You are on page 1of 24
eee at GOVERNMENT OF ANDHRA PRADESH, WATER RESOURCES DEPARTMENT. ee From, To Er.R.Sathish Kumar, B.E., The Principal Secretary Engineer-in-Chief (IW),(FAC)., to Government., Water Resources Department, Water Resources Department, 2™ Floor, Jalasoudha Building, A.P. Secretariat, 4" block, Irrigation Compound, Governorpeta, Velagapudi, Guntur Dist., Vijayawada-520002 Andhra Pradesh. Letter No. ENC/IW/P&M/EE.1/W1/4097-2008-Vol.6/2023-2, Dated:-03 -05-2023. Sir, Sub: Water Resources Department — Maintenance Establishment — Request for sanction of work charge establishment of 4 cadres i.e. Electrician, Fitter, Helper and an Mazdoor) posts for operation and maintenance of gates under the control of the Engineer-in-Chief (Irrigation), Water Resources Department, Vijayawada ~ On outsourcing basis - Submitted - Reg. Ref: 1. G.O.Ms. No. 107, PWD, Dated 07.02.1974. 2. CE/CDO Vijayawada Lr. No. CE/CDO/DIV-4/166/2019, Dt. 16-9-2019. 3.T.O Lr, No. ENC/IW/P&M/EE.1/W1/4097/2008-Vol.IV, Dt. 29-10-2019. 4, Govt, Memo. No. MJIROSERR/220/2019/SER.IV(1051164),Dt.18.2-2021. 5,Review Meeting with Principal Secretary to Government, W.R. Department held on 17.02.2023. 6.This office letter No. ENC(IW)/P&M/EE.1/W. Sec/W1/4097-2008 Vol.6 / 2023, dated:-28.04.2023. -000- In continuation of this office letter 6" cited above, and as per the directions of the Hon'ble Principal Secretary to Government, Water Resources Department, Government of Andhra Pradesh during the review meeting on 17.02.2023, it is to submit that the temporary appointments of Work Charged Employees are not filled up in accordance with the requirements and due to legal complications of NMRs for regularization as per Cases, the temporary appointments / NMRs engagements are banned as per Act 2of 1994. After retirements of the employees, the maintenance staff has been decreased in the projects in the four cadres such as Operator cum Fitter, Electrician cum Welder, Helper and Man Mazdoors which are essentially needed in the operation and maintenance of the Spill way and Crest Gates of Major and Medium Irrigation Projects including others at present. The Chief Engineer, Central Designs Organization, Vijayawada vide reference 2 cited has communicated the duties and responsibilities of Operator cum Electrician and Operator cum Fitter are as follows: 1. Operator cum Electrician Operator cum Electrician have to work in shifts to operate the hydraulic gates as and when need arises and as per the instructions of the project authorities. All the electrical items are to be checked and kept in operable condition. © Any operational troubles arise during the period shall be tackled, if the problem beyond their capacity arises. It shall be intimated to the mechanical unit staff urgently to rectify. Any untoward incidents occur during flood control operation of spillway gates and water regulator of head sluices or head regulations are to be intimated to the Engineer in charge. 2. Operator cum Fitter * Operator cum Fitter have to work in shifts to operate the hydraulic gates as and when need arises and as per the instruction of the project authorities. All the electrical items are to be checked and kept in operable condition. ¢ During operations, if any unusual sounds and trouble encountered, it shall be intimated to the Engineer in charge immediately. As per the experience by the field staff during inspection by the Advisor (Mech) and the Inspecting Officer (Hydro-Mechanical Works) and on trial basis it was Proposed to provide 1 No of Helper, Man Mazdoor- 1 No. Operator cum Fitter- 1 No Operator cum Electrician-1 No for 10 Nos. of Gates and also the same for subsequent 10 Nos. of Gates on part thereof, as an experimental/trial basis for the Gates of Dams. Spillways etc is as