You are on page 1of 22

PT.

PRISMA KUSUMA JAYA


PROJECT PIPE LINE REHABILITATION MP53

SUMMARY WELDING INSPECTION REPORT


Project Title : FREEPORT PROJECT PAPUA Date
Job No : PIPE LINE REHABILITATION MP 53 DWG. No.
Owner : PT.FREEPORT INDONESIA Discipline
Main Contractor : PT.PRISMA KUSUMA JAYA Material Type
NO SHEET NO REV LINE MATERIAL
COMPONENT SPECIFICATION HEAT NUMBER PROCESS
FROM-TO SCH
1 1 of 9 0 #3 MP53 40 SMAW

2 1 of 9 0 #3 MP53 40 SMAW

3 1 of 9 0 #3 MP53 40 SMAW

4 1 of 9 0 #3 MP53 40 SMAW

5 1 of 9 0 #3 MP53 40 SMAW

6 1 of 9 0 #3 MP53 40 SMAW

7 1 of 9 0 #3 MP53 40 SMAW

8 1 of 9 0 #3 MP53 40 SMAW

9 1 of 9 0 #3 MP53 40 SMAW

10 1 of 10 0 #3 MP53 40 SMAW

11 1 of 10 0 #3 MP53 40 SMAW

12 1 of 10 0 #3 MP53 40 SMAW

13 1 of 10 0 #3 MP53 40 SMAW

14 1 of 10 0 #3 MP53 40 SMAW

15 1 of 10 0 #3 MP53 40 SMAW

16 1 of 10 0 #3 MP53 40 SMAW

17 1 of 10 0 #3 MP53 40 SMAW

18 1 of 10 0 #3 MP53 40 SMAW

19 1 of 10 0 #3 MP53 40 SMAW
LEGEND : TOT
WPS :
NPS :
SCH :

Prepared By, Witnessed / Reviewed By,

ARIF SUBAHTIAR
: 24-Feb-23
:
: PIPING
: CS
WELDER NAMEDATE VISUAL JUDGEMENT NDT TEST RESULT REMAKS
ELECTRODE (AWS CLASS) FIT-UP WELDING
Root & Hot PasFiller & Capping
6010 G 8010 G ANAS PHILIP 24-Feb-23 2-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 24-Feb-23 2-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 24-Feb-23 3-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 24-Feb-23 3-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 24-Feb-23 3-Mar-23 ACCEPTED
PHILIP ADE P
6010 G 8010 G ADE P PHILIP 24-Feb-23 3-Mar-23 ACCEPTED
PHILIP PHILIP
6010 G 8010 G PHILIP ADE P 24-Feb-23 3-Mar-23 ACCEPTED
ADE P ANAS
6010 G 8010 G ANAS ADE P 24-Feb-23 3-Mar-23 ACCEPTED VISUAL
ADE P ANAS
6010 G 8010 G ANAS PHILIP 24-Feb-23 3-Mar-23 ACCEPTED
PHILIP DENI
6010 G 8010 G DENI SOPIAN 25-Feb-23 3-Mar-23 ACCEPTED
SOPIAN DENI
6010 G 8010 G DENI SOPIAN 25-Feb-23 3-Mar-23 ACCEPTED
SOPIAN DENI
6010 G 8010 G DENI ROBANI 25-Feb-23 3-Mar-23 ACCEPTED
ROBANI DENI
6010 G 8010 G DENI ROBANI 25-Feb-23 3-Mar-23 ACCEPTED
ROBANI SOPIAN
6010 G 8010 G SOPIAN ROBANI 25-Feb-23 3-Mar-23 ACCEPTED
ROBANI SOPIAN
6010 G 8010 G SOPIAN ROBANI 25-Feb-23 3-Mar-23 ACCEPTED
ROBANI SOPIAN
6010 G 8010 G SOPIAN DENI 25-Feb-23 3-Mar-23 ACCEPTED
DENI SOPIAN
6010 G 8010 G SOPIAN DENI 25-Feb-23 3-Mar-23 ACCEPTED
DENI ROBANI
6010 G 8010 G ROBANI DENI 25-Feb-23 3-Mar-23 ACCEPTED
DENI ROBANI
6010 G 8010 G ROBANI DENI 25-Feb-23 3-Mar-23 ACCEPTED
DENI 0
0
0
TOTAL JOINT MINNGU II = 19 JOINT
BW : Butt Weld

