Project : Upgrade of M41 road section between Avicenna Monument and the West Gate, km 0 – km 1.2; km 1.94 – km 4.0; km 4.0 – km 4.9
RISK ASSESSMENT
Method Statement No: Assesed By: Ahmatbekov Ilhom Activity: Super Structure Construction
1 2 3 4 5 6 7 8
Factors of Harm Factors of Harm (after PCM)
Hazard Risk Rating Control Measures
Proposed Control Measures (PCM)
Likelihood Severity Risk Rating Likelihood Severity x<4 Implemented by
3) High reflective jackets must be worn by operatives all the time while
at work
Site Accidents 3 3 9 1 2 2 Engineers & Foreman