follows. For regular maintenance for major projects in the State, the following staff maybe provided. [ Nos. of Staff required Project with No. | Operator cum | Operator Man Mazdoor Helper of Gates Electrician | cum Fitter Up to 10 Nos. | a aT 1 ieee | | of Gates | Up to 20 Nos. 2 2) 2 2 of Gates Above 20 Nos. of Gates and 2 2 2 = for each 20 Nos. Of Gates 1 Further , it is submitted that the field Engineers (with civil engineering back ground) entrusted with dam maintenance works are unable to tackle the works pertains to Hydro Mechanical equipment maintenance, repairs and replacements properly, which results in operation troubles, repairs and replacements are taking place, the life of the equipment is getting reduced. The frequent operation problems affect the smooth functioning of the systems. In the absence of fresh recruitment and in the wake of retirements of existing operators of dam gates, workforce / operators are necessary for proper functioning. In this connection, it is to submit that a review meeting have been conducted with all the Unit officers who are in operation and maintenance of Major and Medium Irrigation Projects in the chambers of Engineer-in-Chief (AW/IW) on 23.09.2019 and finalized the requirement of Operator cum Fitter, Electrician cum Welder, Helpers and Mazdoors as per the norms by the Chief Engineer, Central Designs Organization, Vijayawada and finalized the requirement of 4 cadre posts is 567 Nos and submitted the requirement proposal accordingly excluding the existing working strength of 184 No’s and actual requirement of 383 Nos of posts in the 4cadres i.e., Fitter cum Operator, Electrician cum Welder, Helpers and Mazdoors on permanent basis with financial commitment of Rs. 9.5 Crores per Annum. Government vide memo 4" cited has directed to furnish report on feasibility to quantify the work to be done and engage an agency to execute the work on the “Service outsourcing” basis, duly following a transparent and objective process for the same, instead of engaging staff for the purpose. In this connection it is to submit that the 4 cadres of posts as stated above are essentially required in the operation and maintenance of the Project Gates such as Spill way gates and Crest gates of the Major and Medium Irrigation Projects. Further, it is to submit that some of the ongoing projects like SSLC & SB Circle (Sangam Barrage and Nellore Barrage) are completed and inaugurated by the Hon'ble Chief Minister and the retirements during the period 10/2019 to 12/2021, the requirement of staff in 4 cadres or which the Unit Officers have submitted revised proposals for operation and maintenance staff. Hence, the proposal is increased and finalized as 572 posts required. The Statement showing Circle wise requirement, present Working strength and balance requirement in Annexure | is here with enclosed for information. At present only 114 Nos of workers are working in the above 4 cadres in respective Circles of Projects concerned as per the data collected for the month of January 2023 for which there is an expenditure of Rs.10.94 Crores per Annum. The copy of statement showing the details of present working strength (including other cadres) and its financial implications for an amount of Rs.10.94 Crores per Annum (Annexure-Il) is here with enclosed. If the proposal for engaging the balance requirement of 502. No’s of skilled and semi skilled employees in the 4 cadres on out sourcing basis an extra financial implication works out as under in terms of G.O.Ms. No. 7 Finance (HR.IPLG &POLICY) Dept, dated:- 17.01.2022. Skilled workers i.e., Electrician cum welder & | Un Skilled workers i.e., Helper and Mazdoor Fitter cum Operator Remuneration in terms of G.O. Remuneration in terms of G.0. 