DRILL REPORT

Mustering/
Type of drill : MEDEVAC DRILL : Assembly Point
Evacuation
Date of drill : 04-10-2020 Time drill : 13.00 – 14.30

1. Objective
- To find out capabilities of each person involved and emergency comunication system.
- To find out the exact time needed to transfer IP from project site to HDED Clinic.
- To familiarise first aid team and clinic staff to treat the IP and handle the medivac.
- To find the areas need to be improved as per drill observation.
2. Scenario
The welder doing activities welding tube in elevation 51m using basket. The welder prepare all
tools and equipment with the team and then does the activity as usually, after a few minutes
doing the activities, the welder suddenly get electric shock with an unknown causes of the
problem, the IP feel weak and then unconscious in the workplace.
3. Response
Sequences Plan Actual
1. Incident occurred, team of IP report to his supervisor 2
2. IP’s supervisor inform to safety supervisor Incharge 1
3. Safety supervisor reports to KOIN ERT commander that
1
Incident happen on Boiler EL 51M area.
4. KOIN ERT commander take control on radio line and report
to HDEC ERT commander and ask for ambulance to pick 1
up IP on Boiler area
5. KOIN ERT commander call first aider and evacuated team
to headed for IP location and brought first aid bag and 2
stretcher.
6. First aider and evacuate team arrived to IP location, first
aider observation IP condition, after observation first aider
give some treatment to IP, after give treatment while waiting 8
IP in a stable condition. IP transfer to scratcher by evacuate
team.
7. First aider give information to ERT Commander that IP
ready to evacuated. IP evacuated trought access direct and 2
go down to the ground using construction hoist
8. Ambulance and paramedic mobilized to scene of incident
3
near from construction hoist
9. IP already reach ground area and transfer to ambulance, IP
5
transfer to ambulance and bring to Hyundai clinic
Total Time Required

4. Observer COMPANY
1. CEPR
2. CEPR
3. HDEC
4. HDEC
5. Area for improvement
Deficiencies Identified Action Required Action by Target Date

6. Attachment

Cirebon, 10 April 2020

Prepared By Approved by

Dadang Hermawan Andi Agus Salim


Safety Officer HSE Manager