Reviewed By,

Date
PT. PRISMA KUSUMA JAYA
PROJECT PIPE LINE REHABILITATION MP53

SUMMARY WELDING INSPECTION REPORT


Project Title : FREEPORT PROJECT PAPUA Date
Job No : PIPE LINE REHABILITATION MP 53 DWG. No.
Owner : PT.FREEPORT INDONESIA Discipline
Main Contractor : PT.PRISMA KUSUMA JAYA Material Type
NO SHEET NO REV LINE MATERIAL
COMPONENT SPECIFICATION HEAT NUMBER PROCESS
FROM-TO SCH
1 1 of 13 0 #3 MP53 40 SMAW

2 1 of 13 0 #3 MP53 40 SMAW

3 1 of 13 0 #3 MP53 40 SMAW

4 1 of 13 0 #3 MP53 40 SMAW

5 1 of 13 0 #3 MP53 40 SMAW

6 1 of 13 0 #3 MP53 40 SMAW

7 1 of 13 0 #3 MP53 40 SMAW

8 1 of 13 0 #3 MP53 40 SMAW

9 1 of 13 0 #3 MP53 40 SMAW

10 1 of 13 0 #3 MP53 40 SMAW

11 1 of 13 0 #3 MP53 40 SMAW

12 1 of 13 0 #3 MP53 40 SMAW

13 1 of 13 0 #3 MP53 40 SMAW

14 1 of 20 0 #3 MP53 40 SMAW

15 1 of 20 0 #3 MP53 40 SMAW

16 1 of 20 0 #3 MP53 40 SMAW

17 1 of 20 0 #3 MP53 40 SMAW

18 1 of 20 0 #3 MP53 40 SMAW

19 1 of 20 0 #3 MP53 40 SMAW
20 1 of 20 0 #3 MP53 40 SMAW

21 1 of 20 0 #3 MP53 40 SMAW

22 1 of 20 0 #3 MP53 40 SMAW

23 1 of 20 0 #3 MP53 40 SMAW

24 1 of 20 0 #3 MP53 40 SMAW

25 1 of 20 0 #3 MP53 40 SMAW

26 1 of 20 0 #3 MP53 40 SMAW

27 1 of 20 0 #3 MP53 40 SMAW

28 1 of 20 0 #3 MP53 40 SMAW

29 1 of 20 0 #3 MP53 40 SMAW

30 1 of 20 0 #3 MP53 40 SMAW

31 1 of 20 0 #3 MP53 40 SMAW

32 1 of 20 0 #3 MP53 40 SMAW

33 1 of 20 0 #3 MP53 40 SMAW

34 1 of 11 #3 MP53 40 SMAW

35 1 of 11 #3 MP53 40 SMAW

36 1 of 11 #3 MP53 40 SMAW

37 1 of 11 #3 MP53 40 SMAW

38 1 of 11 #3 MP53 40 SMAW

39 1 of 11 #3 MP53 40 SMAW

40 1 of 11 #3 MP53 40 SMAW

41 1 of 11 #3 MP53 40 SMAW

42 1 of 11 #3 MP53 40 SMAW

43 1 of 11 #3 MP53 40 SMAW

44 1 of 11 #3 MP53 40 SMAW
45 1 of 12 #3 MP53 40 SMAW

46 1 of 12 #6 MP53 40 SMAW

47 1 of 12 #6 MP53 40 SMAW

48 1 of 12 #6 MP53 40 SMAW

49 1 of 12 #6 MP53 40 SMAW

50 1 of 12 #6 MP53 40 SMAW

51 1 of 12 #6 MP53 40 SMAW

52 1 of 12 #6 MP53 40 SMAW

53 1 of 12 #6 MP53 40 SMAW

54 1 of 12 #6 MP53 40 SMAW

55 1 of 12 #6 MP53 40 SMAW

56 1 of 12 #6 MP53 40 SMAW

57 1 of 16 #6 MP53 40 SMAW

58 1 of 16 #6 MP53 40 SMAW

59 1 of 16 #6 MP53 40 SMAW

60 1 of 16 #6 MP53 40 SMAW

61 1 of 16 #6 MP53 40 SMAW

62 1 of 16 #6 MP53 40 SMAW

63 1 of 16 #6 MP53 40 SMAW

64 1 of 16 #6 MP53 40 SMAW

65 1 of 16 #6 MP53 40 SMAW

66 1 of 16 #6 MP53 40 SMAW

67 1 of 16 #6 MP53 40 SMAW

68 1 of 16 #6 MP53 40 SMAW
69 1 of 16 #6 MP53 40 SMAW

70 1 of 16 #6 MP53 40 SMAW

71 1 of 16 #6 MP53 40 SMAW

72 1 of 16 #6 MP53 40 SMAW

LEGEND : TOT
WPS :
NPS :
SCH :

