Individual Presentation
1. Standard Cosntructions
10. Documentation
11. References
2
c/c 300
Standard Constructions
20
c/c 300
85
2 2
20
4
55
3 1
220
85
2 2
1
5
5 240 5
220
1. 1. YTONGBoard
Gypsum Blocks 240x500x800mm
12mm
2. 2. Render
Steel with 24x24x3000mm
Profile paint finish on both sides
3. Steel Angle Fitting
4. Hollow Core Slab
5. Rail system 38x24mm
6. Cross-lock Connector
13 32 24
284
PROJECT PROJECT No. TITLE PROJECT STATUS DRAWING No. SCALE (@ A1) Valby Maskinfabrik
DRAWN BY DATE I6_A6_K01_H4_EX_N01
1 2 3 4 5 6 7 8 9 10 11 12 12. Wiring
Client SFB Code Project Number
10
5 240 5
3 4 5 2
500
9
1. Partition Wall
21
21
- YTONG Blocks 240x500x800mm
55
55
- Render with paint finish
on both sides
85
125
2. Floor Construction
- Hollow Core Slab with
render and paint
- Thermal Concrete
220
- Screed with underfloor
180
heating
- Oak floor panels glue down
to the screed
5
5
8 6 7
3. Soundproof membrane
4. Wooden Baseboard
5. Air Gap for wood expansion
250
7. Concrete Fill
8. Plastic Cap to prevent
concrete from going into
hollowcore
c/c 300
Function: Added for insulating properites for heating pipes and
to have equal floor levels around the bulding.
4
Execution: Spread all over the hollowcore slabs with the level
55
3 of 80-120mm depending
1 on the hollowcore depth. Rein-
forced.
85
2 2
References (manufacturers, BR15): Cemex
1
Execution: Spread evenly on the thermal concrete. Left to cure
for 7-10 days.
5
5 240 5
4 Material Name: Oak floor panels 1. Hollow Core Slab with render and paint
2. Thermal Concrete
Finish of the floor system. Aesthetics.
(45) Suspended Ceiling Function:
3. Screed with underfloor heating
4. Oak floor panels glue down to the screed
Responsible Trade: Carpenter
Execution: Applied to a screeded(22)
subfloor with embedded heat-
Partition Wall
ing pipes. Before commencing the installation of the
flooring, the temperature and humidity of the building should cor-
1. YTONG
respond to the expected future Blocks
climatic 240x500x800mm
conditions of the building
2. Render with paint
when in use, e.g. 35-65% relative humidity, approx.finish on both sides
20°C,
References (manufacturers, BR15): Junckers
284
15 16 17 18
15 16 17 18
1. Floor Construction
- Hollow Core Slab with render and
paint
- Thermal Concrete
1. Floor Construction
- Screed with underfloor heating
- Hollow
- Oak Core
floor Slab glue
panels with down
renderto and
the
paint
screed
2 - Wall
2. Thermal Concrete
Construction
- YTONG Blocks underfloor
- Screed with heating
240x800x500mm
284
- Hollow
6. Render Core
with Slab
pain on both sides
3. Rail
7. Gypsum Board38x24mm
system 12mm
4. Cross-lock
8. Steel Profile 24x24x3000mm
Connector
5. Adjustable
Steel AngleStraps
Fitting
32 24
9. min.100mm
6. Hollow
10. Core Slab
Steel Rail
7. Rail
11. system
Gypsum 38x24mm
Board, 12mm
8. Cross-lock
Insulation Connector
32 2413
12. Insulation
15. 12mm Rebar around Ventilation
2317 1 Duct
1200 16. Underfloor Heating pipes, c/c
13. Ventilation DUct 125mm
300mm
3 4 5 6 7 8 9 10 11 12 13 14 14. Soundproof
17. Wiring membrane
15. 12mmbetween
18. Gap Rebar wooden floor and
1200 16. Underfloor
wall Heating
for the wood pipes,9mm
expansion, c/c
300mm
17. Soundproof membrane
18. Gap between wooden floor and
wall for the wood expansion, 9mm
Project Name Drawing Number
VALBY MASKIN FABRIK F18_3 SUSPENDED CEILING KJ MAIN PROJECT I6_A6_K01_H4_EX_N03 1 : 5 WF 12/16/18
