CONSTRUCTION REGULATIONS
Item
Docum
ent
Descrip Specific Instructions &
tion Requirement Display Y/N Responsible
1 Definitions
Persons involved in
2 Scope of application Construction Work Any Person
Notification of Construction Request to do Construction
3 Work Work SA
Compliance with the
4 Client Conditions of Act Client
Principal Documented Health & Safety
5 Contractor/Contractor Plan SA
Supervision of Construction
6 Work Construction Supervisor SA
7 Risk Assessment Competent Person SA
8 Fall Protection Plan SA
9 Structures Design SA
10 Formwork & Support Work Erection of Formwork SA
Supervision of Competent
11 Excavation Work Person SA
12 Demolition Work Control Sa
13 Tunnelling Regulations SA
14 Scaffolding Safety Act SA
15 Suspended Platforms Certificate of Design SA
16 Boatswain's Chair Daily Inspection GF
17 Material Hoists Inspection and Maintenance GF
18 Batch Plants Electrical SA
19 Explosive Power Tools Protection SA
20 Cranes Operating Procedures SA
21 Construction Vehicles & Plant Maintenance Procedures SA
22 Elect.& Mach. Installations Engineering Regulations SA
Temporary Storage Flam,
23 Liquids Paint Store SA
24 Water Environments Drowning SA