Prepared By, Witnessed / Reviewed By,

ARIF SUBAHTIAR
: 27-Feb-23
:
: PIPING
: CS
WELDER NAME DATE VISUAL JUDGEMENT NDT TEST RESULT
ELECTRODE (AWS CLASS) FIT-UP WELDING
Root & Hot Pass Filler & Capping
6010 G 8010 G ANAS PHILIP 27-Feb-23 3-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 27-Feb-23 3-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 27-Feb-23 3-Mar-23 ACCEPTED
PHILIP ADE P
6010 G 8010 G ADE P PHILIP 27-Feb-23 3-Mar-23 ACCEPTED
PHILIP ADE P
6010 G 8010 G ADE P ANAS 27-Feb-23 3-Mar-23 ACCEPTED
ANAS ADE P
6010 G 8010 G ADE P ANAS 27-Feb-23 3-Mar-23 ACCEPTED
ANAS DENI
6010 G 8010 G DENI ROBANI 27-Feb-23 3-Mar-23 ACCEPTED
ROBANI DENI
6010 G 8010 G DENI ROBANI 27-Feb-23 3-Mar-23 ACCEPTED
ROBANI SOPIAN
6010 G 8010 G SOPIAN ROBANI 27-Feb-23 3-Mar-23 ACCEPTED
ROBANI SOPIAN
6010 G 8010 G SOPIAN ROBANI 27-Feb-23 2-Mar-23 ACCEPTED
ROBANI SOPIAN
6010 G 8010 G SOPIAN DENI 27-Feb-23 2-Mar-23 ACCEPTED
DENI SOPIAN
6010 G 8010 G SOPIAN DENI 27-Feb-23 2-Mar-23 ACCEPTED
DENI ROBANI
6010 G 8010 G ROBANI DENI 27-Feb-23 2-Mar-23 ACCEPTED
DENI DENI
6010 G 8010 G DENI SOPIAN 28-Feb-23 2-Mar-23 ACCEPTED
SOPIAN DENI
6010 G 8010 G DENI SOPIAN 28-Feb-23 2-Mar-23 ACCEPTED
SOPIAN DENI
6010 G 8010 G DENI ROBANI 28-Feb-23 2-Mar-23 ACCEPTED
ROBANI DENI
6010 G 8010 G DENI ROBANI 28-Feb-23 2-Mar-23 ACCEPTED
ROBANI SOPIAN
6010 G 8010 G SOPIAN ROBANI 28-Feb-23 2-Mar-23 ACCEPTED
ROBANI SOPIAN
6010 G 8010 G SOPIAN ROBANI 28-Feb-23 2-Mar-23 ACCEPTED
ROBANI SOPIAN
6010 G 8010 G SOPIAN DENI 28-Feb-23 2-Mar-23 ACCEPTED
DENI SOPIAN
6010 G 8010 G SOPIAN DENI 28-Feb-23 2-Mar-23 ACCEPTED
DENI ROBANI
6010 G 8010 G ROBANI DENI 28-Feb-23 2-Mar-23 ACCEPTED
DENI ROBANI
6010 G 8010 G ROBANI DENI 28-Feb-23 2-Mar-23 ACCEPTED
DENI ROBANI
6010 G 8010 G ROBANI SOPIAN 28-Feb-23 2-Mar-23 ACCEPTED
SOPIAN ANAS
6010 G 8010 G ANAS ADE P 28-Feb-23 2-Mar-23 ACCEPTED
ADE P ANAS
6010 G 8010 G ANAS ADE P 28-Feb-23 2-Mar-23 ACCEPTED
ADE P ANAS
6010 G 8010 G ANAS ADE P 28-Feb-23 2-Mar-23 ACCEPTED
ADE P PHILIP
6010 G 8010 G PHILIP ADE P 28-Feb-23 2-Mar-23 ACCEPTED
ADE P PHILIP
6010 G 8010 G PHILIP ADE P 28-Feb-23 2-Mar-23 ACCEPTED
ADE P ANAS
6010 G 8010 G ANAS PHILIP 28-Feb-23 2-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 28-Feb-23 2-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 28-Feb-23 2-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 28-Feb-23 2-Mar-23 ACCEPTED
PHILIP ROBANI
6010 G 8010 G ROBANI SOPIAN 1-Mar-23 2-Mar-23 ACCEPTED
SOPIAN ROBANI
6010 G 8010 G ROBANI SOPIAN 1-Mar-23 2-Mar-23 ACCEPTED