5-15,000/- EPF @13% EPF @13% Rs. 1,950/- ES! @3.25% ES! @3.25% =Rs. 488/- APCOS Welfare Fund @ 1% on APCOS Welfare Fund @ 1% on Basict EPF+ ES Basict EPF+ ES =Rs. 174/- GST @18% (949) GST @18% (949) Rs. 2,700/- Total per month Rs .25,051/- | Total per month =Rs .20,312/- Financial implication works out per Annam as under “Cadre/post No. of posts | Remuneration in | Expenditure per | Expenditure per required. terms of G.O.Ms. No. month annum. 7 dated:-17.01.2022 per month Electrician cum 135 25,051/- 33,81,885 4,05,82,620 Welder Ss | Fitter cum 136 25,051/- 34,06,936 | 4,08,83,232 Operator Helper 138 20,312/- 28,03,056 3,36,36,672 Man Mazdoor 93 20,312/- 18,89,016 2,26,68,192 Total soz | 1,14,80,893/- | 13,77,70,716/- There is an financial implication/Additional expenditure of Rs. 13.77 Crores per Annum for the balance required posts of 502 Nos in the said 4 cadres can be considered on out sourcing basis. The copy of Statement showing the net requirement of above said 4 cadres in Circle wise for the above proposed posts in Project wise requirement is here with submitted for information. In view of the reasons explained above, it is requested that necessary sanction orders of the Government may please be obtained and communicated for Nos. 502 of work charge establishment of above said 4 cadres (i.e. Electrician cum Welder, Fitter cum Operator, Helper and Man Mazdoor) on outsourcing basis with financial commitment/Additional expenditure of about Rs. 13.77 Crores per Annum for operation and maintenance of Project gates and to safe guard the Government Property from heavy Floods in Water Resources Department. Encl.: 1. Annexure-Il 2. CE/CDO letter 2™ reference cited. Yours faithfully, Sd./-03.05.2023, R.Sathish Kumar, Engineer-in-Chief (IW) FAC., W.R. Department, Vijayawada. Copy submitted to the Commissioner, CADA, Water Resources Department, Vysya Bhavan, Hanumanpeta, Vijayawada for favour of information Copy communicated to the Engineer-in-Chief (Irrigation), Water Resources Department, Vijayawada and all the Chief Engineers of Water Resources Department, Andhra Pradesh for information. Copy to the Deputy Executive Engineer, Computer Section, Admin Wing with a request to place the proposal in official web site. sro MS ce, [ANNEXUREA ‘Statement showing the required posts of workcharged establishment of 4 Cadres (ie. Electrician, Fitter, Helper and Man Mazdoor) Circle wise Js. [AS per CE/CDO required strength in Nos. | Present working Strength in Nos. Balance Requirement inNos. No. Name ofthe Circle | Operator | Operator ‘an | Operator | Operator ‘Man | Operator ] Operator Man Remarks cum | cum | Helper | Mazdoor | cum | cum | Helper | Mazdoor] cum | cum | Helper | Mazdoor electrician | Fitter Electrician| Fitter Eleetsician i 2 3 4 5 é 7 8 2 To [1-8-0 132(5}19)| 416100) i ISangam Barrage & Nellore Barrage was inaugorated by the Honbi'e Chief Minister $5C8S8 Circe, Nellore 3 | 36 3| d o d o | p 3 )on 06-09-2022. For Operation of these projects requirement of staf requested by the Superintending Engineer, SSLCRSS 4 circle, Nellore as per guide lines. alsenc, Guntur 3 p 3 al d 2 13] d 3 ¢ : al 3lse/ic, ananthapur 5 5| s s q | d 7| 5 3 5| , JSomasia Project *Heirce,Netiore a 2 AI 2 y q 1 4 y 2 y 5|se/c, Visakhapatnam 3 3 3 | 4 q y x g 3| 3 , 6lreHtc, Ananthapuram 3 9 3] B Q q G g | J 3 d 7}oaM circle, Lingamguntia :] i y y g o| g o 1 1 1 y afse/ic,sobbil A 5| A 3 d | d A 5 5| 5| + 9|TTPR Circle, Vizianagaram, | fl a 4 9 ol 9 9 4 4] 4 4 RR Vamsadhara Project 1olcielesthaklam | 5 z| 5 9 9 2 y 5 5 3 4 aafse/tc,eturu L 4 4 4 A d | o| 4| 4 4 4 12|sa8¢ circle Nod, Nandyal 2 2 2| 2 Q d od | 2| 2| 2 2 13)se/Ic, chitoor g 3 3] 3 q | y| 2| | 9 A 7 14]5€/1c,ongote 2| 2 2| 2 d Ql d d 2] 2 2| 2| 15|construction circle, Ongole 3 3| 3 3| d d q d 3 3] 3 3| 16)R8 circle