You are on page 1of 1

CONTENTS - 1 (GV3N), 2 (DS30), 3 (GV3N)

Cl Sub Description Page


No Cl No No

1.0 INTRODUCTION 01

2.0 SPECIFICATIONS 02
2.1 STANDARDS & OPERATING CONDITIONS
2.2 TECHNICAL DATA 02
2.3 NORMAL SERVICE CONDITIONS FOR INDOOR 02

3.0 STRUCTURAL DETAILS & GENERAL ARRANGEMENT 03


3.1 CUBICLE STRUCTURE 03
3.2 TYPICAL ARRANGEMENT 03
3.3 SF6 GAS SYSTEM 05
3.4 PRESSURE RELIEF DISC 05
4.0 HANDLING & STORAGE 07
4.1 PRECAUTIONS 07
4.2 PACKING AND UNPACKING 07
4.3 TRANSPORT AND HANDLING 08
4.4 STORAGE 09

5.0 INSTALLATION 11
5.1 CHECKS PRIOR TO INSTALLATION 11
5.2 FOUNDATION WORK 11
5.3 CUBICLE INSTALLATION 14
5.4 CONNECTING CONTROL WIRING 15
5.5 CONNECTING POWER CABLE 16
5.6 INSPECTION AFTER INSTALLATION 16

6.0 COMMISSIONING / TESTING 17


6.1 PRELIMINARY CHECKS 17
6.2 TESTING 17
6.3 START-UP 17
6.4 SWITCHING OPERATIONS 17
6.5 SAFETY INTERLOCKS IN GIS SWITCHGEARS 18

7.0 MAINTENANCE AND INSPECTION 25


7.1 FUNDAMENTAL PHILOSOPHY OF MAINTENANCE AND INSPECTION 25
7.2 CLASSIFICATION OF MAINTENANCE AND INSPECTION 25

You might also like