Inspection and Test Plan (structure)

Plant NA MOC# NA-2022-162


Title:- CCR-1 Emergency stair case
Date 4/6/2022 Rev.# 0

RT UT DPT MT DFT Pneumatic Test Holyday Eddy current Pre.Heat PWHT


Sr.# Item Material Joint type WPS# Remarks
% % % % µm Test Pressure Yes/No Yes/No (°C min) Yes/No

1 Stair case CS NA - - 10% - - - - - - - Gen-WPS-333 Clod work only

2
Prepared By:- Reviewd By:- Approved By:-
Project Engineer Sr.Project Engineer Sr.Inspection Engineer
Inspection and Test Plan (Equipment)
Plant Ammonia MOC# P&HS-2020-69
Title:- NP reclaimer Boom Extension
Date 11/15/2021 Rev.# 0
Eddy
RT UT DPT MT DFT HT current Pre Heat. PWHT
Sr.# Tag# Description Joint Type Material WPS# Remarks
% % % % µm kg/cm2 Yes/No (°C min) Yes/ No

1 NP reclaimer Boom Extension Fielt CS WPS-Gen-333

Prepared By:- Reviewed By:- Approved By:-


Project Engineer Sr.Eng Projects Sr. Eng Inspection