Wo. Nandyal 1 q 1 | | d d d 1 4 | | s. AS per CE/CDO required strength in Nos. Present working Strength in Nos. Balance Requirement inNos. No, Name of the Circle ‘Operator | Operator ‘Man | Operator | Operator ‘wan | Operator | Operator Man Remarks cum cum | Helper | Mazdoor | cum | cum | Helper | Mazdoor] cum | cum | Helper | Mazdoor Electrician | Fitter Electrician | Fitter Electrician | Fitter 17 |PIP LMC Circle, Tun 2 2 B 2 | | 3 2 y 2 5 | 1a|se/c, Dowlaiswaram 25| 25 25| 25 | | 2| A 25| 25| 23] 2 Pulichintala Project 19[circe,vissannapet 3 g a 4 9 q ol 9 2 2 2 2 20]SE/IC, Nellore 7 1 a 1 | d d d 7 | 7| 7 21|Se/ic,Kurnoo! 3 E al a d | d | al 3| | a 22|Se/IG.Kadapa 3 s 3 5 d | | | A 5 5 3 23|SKO GNSS Cirle, Kadapa 2 2 2 2 d o| | | 7 7 | 2 24[TGP Circle, Nandyal 3 3 3 3| | | | d 3 3 3| 3 [Dam Maintenance 25|circle,Srisalam 3 | | “| a Z 8 Z Z (| ; 3 26|SE/IC, Srikakulam 3 7 2 | | d | | 2 q| 2 7 27SE/C, Vijayawada 7 | Ei 7| | 1 1 Total| 137| 140] 16a] 131] 4| | 40| 66 135] 136] 138 3 for Enginee Sd/-D1:03.05.2023 R. Sathish Kumar, Engineer in Chief (1.W) FAC W.R. Department, Vijayawada Details of Work Charged Existing Employees i.e., Recognized Government Service by DDO Code wise as on January 2023 who are working in Project gates Operation and Maintenance Establishment for Major Irrigation Projects and Medium Irrigation Projects. sl.no, Name of rele are fenced Jen Vans |, cepnoe for emery 008 oso 7 [rnin ii ; a 2 [rion ce, vatopnnam Se [eee tes [ee [so 2 [ass cae. donne rea | ees [ome [Sess 0 1 rinion Ce, ctor com ese | |e e778 7 [oreo cee Arann Sees eer 1 tines ora Aes 229388 a_i Oa as [eres es [ey 0 ot rltion de nwa Sfp [ees ie [ee ews iss rae, ada esas n Irrigation Circle, Eluru a 5 : 2 = 15 _|SKD GNSS Circle,kadapa: _ % : - o o 16 ser oun Matec Gc pea | aes eee io ar tcasscnciencuone ae eos een o we [aP nc Gclemaner ||| | eer 21 |TTPRCircle, Vizianagaram i = & : o £ 22 (NTR TGP circle, Kadapa : - - o # [ss ton Kore acess 5 o 24 |HNSS Circle No.2,Ananthpuram. = = = - o B 25 _|PIPHW Circle, Dowlaiswarm s a Z - o e ve [pric cree Ton : sinless | eed tues 27 |PIPRMC Circle, Eluru : a - - o a 28 [orton dat : |i |g 208330 22 [is ob cs tremens : ess 0 22 [brash oes Ge alow eae uae wea 33 _|Irrigation Circle, Ongole a = - o 9 24 rete hesitation ea | re | | ee | 0 3 [iston Gre Doar Sse eee ers 75050 36 _|Chief Engineer, Hydrology = - : - ° 9 Eso Re mee she 5 yet wii OREE Oy ameor 5 Ince/ ta Vngeada se eee. [BR Ve Sale ee [eos a Gr eecntn ses orton, - ean ak ar noses [eran fae = bee a <3 oie CR pe =z eee Jeo Lr 3 a aaa OORT Solera A 2 [cE OC Wing, Coastal Region BAPERL, |viayawadaCiRCLE: QC & OA NSIC Circle, c Nuvu = : a 8 Ce, Ac Wing, Coastal Region RAPER, |viayawadaciRcte: Quality Controlviglances, Enauires Circle, Dowsiswaram [PPMU, ViayawadaCiRCLE: St Prontidsed Projets Monitoring Unit, Vijayawada, : : : : o IENClrrgation) Comp lorice@DowialswaramciRcle: SE OPM & ° Mechanica Circle, Oowlsiewaram é : : - 0 [ce Polavaram ligation Project Unit, loowaiswaramcIRCLE: SE DPM, PIP, ° loowlaiswaram : : é : a [ce, TP TirupaihiGiRCLE: TGP{Oesigns BOC) ° Tiupathi i E é ° [ce Neeru Pragathi VisyawadsCRCLE:Se, Neeru Pragath-luru e : 5 ib ° 4| 4 66] 40} ana} 9116691 {Total Expenditure of salary for 1 Year 10,94,00,292.00 orsay 10.94 Crs d/-Dt:03.05.2023 R. Sathish Kumar, Engineer in Chief (I.W) FAC lI) w a Das nee SEY boas T OF ANDHRA PRADESH SS Ua __URCES DEPARTMENT ae TO inn. SRINIVAS, SLTECH. MLE MGS The Engincer-In-Chief (Adm), Chief Engines, ‘Water Resources Department, Ceaual Designs Orgmisstioa, House No.48-10-9/1, Szibeleji ‘complex, Near Iroa yard. N.H Feeder Road, Bhsvesiparam, Vijayawada. ‘Near Ramavarappadu Circle, Vijsyeneds- 520012, Currency Nagar, ‘VIJAYAWADA -520008, ster N TV-an66n019 Subs - Proposals fo creation of staff fo operation and maintenance of goes under the control ofthe Engineer in-Chief (Irigaton), Water Resources Department, ‘Vijayawada — Submited - Reg. Refi 1. Chief Engineer, Central Designs Organization Letter No.CE/CDO/AP/EEM Daied:23.12.2015. 