION A-A SECTION A-A
mbarakat
300m 300m
Jun 11, 2014 - 1:24am
A
A
OD, PE 100, PN 16
PE 100, PN 16
H H
TIMESTAMP
WT WT WT WT
MHH-2 MHH-2 MHH-2 MHH-2 MHH-2
WT WT
MHH-2 MHH-2 MHH-2
A
A
1 15x50mm TRENCH AND DUCT INSTALLATION DETAIL 2 6x50mm TRENCH AND DUCT INSTALLATION DETAIL
- NTS - NTS
K K
DOCUMENT REVIEW STATUS REVISIONS PROJECT BACS CONSORTIUM DATE SCALE DRAWING TITLE
No Date Description Drawn Checked Approved
A REVIEWED 00A 11-06-14 90% DRAFT FINAL DESIGN MB KA AA 11 JUNE 2014 AS SHOWN ITC 15x50mm AND 6x50mm TRENCH
Work may proceed
L L
AND DUCT INSTALLATION
M-BD3-1F8000-CUTL-EDR-000304.dwg
DRAWING STATUS
REVIEWED WITH COMMENTS
B Revise and re-submit. Work may proceed subject to STANDARD DETAILS
incorporation of comments 90% DRAFT FINAL DESIGN
OBJECTION
C Revise and re-submit. Work may not proceed CONSULTANT / SUB-CONTRACTOR
D REJECTED www.bacsrmp.com
LEAD DESIGN ENTITY (LDE) APPROVED BY LDE DRAWN BY CHECKED BY APPROVED BY DRAWING NUMBER
REVIEW NOT REQUIRED
E Work may proceed NAME A.HAGH NAME M.B.KADAR NAME K.AWUMAH NAME A.ABDULRAHEM
FILENAME
M M-BD3-1F8000-CUTL-EDR-000304 00A M
DATE 11-06-2014 DATE 10-06-2014 DATE 10-06-2014 DATE 11-06-2014
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 V001