JSA Install Spring - Talang
JSA Install Spring - Talang
□ Fracture (broken bone) mechanical factor job characteristic factors personal protective equipment General and hot works excavation work
Investigation of underground facilities (PIC must
□ Puncture (injury by a sharp object) □ Risk of stenosis (bends, pinches) □ noise, vibration □ Safety glasses □ protector face □ Install drain and OWS body covers around the area □ be present during back fill)
□ bruises □ Hazardous surfaces (cuts, scratches) □ Ultrasound, infrasound □ earmuffs □ seatbelt □ Mark a Blind Location in Drawing or list □ Control access to the workplace
□ truncated □ Fall, fly, collapse, overturn danger □ low or high pressure □ Warning Tape □ Air line masks □ Attach a hazard label to the blind installation location □ Prevention of soil collapse at the excavation site
□ Poisoning, suffocation □ Collision risk □ Choking hazard, lack of oxygen □ dust mask □ gas mask □ Removal of flammable materials within 11 meters of the surrounding area working at height and scaffolding
□ Blisters □ Waterfall (slipped, tripped, tripped) □ hard work □ portable ventilators □ Insulation protective □ Open ventilation and drain valve equipment □ Scaffolding installation standards, material
equipment suitability (certified product)
□ Burnt □ Risk of falling parts (opens, etc.) □ operational tools (manipulation) □ Electrical, chemical, and fire protective gloves/clothing □ Maintain the availability of water around the work area □ Feasibility for scaffolding installation work
□ Concussion □ Electric shock (exceeding safe □ unsafe behavior □ Secure emergency evacuation routes and familiarize □ Installation of scattering prevention net during welding work □ Fall/drop object precautions (blocking/opening)
voltage) yourself with workers' actions
Prior consultation on content, methods and sequence It is forbidden to work up and down
□ Scratches (wounds) □ arch □ Mistakes by workers, inexperience □ of work □ Damage to grounding and cable sheathing of related devices □ simultaneously
□ Chemical contact chemical factor (substance) □ Non-compliance with work □ Use of specified tools and equipment (including □ Mark a Blind Location in Drawing or list □ Confirmation of permit to use scaffolding
procedures explosion-proof devices)
□ Edema (impaired local blood circulation) □ Hazardous substances, gases or □ Improper working methods □ Physical inspection/appearance of the device □ Attach a hazard label to the blind installation location □ Installing cobra or safety blocks on vertical
reactive substances ladders
□ Hearing disorders □ liquid, fog □ Non-compliance with work □ Disposal of hazardous, flammable and toxic substances □ Manage accessor lists heavy equipment work
regulations in containers/equipment
Not wearing personal protective Heavy equipment work plan (including rigging
□ Impaired vision □ solid (dust) □ equipment □ Isolate pipes/vessels before opening and inserting blinds □ Limited space work program □ plan)
Removing residual pressure and temperature from Control crane working radius and signal man
□ Skin disease □ radiation managerial factors □ piping and facilities □ Use portable gas detectors □ placement
work environment factors □ Lack of coaching and supervision of □ Check grounding conditions (except for double □ workers must wear air respirators □ Occupy road bodies (notify and secure when all
workers insulation research) lanes are occupied)
□ Climate / high temperature / cold □ Safety rules, etc. not posted □ Interlock Facility Protection Measures □ Installation of ventilation equipment □ Driver qualifications
□ space and motion □ (irrational) □ Material safety data sheet □ Calibration of radiation protection devices and equipment □ Consider routing emergency vehicles such as
fire trucks and ambulances
Instructions are different for each Signal number setting and signal method
□ Working time (deadline shortened) □ supervisor □ Material Safety Data Sheets □ Mark the crew transport vehicles and set their operating times □ unification
□ job specifications or job drawings □ Wear a radiation dosimeter and radiation protective clothing
No : 002 /JSA
Company : PT.
1.1
1.1
1.2
1.3
1 Preparation / Persiapan
1.4
1.5
1.6
3.1
2 installation Activity
3.2
3.3
Sequence
Communication Misscom
Communication Misscom
(License
Document Docum
work )Do
lokasi an
Equipment d
Work tools (Persiapan Peralatan) used. (Peral
Working at h
person wou
Work at Height
dapat d
dapat d
Material sharp
Benda tajam
Co
Review(1st) :
In charge of displine
Potential Hazard
(Hazard)
Equipment damage
alat rusak
Fall down
spline
Potential Hazard
(Hazard)
Injury / Property
unication. (Kesalahan dalam komunikasi) failure ( ceder
Injury / Property
unication. (Kesalahan dalam komunikasi) failure ( ceder
Type of
Injury
ling from work area and falling objects causing serious bodily
ury Jatuh dari tempat
kerja dan kejatuhan benda mengakibatkan cidera serius.
riuos Injury for workers
cederah serius pada pekerja
riuos Injury for workers
cederah serius pada pekerja
CM : PTW Controlor :
buh,
- perform manual lifting simulataneously
Melakukan manual lifting secara b
ermit at site 3 2
permit di lokasi kerja)
e by supervisor, pemeriksaan pada alat 3 2
ui oleh pengawas
neously
lifting secara bersama 2 1
int body
olkan pada anchor point
caffold in use
aat perancah sedang dipergunakan
int body
olkan pada anchor point
di daerah pembongkaran 2 1
2 1
bali alat-alat kerja tempatnya
al : Material
ssessment
Improved measures
Risk
CIII
CIII
CIII
CI
Weekly Environment Check list pemer
lingkungan
CI
Site Manager
Risk Assessment
es
F S Risk
alidation , 1 1 CIII
ter di TBM
ertificate
on 1 1 CII
alidation 1 1 CII
by HSE 1 1 CII
Inspection
1 1 CII
tanda
ng 1 1 CII
moving.
um di pindahkan
disolisasakann
tice at TBM,
asikan petunjuk kerja 1 1 CIII
pemeriksaan
ah 1 1 CIII
ning
memantou
n
afety Net.
net keselamatan
mengajukan
kerja di ketinggian
point
melakukn
men
n FBH
akaian FBH
caffolding
anscaffolding
Daily
ector kine
pector scaffolding
Daily
tine berkomunikasi
1 1 CII
Daily
1 1 CII
1 1 CIII
mpat kerja
mpat kerja 1 1 CIII
1 1 CIII
Memantou 1 1 CIII
ty
1 1 CIII
1 1 CIII
pemeriksaan
1 1 CIII