2. Chief Engineer, Central Designs Organization Letter No.CE/CDOVAP/EES/ Dat 3.2016. 3. Govt. Memo No. 1413371 WRG-GRC/2018 Dated:13.06.2018 Itis submitted that ia the combined state of Andhra Pradesh, the Mechanical Organization heeded by Chief Engineer (Mech, was looking after the mechanical works pertains to various existing ‘nrigation projets, on -going projects and workshops. The mechanical unt used to undertake fubriation, erection, operation & maintenance, repsirs and replacements of hydro-mechanical equipment, The workshops under mechanical organization were equipped with carpentry, foundry, fabrication and machine shops ete, used to undertake works pertains to other departments in addition to requirement of isigation department. After bifurcation of state of united Andhra Pradesh, the state mechanical circle was allowed to the state of Telangana. The residual mechanical organization reduced toa the state of Andhra Pradesh is sion, namely General Superintendent PW workshops, Seethanagaram Guntur district. ‘As per the information collected by the Inspecting Officer (Hydro- Mechenieal Works) {under the guidance of the Advisor (Mech), in response to the memo 3" cited (regarding checking of the operation of gates in the state, the following is submited, “The exiting mechanical unit working under administrative contol of the Superintending Engincer,Unigaion Cirle, Guntur namely General Superintendent, P.W.Workshop, Seethanagaram, is the only division inthe state looking ater the requirements of the entire state's gates operation, repairs te. Hence the proposals for strengthening of mechanical organization was submited vide reference I" & 2 cited. 1a this connection, itis submitted that for maintenance and operation of Hyéro Mechanical structures in various projects and major head reguleors and cross regulators etc, there are mors. than / 1000 spay gates (radial gates 350 and 650 vertical lift gates) in addition tothe head shuiees and scour sluices ofthe dams ete. There are number of ongoing projects which may inerease the numberof gates in ma Scanned by CamScanner ‘\ siaie, There are many number of completed and ongoing ang lift iigaton schemes inthe state which” * needs the services of mechanical and electrical staff for smooth functioning ofthe systems. = “he field Engineers (wit civil engineering back ground) entrusted with dam maintenance ___gjunable to tackle the works pertains o- hydro mechanical equipment maintenaice, reais and replace -sopetly, which results in operation troubles, repairs and replacements are taking place , the life of the equipment is geting reduced . The frequent opertion problems affect the smooth functioning of the systems. Inthe absence of fresh recruitment and in the wake of retirements of existing operators of dam gates, workforce / operators are necessary for proper funetioning. ‘As per the norms approved by the Board of Chief Engineers (Enclosed vide Annexure IV) for headworks gates with 40°X20'size (4-10 No’s of gates) ae to be provided with 4 No’s of Helpers, 1 No. Fi and 1 No Eleeisan. But sper the experience by the fld salt duringfapetons by the ‘Advisor (Mes) andthe Inspecting Officer Hyco Mechanical Works) and on tal bass twas proposed to provide No, Man Mazioor, 1 No Helper, I No, Operator cum Fite, 1 No. Operator cum Eectician for 10 No'sof gates and als the same for subsequent 10 No'sof gates or part there san experimental 1 vial bass forthe gates of dams, spllways ec. The same is enclosed in Annexure L. ‘As per the above provisions decided