CGL SF6 Breaker Manual Part-4
CGL SF6 Breaker Manual Part-4
-:----t------R_e_s_u_lt_s_____-+--~
A~cc~e~p=t=a~nc=e:..:
C~rl~te=r~la:____j
~ I - - - ~essure switch Setting 400 245(40kA) 145 (40kA) 66/145
5 In Kg/cm2
Pressure as per Temp. The reading below at 20 Degree C.
1 Rate d
2 LoW gas Presure Alarm ON 6.5 6.5 6.5 5.5
Low gas Presure Alarm Reset 7.0 7.0 7.0 6.0
LOW gas Lock out ON 6.0 6.0 6.0 5.0
4
Low gas Lock out Reset 6.5 6.5 6.5 5.5
5
2
Pole descripiency Check'
6 Electrical Lockout
220V
110V
b) Closing Coil
220 V
110V
73
Sr No Checks Results Acceptance Criteria ---
-
8 No Leakage At site
Gas Leakage test
Removal of Silica Gel satchels Remove all Silica Gel Bags before
13 from Mechanism Housing & Base commissioning.
Frame
Gas Pipe Joints with O Ring & Gas Check Site Joints & 0 Rings for any damages
15 & fix with 3 Bond Greace
sealant
Contact Wipe & Stroke Contact wipe & Stroke to be checked with
17 Measurement with Slow Closing Slow Close Operation.
Jack
Remark : The SF6 Gas Circuit Breaker bearing Sr. No......... ... .. ...... is Cleared for Charging. NO
The SF6 gas Circuit Breaker bearing Sr. No. . . . . . . . . . . . . . . . .. is NOT cleared for Charging on account of following issues :
Name- Name-
Signature Signature
Contact No-
CAUTION- Once the Above Pre-commissioning activities are accomplished, Ensure the following :
1) Switch ON the Heaters Supply.
2) Proper latching of the Front & Rear door locks to ensure No water Seepage
3) Cleanliness of the Interior of the Housings.
Product development is a continuous process, consequently the data Indicated Is subject to change without any notice
The features mentions may not be part of standard product.
74
Switchgear Poem Our Major Customers :
There occurs a fault International Customers :
Then the current should halt ENDESA - Spain; ENEL, TERNA - Italy; KEPCO _ Korea ·
Otherwise the fault current will increase TNB • Malaysia; TPC • Taiwan; CEB • Sri Lanka; NPPMB, CPPMB:
& the service continuity decrease SPPMB, HCMCPC, PCl, PC2, PC3, PTC4 - Vietnam; PGCB, RES,
DESA, BPDB • Bangladesh; NPC Transco - Philippines; TXU,
but the relay acts quick
ERGON, AGL, POWERCOR, ETSA, TRANSGRID, INTEGRAL,
& the CIRCUIT BREAKER trips ENERGEX • Australia; ZESA · Zimbabwe; NEPA - Nigeria; PEDEEE,
The faulty part is disconnected PEEGT • Syria; KWPA, HREC, KHREC • Iran; EPE - Argentina;
& the power system is protected PT PLN • Indonesia; PEA, EGAT · Thailand; ESKOM, SPOORNET.
Thanks you Mr. SWITCHGEAR South Africa; VRA, ECG • Ghana; KPLC • Kenya; AMPLA, COELCE,
Because of you there is little fear !! ELECNOR, COPEL, ELETROSUL, RGE - Brazil; EDELNOR,
ELECTROSUR - Peru; Chilectra, EMEL, EFE - Chile; EDENOR,
EDESUR, SECHEEP, EPE, TRANSBA - Argentina
SIEMENS • Germany, Thailand, Indonesia, Bangladesh, Turkey, India.
AREVA · Indonesia, Singapore, Australia.
ABB - Norway, Turkey.
HYOSUNG;LG; HYUNDAI HEAVYIND;HYUNDAIENGG;
HYUNDAI CONST - Korea.
TRAFO - Brazil
CONCO · South Africa
Domestic Customers:
POWERGRID, NTPC, NHPC, REL
Indian RAILWAYS, DMRC,
TNEB,APTRANSCO,APGENCO, KPTC~KSEB
WBSETCL, DVC, JSEB, ASEB, CESC. OPTCL.
GETCO, GSECL, MSETCL, MPPGCL, MPPTCL, CSEB,
RRVPNL, UPPCL, PSEB, HVPNL, DTL, UPPTCL, UPCL.
J&K GPDD.
All Major EPC Contractors like L&T, EMCO, SIEMENS, ABB,
AREVA, IRCON, JSL etc. All Industrial Customers.
0 E-mail: swgr.contact@cgglobal.com
URL : www.cgglobal.com
Regd. Office : 6th Floor, CG House,
Smart solutions. AVANT HA Dr. Annie Besant Road, Worti, Mumbai- 400 030, India.
Strong relatlonships . GROUP COMPANY