EMERGENCY RESCUE PLAN

(Critical Activities)
Cirebon 2, 1 X 1000 MW Coal Fired Power Plant Project

Task details
Company: PT KOIN KONSTRUKSI Area : BOILER AREA
Drill Date: Sept 6, 2020 (Plan)
Description of task:
Oil Spill from heavy equipment on ground Boiler

Type of rescue
Confined Space Rescue Working At Height Rescue
Deep Excavation Rescue Working near or above water (Fall Into Water Rescue)
Restricted Work Area Rescue Diving Rescue
Cleaning oil spill

Communications: Methods to be employed between the worker and supervisor / rescue team
Direct voice communication Mobile phone Megaphone Hand flare
Whistle Two-way radios chanel No....... Air horn Other................

Emergency contacts Name Contact no.


Join Partner Incident Commander ADE R 0813-2945-1066
DEJU 0818-0828-1636
Rescue Team: A. SAPRUDIN 0838-1828-5293
CECEP 0813-8219-9776
ANGGA 0821-2035-5215
First aider(s): RODI 0895-3950-5263-9
(able to treat suspension trauma)

IRTA 0813-2502-5575
Fire Warden, Attendant/ Standby personnel
HANAFI 0822-6150-8080
Other Support Personell WANTURI ‘081313230701
i.e Crane operator and rigger

Wild Animal watcher during diving

HDEC Incident Commander Ahmad Mulyadi 0813-7295-4478


HDEC Deputy Incident Commander Asis 0812 7091 7353
HDEC Ambulance Samsudin
HDEC Clinic Emergency 0811-2377-555

If the site rescue team is unable to affect a rescue within 5min, Emergency Services are to be called on HDEC incident
comander or deputy.
Note: The supervisor shall be prepared to provide the following information to emergency services as a minimum:
 Location and Injured person condition

Page 1 of 7
EMERGENCY RESCUE PLAN
(Critical Activities)
Cirebon 2, 1 X 1000 MW Coal Fired Power Plant Project

Safety of rescuers: Tick as appropriate


Are clear access available, safe and wide enough for rescue? Yes No

Are operators trained competent & in date in use of rescue equipment? Yes No
Are rescue training records in date? Yes No
Are there a sufficient number of rescuers and other personel available? Yes No
Are all emergency personeell aware about emergency instruction and procedure? Yes No
Is rescue equipment selected appropriate for nature of work? Yes No
Have assessments been made of anchor points, and are they in date for test? Yes No

What obstructions are in the way of reaching the Injured person, suspended person? (Detail below – sketch location of emergency
equipment, access, pick up

Page 2 of 7
EMERGENCY RESCUE PLAN
(Critical Activities)
Cirebon 2, 1 X 1000 MW Coal Fired Power Plant Project
Safety of rescuers: Tick as appropriate

Page 3 of 7
EMERGENCY RESCUE PLAN
(Critical Activities)
Cirebon 2, 1 X 1000 MW Coal Fired Power Plant Project
Safety of rescuers: Tick as appropriate

Page 4 of 7
EMERGENCY RESCUE PLAN
(Critical Activities)
Cirebon 2, 1 X 1000 MW Coal Fired Power Plant Project
Safety of rescuers: Tick as appropriate
Has consideration been made to method of attaching the Injured person? (Detail below emergecy instruction)

 In case of one heavy equipment (Crane 220T) was get oil leakage on hydraulic part when lifting activity on
BOILER area happened, report to Supervisor, Safety personnel or ERT in charge, do not panic
 Stop related activity
 Give detail report information about Crane 220T condition including part of hydraulic that was damage
 Make sure material already release on below elevation when operator know that the hydraulic was leakage
 KOIN safety personnel report to ERT KOIN commander
 ERT KOIN commander will forward this information to first aider and evacuate team, wheatear any victim from
workers, ERT KOIN Commander also ask to foreman cleaning bring equipment and tools to directly toward to
scene and bring the cleaning team
 First aider and evacuate team observer arrived at the scene, soon they do observer to Crane 220T and around
environment at boiler ground, after confirm that no victim in this accident, first aider report to ERT KOIN
Commander.
 Directly by radio, KOIN ERT commander makes sure to foreman cleaning that already stand by on scene. KOIN
ERT commander by radio inform to evacuate team to install hard barricade around 220T and standby to monitor
the spill. Cleaning team give a sand around the leakage area the purpose is to absorb the oil with the sand after
that cleaning team preparing sack, team cleaning load the sand to sack and preparing light vehicle to transfer
sack to B3 storage.
 After all finish team cleaning continue to clean leakage with spray with water and made clean leakage area.
After all finish evacuate team report to ERT Commander that oil spill already handle with safe, hard barricade
can be open again, lifting activity can continue again.

Page 5 of 7
EMERGENCY RESCUE PLAN
(Critical Activities)
Cirebon 2, 1 X 1000 MW Coal Fired Power Plant Project
How will rescuers get to casualty? Tick as appropriate
Rescue ladder system ☐ Rescue haul system ☐
Entry rescue ☐ Forcible entry ☐
Pull casualty in through scaffold ☐ Pull casualty up through floor/slab/roof ☐
Climb / abseil down building / structure ☐ Suspended access equipment ☐
Aerial equipment from ground ☐ Crane man basket ☐

What equipment is needed to ensure rescue within 5 minutes? Tick as appropriate


First aid responder bag SCBA/ SCUBA (include spare cylinders) ☐

General / Basket Stretcher Harness Rescue for Working at height

Scoop Strecher ☐ Harness Rescue for Confined Space ☐


Toxic shock strap ☐ Tripod
Ropes Personal Gas Detector ☐
Climbing / rope rescue system ☐ Confined Space Harness Rescue ☐
Aerial ladder truck ☐ Suspended Access equipment ☐
Rescue ladder ☐ MEWP ☐
Gotha Kit (Suspended in harness rescue equipement) ☐ Certified Man basket

AED Crane

Rescue Stretcher for confined spaces ☐ Rescue boat ☐


Ring bouy ☐ Others: ...Handling oil spill..............................................

Other considerations: Detail as appropriate


Lone working precautions: No lone working approved
Weather conditions: Provide Shelter for worker , for working in-out door in rain , workers wearing rain coat
The absent of emergency personnel shall be reported to incident commander and find the replacement.

Prepared by Reviewied/ Approved by


Join Partner HSE Manager/ Coordinator HDEC HSE Manager
Name:

Signature:

Date

EQUIPMENT USED :
1. BROOM 6. BUCKET
Page 6 of 7
EMERGENCY RESCUE PLAN
(Critical Activities)
Cirebon 2, 1 X 1000 MW Coal Fired Power Plant Project

2. WISTLE

3. HARD BARRICADE

4. SACK TO TRANSFER SAND

5. A SAND

Page 7 of 7