earlier on an experimental / wal bass, the work force sd iret urbe wes wdc acme | ‘Annexure Il, Based on the expe | staff an be effected subsequently. ee of the arrangement made above, the increase or decrease of the ‘The tentative wotkforee artived for most ofthe main dams areas follows ~ Operator cum Electrician -129 No's, Operator cum Fiter 132 No's, Helper-129 No's!Man Mazdoor - 129 No's. The total tentative workforce required are S19 No's. The deals are enclosed vide Annexure I Iris to submit that, the same was finalised with the consultation of General Superintendent, P.W. Workshop, Sethanagaram, as General Superintendent is conversant withthe field operations of gates and its upkeep etc. The tentative job chart ofthe workforcelstaff is enclosed vide Annexure HL. The total expenditure works out to Rs. 8.42 Cr per year based on outsourcing rates (Annexure V), Hence, the | Proposals may please be submitted to Government and orders may please be obtained to engage the above personne for operation and maintenance of gates. ‘Encls: Annexures (1 to V) Scanned by CamScanner ities of work charge establishment of # cadres (Le. Electrician, Fae === and sesponsibi é Mien Mazdoor} and norms for permanent cadre strength for sanction, 10 the posts cf! Annexure scesance for major projects inthe sate te fllowing staff may be provided Regular maistenan — Noss of Staff required. Project With Mazd / "No, Gates Operator cum | Operator eum | Man Mazdoor, Helper Electrician Fitter T Upto 10 Nosof 1 2 i Gates Up 20 Nos of 2 2 c g Gates Above 20 Nos of : | é Gates and foreach 20 2 2 5 : 4 no, of gates oS ‘Scanned by CamScanner a The Government inG.d. v ee Ms.No.107, PWD, Dated 07.02.1974 has x ala : large establishment = and zspoasi OF 4 cadres (i.c., Blectriczanilg Annexure IIT i Duties & Responsibilities of Operator cum Electrician and i Operator cum Fitter during Flood and Slack Season ‘The Operator cum Fitter and Operator cum Electrician deployed are to perform the following functions. 1 During Flood Season, 1.0) cian + Operator cum Electrician have to work in shifts to operate the hydraulic gates as and when need arises ant as per the instructions ofthe project authorities. All the electrical items are to be checked and kept in operable condition. Main switch Distribution and sub distribution boxes Panel boards Cables Generators Electric siren Limit switches Dial Indicators ea awe «Any operational troubles arise during the period shell be tackled, if the problem beyond their capacity arises, it shall be intimated to the mechanical unit staff urgently to rectify. «Any untoward incidents occur during flood control operation of spillway gates and water regulation of heed sluies or head regulator ae to be intimated to the Engineer in charge. 2. Operator eum Fitter Operator cum Fitter have to work in shifts to operate the hydraulic gates as and when need arises and as per the instructions of the project authorities. All the mechanical items are to bbe checked and kept in operable condition. A. Radial gates 1, Seals 2, Trunnion assembly 3, Radial arms and Horizontal girder joints 4, Lifing arrangements (Rope tension and rope fixing bolts) 5, Hoist mechanism a, End Dive Unit 5 ‘b. Central Drive Unit B, Vertical gates | Free movement of rollers Scanned by CamScanner t 4 fe “Gad responsibilities of work charge establish Sshment off cadres (Le, Leche ears ee. “Mex Mezdoor) and norms for permanent cadre strength for sanction to t= posts Sf vansnncetorss le duties of 4 cadres are as mentioned below. 