De Forenede Ejendomsselskaber (22);(33);(45) F18_003
PROJECT PROJECT No. TITLE PROJECT STATUS DRAWING No. SCALE (@ A1) DRAWN BY DATE
Author Sheet Size Date Scale Stage
specification
7
Bathroom Pod and Floor Key Junction
D
9 10 11 12
6110 6110
20
2
55
118
3
1. Floor Construction
- Hollow Core Slab with render
97
4 and paint
54
5 - Thermal Concrete
- Screed with underfloor heating
6 - Oak floor panels glue down to
the screed
2. Bathroom Tiles (BadElement)
3. Concrete (BadElement)
220
4. Steel Plates
5. Small pipe from the bathroom
sink with a slope of 5%
6. Main pipe system (Shower,
Toilet, Washing Machine, Dryer)
7. Metal construction for a part
7 metal stud wall covering the space
between bathroom pod and
structural floor
8. Insulation between metal studs
9. Concrete fill between
hollowcore slabs
8 10. Rebar 12mm
1 11. Gap between oak floor and wall
(expansion for wood)
12. Wooden Baseboard
Apartment D
9
Layout Plan for Hollowcore Slabs
EX1 EX1
Opening
EX1.1 EX1.1
Cast-in concrete
Stirrups in joints
EX4.1
EX1.1
EX1
EX2
EX4.2 EX5.2
EX2
C
EX5.1 EX5.1
EX3 DN
EX3.1
EX5.1 EX5.1
EX4.1
EX3.1
EX5.1 EX5.1
EX4.2 EX3.1
EX5.1 EX5.1
EX5.1 EX3.1
EX5.1 EX5.1
EX5.2 EX3.1
EX5.1 EX5.1
B
Project Name Drawing Number
2 3 4 5 6
Valby Maskinfabrik I6_A6_K01_H4_EX_N04
Client SFB Code Project Number
10
EAST NORTH Shop-floor Drawing of Hollowcore Slabs
EAST NORTH
EX1 7700
147 42 21 21 45 45
80
80
80
EX1
220
220
7700
12
147 42 21 21 45 45
1197
80
80
80
220
220
7400
12
EX2 45 45
1197
80
80
80
220
220
7400
EX2
1197 45 45
80
80
80
8740
220
220
EX3 45 45
1197
80
80
80
220
220
8740
EX3
1197
45 45
80
80
80
220
220
5600
a1 a2 a3
100 42 EX4.1 45 45
190
124
1197
104
70
70
70
180
180
190
124
104
a1 Rebar ⌀12mm connecting hollow cores
70
70
70
180
180
70
70
180
180
70
70
4450
180
180
TOLERANCES
EX5.1 45 45
Length <7.2m +12mm
848
70
70
70
180
Thickness +8mm
4450 Width +5mm
TOLERANCES
EX5.1
1197 45 45
Length <7.2m +12mm
70
70
70
180
70
70
180
180
70
70
EX4.1 180 1200 5600 12
180
180
11
TOP
Shop-floor Drawing of Hollowcore Slabs
BOTTOM
TOP
BOTTOM
7700
7700
31
31 EX1 EX1
1197 1197
EX1 EX1
31
31
7400
7400
31
31
1197 1197
EX2 EX2
EX2 EX2
30
30
8740
8740
31
31
1197 1197
EX3 EX3
EX3 EX3
31
5600
31
31
5600
31
1197 1197
EX4.1 EX4.1
EX4.1 EX4.1
31
5600
31
5600
EX4.2 EX4.2
848
EX4.2 EX4.2
848
31
31
4450
4450
31
31
1197 1197
EX5.2 EX5.2
848
31
31
e e c gate keeper
e e e e e e r t n e e e
Open deposit
Open deposit (Jointing materials,
(Sandwich Panels) Crane from Manitowoc;
Stabilizing system)
Model: MDT218A
Isolator valve
Steel yard Timber Yard Sedimentation tank
Temporary sewer line
Existing public sewer line
Lamp/lamp post
1 EX1 2 EX1
6
CODE DEPTH WIDTH LENGTH QUANTITY 5
(level)
EX1 220 1200 7700 60
EX2 220 1200 7400 6 EX1 EX1
EX3 220 1200 8740 30
EX4.1 180 1200 5600 12
EX4.2 180 848 5600 6
EX5.1 180 1200 4450 72
EX5.2 180 848 4450 6
EX1 EX1
Opening
EX1 EX1
Cast-in concrete
Stirrups in joints
D
Hollow Core Span
EX4.1 EX1 On-site erecetion Plan
EX4.1
1. Start with the Hollow core slabs from the left upper corner of the house (2E grid)
EX1
EX1
2. Go down putting in the Hollow Core on the HIBE Sandwich Panels and YTONG Load-bearing Walls
3. The next is the middle Hollow Core Slab EX2
4. Hollow Core Slabs in the apartment C/D
3 EX2
EX2
EX4.2 EX5.2
5. The last is the apartment A/F from grid E to B
C 6. Fill in the cast in-situ concrete
EX5.1 EX5.1
