1.0 PURPOSE
This procedure describes the establishment of plans and procedures to identify the potential for, and
responses to, incidents and emergency situations, and for preventing and mitigating the likely pollution,
illness and injury that may be associated with them.
2.0 SCOPE
3.1 REFERENCE
3.2 ISO 14001:2015 and ISO 45001:2018 SHE Management Systems – Requirements
Clause 8.2 Emergency Preparedness and Response
4.2 DEFINITION
a. Emergency
Any unwanted (anticipated/identified) incident, that may pose danger to life, property and
environmental.
b. Assembly Area
Safe location identified within or outside the workplace where personnel on the scene of
emergency will assemble
c. SHE Manual
Specification for the SHE management system of SEB.
d. General procedure
Document describing specified way to carry out an activity or a process that is applicable
to all within SEB SHE-MS.
4.3 ABBREVIATION
a. SEB
Salcon Engineering Berhad
b. SHE
Safety, Health, Environment
c. SHEMS
Safety, Health, Environment Management System
d. SDS
Safety Data Sheet
e. COO
Chief Operating Officer
5.1 PROCEDURE
5.5 SEB shall communicate and provide relevant information to all workers on their
duties and responsibilities;
TASK ROLES & RESPONSIBILITIES
Workers Before
a. Get to know your ERT
b. Understand ERP process flow
c. To familiarize emergency Evacuation, exit and Assembly Area
During Evacuation
After Evacuation
a. To lead the team back to workstation
First aid leader a. To ensure SEB continually replenish first aid boxes and properly log the used
items in first aid log book
b. To update ERT Commander on latest situation and information
c. To supervise the first aiders on the emergency day
d. To ensure SEB set up and maintain their first aid facility and it is
adequately equipped
e. To ensure that adequate numbers of first aid box are available at project site and
place at appropriate location
f. To provide first aid treatment to the injures personnel before attended by proper
Medical Service Personnel
g. To inform ERT Commander on the injured and treated personnel
First aid Team To carry out task as instructed by the First Aid Leader
Liasion Officer He shall liaise with external party regarding any inquiry pertaining to the incident
Celcom M SB
03-55122900
Telekom Malaysia
Bhd 03-55109191
Appendix B : Emergency Contact No for Utilities (Town Council, Water Department & Others
Contact no)
5.7 SEB take into account the needs and capabilities of all relevant interested parties and
ensuring their involvement, as appropriate, in the development of the planned response.
5.9 SEB maintain and retain documented information on the process(es) and on the plans for
responding to potential emergency situations. :-
a. Post mortem report
b. ERP Briefing Record
a. The Emergency Response Team (ERT) and Person in Charge shall ensure all
the emergency equipment and facilities are provided and available at all times.
b. Among the examples of equipment and facilities are: HQ vs Site
a. Alarm system
b. Fire fighting equipment
c. First aid facilities
d. Spill kit
e. Stretcher etc.
6.0 APPENDICES
Identification through:
Hazard & risk assessment analysis Identification of
Environmental aspects potential
Historical data or past experience
Size of ERT depends on the size of workplace and its Setting / appointment
scope of work. of Emergency
Response Team
(ERT)