Lifting and carrying of Heavy load carried by workers should not exceed the limit (Adult man - 55kg,
5 2
excessive weight Adult woman - 30 kg, Adolescent male - 30 kg, Adolescent female - 20kg)
Heavy loads exceeding the limit is carried with the aid of more workers or
3
machine
1 Availability of EHS manual
2 All staff and workers trained on the health and safety aspects.
3 Drinking water being tested
4 Work place of the staff and workers maintained nead/clean and hygienic
Health and Safety 5 Workers provided with neat/ clean and hygienic labour camp
6
Provisions 6 Sufficient number of toilets provided at site and labour camp
7 Sewage tank being cleaned frequently
8 Medical checks being done for the new workers joining the site
9 Medical camps being conducted at the labour camp
10 First Aid training being given for all staff and workers
Dangerous and Usage of PPE ensured in hazardous areas (nose mask/ ear muff, Safety
7 1
Harmful environment goggles/ Hand gloves)
Safety net being provided at different levels around the periphery of the
8 Overhead protection 1
building as overhead protection
Flammable materials are stored in a location earmarked from the site with
1
9 Corrosive substances proper signage's
2 Fire extinguisher provided at the location of fuel storage
10 Eye protection 1 Usage of Safety goggles ensured during welding/ cutting/ chipping/ grinding
1 PPE (Safety shoes/ safety gloves) ensured while using electrical equipments
2 Warning signage's displayed at the electrical hazardous location
11 Electrical Hazards 3 Sufficient RCCB provided at site and Labour camp
4 RCCB checked on fortnightly basis
5 Proper earthing ensured for all stationed equipments
Illumination of Proper lighting facility provided at passageways/ confined areas/ stairways/
12 1
passage ways landings.
1 Materials stacked properly
2 Proper signage's provided
13 Stacking material
3 Proper barrication provided
4 Material stacked properly without causing obstruction to the passageway
1 Debris shifted from the building through debris chute
14 Disposal of Debris 2 Debris collected in the debris yard
3 Debris disposed from site on daily basis
Temporary structures/ temporary water tanks/ GI sheet barrication /
15 Stability of structure 1 hoardings are supported and protected properly from fall due to heavy wind
pressure or heavy vibration
Numbering and
16 1 Floor numbering being provided at each floor level
marking of floors
1 Lifting of scaffold materials using rope pulley is done by trained workers
Construction and
17 maintenance of lifting 2 Rope pulley is ensured to be in proper condition
appliances
3 Rope pulley not overloaded
1 22/07/2011
QST Safety checklist as per BOCWA
2 22/07/2011
QST Safety checklist as per BOCWA
2 Hoist shafts are provided with rigid panels or other adequate fencing ensured
The walls of hoist shafts, except at approaches, extend to at least two meters
3
above the floor or platform of access to such shafts
4 Approaches to a hoist are provided with gates
5 Approaches to a hoist are adequately illuminated
The hoist platform is ensured to be safe from bending/ buckling and safety
6
net is provided below the platform to prevent from falling objects
7 The unloading platform designed to carry maximum load
8 Safety nets provided to prevent objects falling inside the hoist shafts
Hoist towers are erected on a firm foundation which is securely braced/
9
guyed and anchored
10 All gearing on the hoisting engine are properly enclosed
11 Proper protection of steam piping of the hoisting engine ensured
12 Electrical equipment of a hoisting engine is effectively earthed
27 Hoist Suitable device to stop the hoisting engine as it reaches the highest stopping
13
place is provided
The hoist engine is placed in proper enclosure to protect the engineer from
14
weather and falling aspects
The steam is properly exhausted so that it does not obstructs the operators
15
view or injure the operator
16 The hoist not used in a reverse motion without first bringing it to rest.
17 Material hoist not used for the conveyance of persons
18 Platform is ensured to be safe to carry the maximum designed load
Proper locking arrangement to be provided In the cage of the manpower
19
hoist
The sides of a platform of a hoist which, are not used for loading or
20 unloading, are provided with toe-board and enclosures of a wire mesh or any
other suitable means to prevent the fall of any part of a load from such
platform
21 The counter-weights of a hoist run between guides
Proper signage (stating maximum carrying capacity/ maximum lifting
22
capacity/ type of hoist) is displayed in Kannada/ English/ Hindi
3 22/07/2011
QST Safety checklist as per BOCWA
Heat treatment of
30 1 The chain rings/ hooks used in the hoist is annealed once in 12 months
lifting gears
Certificate to be
issued after actual
31 1 All testing certificates is available at site
testing and
examination
Register of periodical
32 test, examination and 1 A register is maintained for the periodical test done
certificate thereof
4 22/07/2011