...---.------=C~h~ec~k_s--::--'.

-:----t------R_e_s_u_lt_s_____-+--~
A~cc~e~p=t=a~nc=e:..:
C~rl~te=r~la:____j
~ I - - - ~essure switch Setting 400 245(40kA) 145 (40kA) 66/145
5 In Kg/cm2
Pressure as per Temp. The reading below at 20 Degree C.
1 Rate d
2 LoW gas Presure Alarm ON 6.5 6.5 6.5 5.5
Low gas Presure Alarm Reset 7.0 7.0 7.0 6.0
LOW gas Lock out ON 6.0 6.0 6.0 5.0
4
Low gas Lock out Reset 6.5 6.5 6.5 5.5
5

Electrical Operation Test A B C As Per Schematic Diagram


6
1 Local Remote operation

2
Pole descripiency Check'

3 Anti Pumping Check

4 3 -PH push button trip


5 Manual !riping Optional

6 Electrical Lockout

7 Spring Charging time In Seconds


a Manual Spring Charging

Electrical Operation test.. Continue A Phase B Phase C Phase

8 Coil resistance As per approved drawing

a) Trip Coil I and II

220V
110V
b) Closing Coil
220 V
110V

9 Timing Test (milli seconds) 400 245(40kA) 145 (40kA) 66/145

i) Close ...... .... .. ...


<100 <130 <130 <130
ii) Open

Trip-1 <25 <30 <30 <30


····• ··········
Trip II
...... ..... ... .
10 Contact Resistance Test <150 <60 <60 <60
( Ref point 16) ...............
Heaters should be in working
11 Healthiness of Heaters in
Housing & MB. Condition.
····· ·· ···· ····
12 Setting of Thermostat Set between 30 - 35 Degree C.
7 ··· ···· ·"· ··· •
Insulation Resistance With 2.5/5KV Megger
A Breaker Open
.
. . . . .. . . . . . . . .
Between Bottom to Earth > 1500 Mega Ohms
·· ··· ····"'' ' ' ······ ·"· ''''''
Between Top to Bottom > 1500 Mega Ohms
... ... .., .. .... ···· ··· ······ ·"
B Breaker Close

- Between Top to Earth


...... .. .......
> 1500 Mega Ohms

73
Sr No Checks Results Acceptance Criteria ---

-
8 No Leakage At site
Gas Leakage test

Check the straightness of They should fall in one line.


9
Support Column. (Skew issue)
There should be No Gap Between Structure &
10 Grouting of Structures foundation.

Fittment of Water Seepage 0 Ring o Rings to be fitted & Anabond to be applied


11 & Application of Anabond between between Pole Unit & Mechanism housing.
Pole Unit & Housing.

12 Tightness of Nut Between Pole Unit Check tightness


& Housing Joint

Removal of Silica Gel satchels Remove all Silica Gel Bags before
13 from Mechanism Housing & Base commissioning.
Frame

Tightness of All Mechanism


14 Hardwares before Pre- Check tightness
commissioning checks.

Gas Pipe Joints with O Ring & Gas Check Site Joints & 0 Rings for any damages
15 & fix with 3 Bond Greace
sealant

Application of Jointal Z on Terminal Terminal pads to be cleaned & tightened with


16 Pad Joints after thorough cleaning application of Jointal z Greace.
of terminals

Contact Wipe & Stroke Contact wipe & Stroke to be checked with
17 Measurement with Slow Closing Slow Close Operation.
Jack

Tightness of All Mechanism


18 Hardwares after Pre- Check tightness
commissioning checks.
Proper closure of front and Rear Effective latching and Check tightness of the
19 door locks
doors
No water see page from pole -Mechanism joint
20 Water Spray test and from the doors.

Remark : The SF6 Gas Circuit Breaker bearing Sr. No......... ... .. ...... is Cleared for Charging. NO

The SF6 gas Circuit Breaker bearing Sr. No. . . . . . . . . . . . . . . . .. is NOT cleared for Charging on account of following issues :

Customer's Representative CGL Representative

Name- Name-

Signature Signature

Contact No-

CAUTION- Once the Above Pre-commissioning activities are accomplished, Ensure the following :
1) Switch ON the Heaters Supply.
2) Proper latching of the Front & Rear door locks to ensure No water Seepage
3) Cleanliness of the Interior of the Housings.

