Reading daily

Done
Slab Level Total BBM Completed Balance Total Plaster Completed
0.00 Mtr 134.08 Cu Mtr 113.96 Cu Mtr 20.04 Cu Mtr 1943.00 Sq Mtr 1358.00 Sq Mtr
4.95 Mtr 79.45 Cu Mtr 72.18 Cu Mtr 7.27 Cu Mtr 1151.43 Sq Mtr 213.19 Sq Mtr
8.75 Mtr 50.17 Cu Mtr 15.15 Cu Mtr 35.05 Cu Mtr 731.50 Sq Mtr 0.00 Sq Mtr
11.75 Mtr 111.04 Cu Mtr 0.00 Cu Mtr 111.04 Cu Mtr 1609.30 Sq Mtr 0.00 Sq Mtr

terrace Plaster time


Slab Level Date Wall Date
0.00 Mtr 18-10-2023 North wall 10-11-2023
4.95 Mtr 21-10-2023 East wall 14-11-2023
8.75 Mtr 24-10-2023 South wall 18-11-2023
11.75 Mtr 28-10-2023 West wall 22-11-2023
Balance
585.00 Sq Mtr
938.24 Sq Mtr
731.50 Sq Mtr
1609.30 Sq Mtr