2Seals eae 3.Horizontal girder joints i 4-Manual operation 5.Lifting arrangement/ Central Drive Unit * During operations, if any unusual sounds and troubles ‘encountered, it shall be intimated to ‘he Engineer incharge immediately, * The operations are to be recorded in the log books and are to be signed by the Engineer * The operators are to be Drovided with safety wear such as hand gloves, and the rubber mats on shoes, helmets etc, the Hoist Bridge are to be provided, IL During Slack Season The hydro Mechanical and Blectrical items and the vii from dirt and accumulation of water, * The watch and ward shall be the responsibility of the Operator, semi-skilled workman or ‘man mazdoor, ‘The problems encountered during operations and defects found are to be attended, the Problems occurred beyond their capacity ae tobe informed tothe ‘mechanical unit staff for rectification without any delay, ies are to be kept clean and free ‘They have to assist the mechanical unt staff during maintenance, ‘ie operations, minor repairs and maintenance works aro be Ssistance of semi-skilled and unskilled crew available at site, repairs and replacements, carried over with the are to be kept always in operable conditi spillway and service gates, * Every gate is to be operated (tral run) atleast monthly once. Any defects found to be teatifed with in his eapacity or refer to mechanical unit staff, Incase of small projects the canal gates off take sluices, cross regulator and escape regulators are to be inspected any minor repairs and replacements are to be attended, ifthe ‘epsirs and replacements are beyond their capacity they are to be referred to the ‘mechanical unit staff. ‘The dam site illumination to be look Or office to be attended by the elect 4 after along with minor electrical repairs in the camp trician when ever need arises, Sales are'to be patted with one coat, Duriag Painting, gates are to Operators have to assist mechanical unit Staff to operate the gate, stop logs ifneeded, * « Scanned by CamScanner 9 G.0.Ms.No.107, PWD, Dated 07021974 1a TRE ae responsibilities of work charge establishment of 4 cadres ick (Le., Electrician. Fite tao sovernment and Man Mazdoor) and norms for nermanant an Entering of any unauthorised persons tnd unauthorised operations carrie out by them isk A be prevented and such incidents shall be reported to the officers concemed immediately, | + They have to follow the detailed instructions made on the ‘equipment by the manuficturers, Ee (they get any doubt the same is to be got clarified by referring it to the concemed uit | incharge, * The main switch, distribution boxes, sub distribution boxes and panel boands arta be kept ‘lean and are to be protected from insects, Electrical items are to be maintained by the electrician and mechanical tems. are to be looked after by the fitter. Scanned by CamScanner | raza Rated S020 F Versi [3 Xo ry 2 25 [vai erie | —t oe Vera Bowes) | _* se 0 ere es Veve Tiere. Vevial | 1 oa oe Xora ci ai iste xs Vetat 1 aaa xia} 1 1 sealer |e Vertal [1 [igo ws 100 at is 200 10M 6 Beal tela tas aa z ox 100M a 7 Teal ene ie ‘Seb-Taal w oa Scanned by CamScanner 1S ‘Opener g “Tato ‘Operator Man 8 Name of Pr on pe| Remarks 8 ce ype Gate | Hoot Gate Seee (gona oe a ches Cro Ree 5 lg Ganga Cis Resor aa | > FCs Rel vais |? “ ype paer B (CO Yait—| 2 3 [adil Reo a e los Basar Rely Ds nat | 2 RrorSukraa Vile, Korl Dt ic open | -aated & ale epi taf —4 Sor Vet iat] ower ‘eid [6 lL Vet Repsltor eter [ 8 melee |! Hf at Re ast? Ses Basan oR veal {Fano x0 | False is | lhe ste feel | [2008 ort ‘ tee [led alpen GS ae Sori sie Set 0 [scat +f mom xasoo sds vet | | tamexere | aaa eee lee iva eee tro Fos eae 5st Bs 5 OW X5.0014 Zz sTRepor [tooo so ee veut —|—7—[inooxasm | alate le (eu fos Nes ses a oa es esd te yea Tomei Yai axe alsa ei Yes ax? : ‘ Hos sts Vat} a vee ns Shee Yatst [1 oF E = [esi ai aa r ligarse veut | 6 | omxzasm | ae rel tise Tae [ Huss rom 19 Sine BT Te Pas tS erste 2 SOE a | ea 2 ae = ~o : ys | np | asa | 9 | 9 38 Bae

You might also like