4 7.Repeat the procedure for all 6 of the blocks starting with corners (E6, E10, E14, E18, E22)
EX3 DN
EX3
EX5.1 EX5.1
EX4.1
EX3
EX5.1 EX5.1
EX4.2 EX3
EX5.1 EX5.1
EX5.1 EX3
EX5.1 EX5.1
EX5.2 EX3
EX5.1 EX5.1
2 3 4 5 6
7 8 9 10 11
E
1 2 5 6
C
3
DN
4
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
De Forenede Ejendomsselskaber
As (23) F18_003
MAIN PROJECT Author Sheet SizeDate Scale Stage
VALBY MASKIN FABRIK F18_3 ON-SITE ERECTION HCS I6_A6_K09_H1_E1_N02 indicated WF 12/16/18
PROJECT PROJECT No. TITLE PROJECT STATUS DRAWING No. SCALE (@ A1) DRAWN BY DATE
Opening
Cast-in concrete
Stirrups in joints
5
Hollow Core Span
D
2
1 EX6 4 EX1.1
EX7 EX5.1
EX7 EX5.1
2 3 4 5 6
5 6 7 8 9 10
D 2 4
1
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
TIME ESTIMATION:
16
Documentation
Contract for sales of goods CONTROL SCHEME FROM WORK SPECIFICATION 1.1 PREFABRICATED CONCRETE ELEMENTS
DANISH CONSTRUCTION ASSOCIATION (23) Prefabricated Hollowcore Slabs
Hollow core slabs
Subcontract agreement number F18_3_28
Subcontract agreement number F18_3_23
1. Parties
Company name: NRE Denmark A/S Company name: Badelement A/S 1. Parties
Street: Trelleborggade 3 Street: Levysgade 14, st.
Turn-key contractor: Supplier:
Postal code and city: 2150 Nordhavn Postal code and city: DK-8700 Horsens
Company name: NRE Denmark A/S Company name: Consolis Spaencom
Company registration number: +4587124950 Company registration number: +4531752469
Street: Finsensvej 3 Street: Akacievej 1
(referred to as “turn-key contractor”) (referred to as “subcontractor”)
Postal code and city: DK-7430 Ikast Postal code and city: DK-2640
Hereby agree that the subcontractor will carry out the work described below, assuming
Hedehusene
the responsibility for managing, distributing and planning the work for itself and
its employees and for determining the number of employees and their qualifications so Company registration no: 30488512 Company registration no: 26271010
that the subcontract can be carried out at the agreed time, price and quality level.
3. Connection to the utilities Use: Building element- structural floor system; load-bearing
4. Control schemes, hand-over of the pods Legal: CE certificate
2.a. Geographical location of construction site https://spaencom.dk/UserFiles/file/teknik/Certificering/EC_1073_CPD_BO56_01.pdf
17
References
HOLLOWCORE SLABS
1. Consolis Spaencom drawings:
- INT_1008_2
- EXT_1008_1
- D2.236
- D2.240
- D2.241
- D2.245
2. http://www.treanor-pujol.co.uk/product-range/hollowcore/technical-information
FLOOR SYSTEM
1. https://www.junckers.com/en/wood-flooring/plank-hardwood-flooring/oak/mc-82/c-78/p-133
3.https://www.junckers.com/en/wood-flooring/plank-hardwood-flooring/oak-plank-natural-pearl/mc-82/c-78/p-156
3. Junckers technical sheets:
- C1.2
- C2.0
- E4.1
- E4.2
- E4.3
- E5.1
- B5.0
4. https://www.cemex.co.uk/insularis-thermal-insulating-concrete.aspx
SUSPENDED CEILING
1. https://www.gyproc.dk/sites/gypsum.nordic.master/files/gyproc-site/BrochurerDK/GyptoneDK/Montering_KantD2_DK_OKT2016.
pdf
2. Gyptone technical sheets:
- HB9-3.4
- HB9-3.5
- HB9-5.7
3. https://www.gyproc.dk/dokumentation/projektering/projektering-lofter
INTERNAL WALLS
1. YTONG technical sheets:
- 23_20_030
- 23_20_031
- 23_20_050
- 22_10_010
- 22_10_020
- 22_10_050
- 22_10_060
- 23_10_070
- BIPS_240_Ytong_Plader
BATHROOM PODS
1. Badelement technical drawings
Thank you
19