SOPIAN ROBANI
6010 G 8010 G ROBANI DENI 1-Mar-23 2-Mar-23 ACCEPTED
DENI ADE P
6010 G 8010 G ADE P DENI 1-Mar-23 7-Mar-23 ACCEPTED
DENI ADE P
6010 G 8010 G ADE P DENI 1-Mar-23 7-Mar-23 ACCEPTED
DENI ADE P
6010 G 8010 G ADE P SOPIAN 1-Mar-23 7-Mar-23 ACCEPTED
SOPIAN ADE P
6010 G 8010 G ADE P PHILIP 1-Mar-23 7-Mar-23 ACCEPTED
PHILIP ROBANI
6010 G 8010 G ROBANI SOPIAN 1-Mar-23 7-Mar-23 ACCEPTED
SOPIAN ROBANI
6010 G 8010 G ROBANI DENI 1-Mar-23 7-Mar-23 ACCEPTED
DENI ROBANI
6010 G 8010 G ROBANI DENI 1-Mar-23 3-Mar-23 ACCEPTED
DENI ROBANI
6010 G 8010 G ROBANI DENI 1-Mar-23 3-Mar-23 ACCEPTED
DENI ROBANI
6010 G 8010 G ROBANI SOPIAN 2-Mar-23 3-Mar-23 ACCEPTED
SOPIAN ROBANI
6010 G 8010 G ROBANI SOPIAN 2-Mar-23 6-Mar-23 ACCEPTED
SOPIAN ROBANI
6010 G 8010 G ROBANI ADE P 2-Mar-23 6-Mar-23 ACCEPTED
ADE P ROBANI
6010 G 8010 G ROBANI ADE P 2-Mar-23 6-Mar-23 ACCEPTED
ADE P ROBANI
6010 G 8010 G ROBANI ADE P 2-Mar-23 6-Mar-23 ACCEPTED
ADE P ROBANI
6010 G 8010 G ROBANI ADE P 2-Mar-23 6-Mar-23 ACCEPTED
ADE P PHILIP
6010 G 8010 G PHILIP DENI 2-Mar-23 6-Mar-23 ACCEPTED
DENI PHILIP
6010 G 8010 G PHILIP DENI 2-Mar-23 6-Mar-23 ACCEPTED
DENI PHILIP
6010 G 8010 G PHILIP DENI 2-Mar-23 6-Mar-23 ACCEPTED
DENI PHILIP
6010 G 8010 G PHILIP SOPIAN 2-Mar-23 6-Mar-23 ACCEPTED
SOPIAN ADE P
6010 G 8010 G ADE P SOPIAN 2-Mar-23 6-Mar-23 ACCEPTED
SOPIAN DENI
6010 G 8010 G DENI SOPIAN 2-Mar-23 6-Mar-23 ACCEPTED
SOPIAN ANAS
6010 G 8010 G ANAS PHILIP 3-Mar-23 6-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 3-Mar-23 6-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 3-Mar-23 6-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 3-Mar-23 6-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 3-Mar-23 6-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 3-Mar-23 6-Mar-23 ACCEPTED
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 3-Mar-23 6-Mar-23 ACCEPTED
PHILIP ADE P
6010 G 8010 G ADE P DENI 3-Mar-23 6-Mar-23 ACCEPTED
DENI ADE P
6010 G 8010 G ADE P DENI 3-Mar-23 6-Mar-23 ACCEPTED
DENI ADE P
6010 G 8010 G ADE P SOPIAN 3-Mar-23 6-Mar-23 ACCEPTED
SOPIAN ADE P
6010 G 8010 G ADE P SOPIAN 3-Mar-23 7-Mar-23 ACCEPTED
SOPIAN DENI
6010 G 8010 G DENI SOPIAN 3-Mar-23 7-Mar-23 ACCEPTED
SOPIAN DENI
6010 G 8010 G DENI SOPIAN 3-Mar-23 7-Mar-23 ACCEPTED
SOPIAN DENI
6010 G 8010 G DENI ADE P 3-Mar-23 7-Mar-23 ACCEPTED
ADE P DENI
6010 G 8010 G DENI ADE P 3-Mar-23 7-Mar-23 ACCEPTED
ADE P SOPIAN
6010 G 8010 G SOPIAN ADE P 3-Mar-23 7-Mar-23 ACCEPTED
ADE P 0
0
0
0
TOTAL JOINT MINNGU III = 63 JOINT
BW : Butt Weld