Product development is a continuous process, consequently the data Indicated Is subject to change without any notice
The features mentions may not be part of standard product.

74
Switchgear Poem Our Major Customers :
There occurs a fault International Customers :
Then the current should halt ENDESA - Spain; ENEL, TERNA - Italy; KEPCO _ Korea ·
Otherwise the fault current will increase TNB • Malaysia; TPC • Taiwan; CEB • Sri Lanka; NPPMB, CPPMB:
& the service continuity decrease SPPMB, HCMCPC, PCl, PC2, PC3, PTC4 - Vietnam; PGCB, RES,
DESA, BPDB • Bangladesh; NPC Transco - Philippines; TXU,
but the relay acts quick
ERGON, AGL, POWERCOR, ETSA, TRANSGRID, INTEGRAL,
& the CIRCUIT BREAKER trips ENERGEX • Australia; ZESA · Zimbabwe; NEPA - Nigeria; PEDEEE,
The faulty part is disconnected PEEGT • Syria; KWPA, HREC, KHREC • Iran; EPE - Argentina;
& the power system is protected PT PLN • Indonesia; PEA, EGAT · Thailand; ESKOM, SPOORNET.
Thanks you Mr. SWITCHGEAR South Africa; VRA, ECG • Ghana; KPLC • Kenya; AMPLA, COELCE,
Because of you there is little fear !! ELECNOR, COPEL, ELETROSUL, RGE - Brazil; EDELNOR,
ELECTROSUR - Peru; Chilectra, EMEL, EFE - Chile; EDENOR,
EDESUR, SECHEEP, EPE, TRANSBA - Argentina
SIEMENS • Germany, Thailand, Indonesia, Bangladesh, Turkey, India.
AREVA · Indonesia, Singapore, Australia.
ABB - Norway, Turkey.
HYOSUNG;LG; HYUNDAI HEAVYIND;HYUNDAIENGG;
HYUNDAI CONST - Korea.
TRAFO - Brazil
CONCO · South Africa

Domestic Customers:
POWERGRID, NTPC, NHPC, REL
Indian RAILWAYS, DMRC,
TNEB,APTRANSCO,APGENCO, KPTC~KSEB
WBSETCL, DVC, JSEB, ASEB, CESC. OPTCL.
GETCO, GSECL, MSETCL, MPPGCL, MPPTCL, CSEB,
RRVPNL, UPPCL, PSEB, HVPNL, DTL, UPPTCL, UPCL.
J&K GPDD.
All Major EPC Contractors like L&T, EMCO, SIEMENS, ABB,
AREVA, IRCON, JSL etc. All Industrial Customers.

Note: The features menuoned


nd
Con&equentty the data 1 : ~ : s: ard Jl:'"oducl Product development Is a continuous process.
ange Without prior notice.
'?~\~;~·:•·, t

~J,i:1~ :.c_ ~·.


>:/I1i"~·~(

For any dariflcations/feedback regarding installation Md


maintenance of GCB, kindly revert back to us.
For Services
Sachin Thavare
Email: sachln.thavare@cgglobal.com
Tel. : 91-253-2301494/95/96
For Services
Bipin Deo
Email: bipln.deo@cgglobal.com
Tel. : 91-253-2301482

Crompton Greaves Limited


SWHchgear Division : Power Systems
A-3 MIDC, Ambad, Nashik 422 010, Maharashtra, India
Tel : +91 253 238 2271
Fax : +91 253 238 1247

0 E-mail: swgr.contact@cgglobal.com
URL : www.cgglobal.com
Regd. Office : 6th Floor, CG House,
Smart solutions. AVANT HA Dr. Annie Besant Road, Worti, Mumbai- 400 030, India.
Strong relatlonships . GROUP COMPANY

CodeNo. : 120-SfM-328 (R2)


0.II.Ublec(bohaf'I08

You might also like