SECTION 9

Check out/ Test & Acceptance Certificates

Specific Display
Responsible
Item No: Document Description Instructions and Yes /
Person
requirements No
1 External Buildings
2 Internal Buildings
3 Structural Steel and Grating SS
4 Sheeting
5 Structural Foundations
6 Instruments System Acceptance
7 Mechanical Acceptance Revamp Pumps
8 Mechanical Acceptance Tanks
9 Mechanical Acceptance Blowers/ Fans
10 Mechanical Acceptance Winding Plant
11 Mechanical Acceptance Electric Motor Drives
12 Mechanical Acceptance Filters
13 Mechanical Acceptance Vessel/Drum/Towers
14 Wiring & Electrical Installations in Building

15 Chain Drive Alignment


16 Cold Commissioning Check List & Punch List
17 Commissioning Attachment 1/ Appendix B
18 Concrete Placing &Placement Record
19 Works Completion Acceptance Certificate
20 Contractor Test Request
Control Loops Hydraulic Cylinders PID Loop Check
21 List
22 Conveyor Belt Splice Inspection

23 Conveyor No Load Running


SECTION 9

24 Conveyor Pre Commissioning Test Report


25 Pneumatic System Mechanical Pre-Commissioning
26 Electric Hoist
27 Electrical Test Report Protection & Instruments
28 Electrical Test Report Crane
29 Electrical Test Report DC Machine
30 Electrical Test Report Earthling System
31 Electrical Test Report High Voltage Cable
32 Electrical Test Report Lighting Installation
33 Electrical Test Report Power Transformer
34 Electrical Test Report Screen
35 Electrical Test Report Slip Ring Motor
36 Electrical Test Report Switchgear
37 Electrical Test Report Insulating Oil
38 Electrical Test Report MV Motors
39 Electrical Test Report Squirrel Cage Motor
40 Electrical Test Report Vibratory Feeder
41 Fluid Coupling Alignment & Pre-Commissioning
42 Hydraulic System No Load Running Test Report
43 Hydraulic System Pre-Commissioning Inspection
44 Instrumentation Field Installation Check List
45 Mechanical Coupling Alignment Report
Mechanical Equipment no Load Running Test
46 Report
47 Mechanical Pre-Commissioning Test Report
48 Permission to Grout Equipment
49 Piping, In-Plant Above Ground
50 Piping, In-Plant Underground
51 Pressure Test of Piping Test Report
52 Primary Feeder No Load Running
53 Test Certificate Instrument Lines Leak Test
SECTION 9

V-Belt Drive Alignment & pre-Commissioning Test


54 Report
55 Vibrating Screen no Load Running Test Report
56 High Strength Bolting Tightness
57 Hot Commissioning Check List & Punch List
Installation / Pre-Commission Check List & Punch
58 List