Reviewed By,

Date
REMAKS
PT. PRISMA KUSUMA JAYA
PROJECT PIPE LINE REHABILITATION MP53

SUMMARY WELDING INSPECTION REPORT


Project Title : FREEPORT PROJECT PAPUA Date
Job No : PIPE LINE REHABILITATION MP 53 DWG. No.
Owner : PT.FREEPORT INDONESIA Discipline
Main Contractor : PT.PRISMA KUSUMA JAYA Material Type
NO SHEET NO REV LINE MATERIAL
COMPONENT SPECIFICATION HEAT NUMBER PROCESS
FROM-TO SCH
1 1 of 19 0 #4 MP53 40 SMAW

2 1 of 19 0 #4 MP53 40 SMAW

3 1 of 19 0 #4 MP53 40 SMAW

4 1 of 19 0 #4 MP53 40 SMAW

5 1 of 19 0 #4 MP53 40 SMAW

6 1 of 19 0 #4 MP53 40 SMAW

7 1 of 19 0 #4 MP53 40 SMAW

8 1 of 19 0 #4 MP53 40 SMAW

9 1 of 19 0 #4 MP53 40 SMAW

10 1 of 19 0 #6 MP53 40 SMAW

11 1 of 19 0 #6 MP53 40 SMAW

12 1 of 19 0 #6 MP53 40 SMAW

13 1 of 19 #4 MP53 40 SMAW

14 1 of 19 #4 MP53 40 SMAW

15 1 of 19 #4 MP53 40 SMAW

16 1 of 19 #4 MP53 40 SMAW

17 1 of 19 #4 MP53 40 SMAW

18 1 of 19 #4 MP53 40 SMAW

19 1 of 19 #4 MP53 40 SMAW

20 1 of 15 #4 MP53 40 SMAW

21 1 of 15 #4 MP53 40 SMAW

22 1 of 15 #4 MP53 40 SMAW
23 1 of 15 #4 MP53 40 SMAW

24 1 of 15 #4 MP53 40 SMAW

25 1 of 15 #4 MP53 40 SMAW

26 1 of 15 #4 MP53 40 SMAW

27 1 of 15 #4 MP53 40 SMAW

28 1 of 15 #4 MP53 40 SMAW

29 1 of 15 #4 MP53 40 SMAW

30 1 of 15 #4 MP53 40 SMAW

31 1 of 15 #4 MP53 40 SMAW

32 1 of 15 #4 MP53 40 SMAW

33 1 of 15 #4 MP53 40 SMAW

34 1 of 15 #4 MP53 40 SMAW

LEGEND : TOT
WPS :
NPS :
SCH :

Prepared By, Witnessed / Reviewed By,

ARIF SUBAHTIAR
: 6-Mar-23
:
: PIPING
: CS
WELDER NAME DATE VISUAL JUDGEMENT NDT TEST RESULT
ELECTRODE (AWS CLASS) FIT-UP WELDING
Root & Hot Pass Filler & Capping
6010 G 8010 G PHILIP ANAS 6-Feb-23 7-Mar-23
ANAS PHILIP
6010 G 8010 G PHILIP ANAS 6-Mar-23 7-Mar-23
ANAS PHILIP
6010 G 8010 G PHILIP ANAS 6-Mar-23 7-Mar-23
ANAS ADE P
6010 G 8010 G ADE P ANAS 6-Mar-23 7-Mar-23
ANAS ADE P
6010 G 8010 G ADE P PHILIP 6-Mar-23 7-Mar-23
PHILIP ADE P
6010 G 8010 G ADE P PHILIP 6-Mar-23 7-Mar-23
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 6-Mar-23 7-Mar-23
PHILIP ANAS
6010 G 8010 G ANAS ADE P 6-Mar-23 7-Mar-23
ADE P ANAS
6010 G 8010 G ANAS ADE P 6-Mar-23 7-Mar-23
ADE P SOPIAN
6010 G 8010 G SOPIAN ROBANI 6-Mar-23 6-Mar-23
ROBANI SOPIAN
6010 G 8010 G SOPIAN ROBANI 6-Mar-23 6-Mar-23
ROBANI SOPIAN
6010 G 8010 G SOPIAN ROBANI 6-Mar-23 6-Mar-23
ROBANI DENI
6010 G 8010 G DENI ROBANI 6-Mar-23 7-Mar-23
ROBANI DENI
6010 G 8010 G DENI ROBANI 6-Mar-23 7-Mar-23
ROBANI DENI
6010 G 8010 G DENI ROBANI 6-Mar-23 7-Mar-23
ROBANI SOPIAN
6010 G 8010 G SOPIAN ROBANI 6-Mar-23 8-Mar-23
ROBANI SOPIAN
6010 G 8010 G SOPIAN DENI 6-Mar-23 8-Mar-23
DENI SOPIAN
6010 G 8010 G SOPIAN DENI 6-Mar-23 8-Mar-23
DENI SOPIAN
6010 G 8010 G SOPIAN DENI 6-Mar-23 8-Mar-23
DENI ANAS
6010 G 8010 G ANAS PHILIP 7-Mar-23 8-Mar-23
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 7-Mar-23 8-Mar-23
PHILIP ADE P
6010 G 8010 G ADE P PHILIP 7-Mar-23 8-Mar-23
PHILIP ADE P
6010 G 8010 G ADE P PHILIP 7-Mar-23 8-Mar-23
PHILIP ANAS
6010 G 8010 G ANAS PHILIP 7-Mar-23 8-Mar-23
PHILIP SOPIAN
6010 G 8010 G SOPIAN ROBANI 7-Mar-23 8-Mar-23
ROBANI SOPIAN
6010 G 8010 G SOPIAN ROBANI 7-Mar-23 8-Mar-23
ROBANI SOPIAN
6010 G 8010 G SOPIAN DENI 7-Mar-23 8-Mar-23
DENI SOPIAN
6010 G 8010 G SOPIAN DENI 7-Mar-23 8-Mar-23
DENI ROBANI
6010 G 8010 G ROBANI DENI 7-Mar-23 8-Mar-23
DENI ROBANI
6010 G 8010 G ROBANI DENI 7-Mar-23 8-Mar-23
DENI ROBANI
6010 G 8010 G ROBANI SOPIAN 7-Mar-23 8-Mar-23
SOPIAN ROBANI
6010 G 8010 G ROBANI SOPIAN 7-Mar-23 8-Mar-23
SOPIAN SOPIAN
6010 G 8010 G SOPIAN DENI 7-Mar-23 8-Mar-23
DENI SOPIAN
6010 G 8010 G SOPIAN DENI 7-Mar-23 8-Mar-23
DENI 0
0
0

TOTAL JOINT MINNGU 3 = 34 Joint


BW : Butt Weld

Reviewed By,

Date
REMAKS