You are on page 1of 26

CRONOGRAMA VALORIZADO DEL PROYECTO

PROYECTO : MEJORAMIENTO DEL SISTEMA DE RIEGO CHINCHE MARGEN IZQUIERDA DEL DISTRITO DE MARANURA

PROPIETARIO : DDBEXPRESS
UBICACION : DPTO:CUSCO PROV:LA CONVENCION DIST:MARANURA LOC:CHINCHE
FECHA PROYECTO : 2/17/2022
Mes 1 Mes 2 Mes 3 Mes 4
Item Descripción Unid. Cantidad Precio Parcial Del 01/02/2021 Del 01/03/2021 Del 01/04/2021 Del 01/05/2021
Al 28/02/2021 Al 31/03/2021 Al 30/04/2021 Al 31/05/2021
MARGEN IZQUIERDA SECTORES DE CHINCHE Y
1 3889129.42 731855.79 725781.32 380346.46 598861.35
CHAQUIMAYO
1.1 OBRAS PROVISIONALES 59789.04 59789.04
1.1.1 CARTEL DE OBRA 1525.42 1525.42
CARTEL DE OBRA SEGUN DISEÑO ( INCLUYE
1.1.1.1 und 1 1525.42 1525.42 1525.42
COLOCACION)
1.1.2 CAMPAMENTO DE OBRA (300 m2) (01 UND) 4792.68 4792.68
1.1.2.1 LIMPIEZA DE TERRENO MANUAL m² 450 1.98 891 891
1.1.2.2 NIVELACION DE TERRENO NATURAL m² 450 7.87 3541.5 3541.5
1.1.2.3 CONSTRUCCION DE CAMPAMENTO m² 1 360.18 360.18 360.18
CAMPAMENTO PROVISIONAL A PIE DE OBRA (270 M2) (02
1.1.3 6580.94 6580.94
UND)
1.1.3.1 LIMPIEZA DE TERRENO MANUAL m² 600 1.98 1188 1188
1.1.3.2 NIVELACION DE TERRENO NATURAL m² 600 7.87 4722 4722
CONSTRUCCION DE CAMPAMENTOS MOVILES A PIE DE
1.1.3.3 m² 2 335.47 670.94 670.94
OBRA
1.1.4 CONSTRUCCION DE CAMINO DE ACCESO 46890 46890
1.1.4.1 LIMPIEZA DE TERRENO MANUAL m² 8000 1.98 15840 15840
1.1.4.2 CONSTRUCCION MANUAL DE CAMINOS DE ACCESO m 4500 6.9 31050 31050
1.2 TRABAJOS PRELIMINARES 166926.01 100161.93 47796.13 18967.95
1.2.1 TRANSPORTE DE MATERIALES A LA OBRA 153189.7 91543.87 42677.88 18967.95
1.2.1.1 FLETE TERRESTRE (Inc. CARGUIO Y DESCARGUIO) glb 1 59930.63 59930.63 59930.63
1.2.1.2 FLETE RURAL glb 1 93259.07 93259.07 31613.24 42677.88 18967.95
1.2.2 MUESTRAS DE CONTROL DE CALIDAD 13736.31 8618.06 5118.25

1.2.2.1 DISEÑO DE MEZCLA PARA CONCRETO F'c 210 KG/CM2 und 2 508.48 1016.96 1016.96

1.2.2.2 DISEÑO DE MEZCLA PARA CONCRETO F'c 175 KG/CM2 und 2 508.48 1016.96 1016.96

CONTROL DE CALIDAD DE CONCRETO (Rotura de


1.2.2.3 und 25 204.73 5118.25 5118.25
Briquetas)
1.2.2.4 VESTUARIO E IMPLEMENTOS DE SEGURIDAD und 2 3292.07 6584.14 6584.14
BOCATOMA SEDIMENTADOR Y CAMARA DE CARGA
1.3 159434.01 103734.42 40221.06 15478.53
CHINCHE MARGEN IZQUIERDA
1.3.1 BOCATOMA PRINCIPAL MI (01 UND) 145097.47 103734.42 40221.06 1141.99
1.3.1.1 TRAZO Y REPLANTEO PRELIMINAR m² 100 4.08 408 408
1.3.1.2 DERIVACION DE RIO m 50 390.64 19532 19532
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
1.3.1.3 glb 1 10000 10000 10000
MECANICO

1.3.1.4 EXCAVACION DE ROCA SUELTA CON EQUIPO MECANICO m³ 15 14.96 224.4 224.4

EXCAVACION MANUAL DE ROCA DURA CON EQUIPO


1.3.1.5 m³ 7 52.07 364.49 364.49
MECANICO Y EXPLOSIVOS

1.3.1.6 ELIMINACION DE DESMONTE CON EQUIPO MECANICO m³ 27.5 13.64 375.1 375.1

1.3.1.7 ENCOFRADO Y DESENCOFRADO m² 250 48.4 12100 12100


1.3.1.8 ACERO Fy = 4200 KG/CM2 (DOBLADO Y COLOCADO) kg 347 5.7 1977.9 1977.9
1.3.1.9 CONCRETO F'C=210 KG/CM2 (CON MEZCLADORA) m³ 8.3 481.56 3996.95 3996.95
PREPARACION Y VACIADO DE 40% DE CONCRETO
1.3.1.10 175KG/CM2 + 60% PIEDRAS EN POZAS m³ 204.5 395.71 80922.7 72830.43 8092.27
AMORTIGUADORASM

1.3.1.11 TARRAJEO EN EXTERIORES MEZCLA CEMENTO ARENA m² 112 28.04 3140.48 1998.49 1141.99

INSTALACION DE COMPUERTA METALICA MARGEN


1.3.1.12 und 1 1057.63 1057.63 1057.63
IZQUIERDA
1.3.1.13 INSTALACION DE ESCALERA DE GATO und 16 652.85 10445.6 10445.6
1.3.1.14 INSTALACION DE PARRILLA MOVIL und 1 552.22 552.22 552.22
1.3.2 SEDIMENTADOR MI (01 UNIDAD) 9455.56 9455.56
1.3.2.1 LIMPIEZA DE TERRENO MANUAL m² 4.79 1.84 8.81 8.81
1.3.2.2 TRAZO Y REPLANTEO PRELIMINAR m² 4.79 4.08 19.54 19.54
1.3.2.3 EXCAVACION MANUAL EN ROCA SUELTA m³ 9.69 92.07 892.16 892.16
1.3.2.4 REFINE , NIVELACION Y COMPACTACION m² 13.38 2.3 30.77 30.77
1.3.2.5 ACARREO DE MATERIAL EXCEDENTE m³ 15.31 18.42 282.01 282.01
1.3.2.6 ENCOFRADO Y DESENCOFRADO m² 17.18 48.4 831.51 831.51
1.3.2.7 CONCRETO F'C=210 KG/CM2 (SIN MEZCLADORA) m³ 6.97 495.72 3455.17 3455.17
1.3.2.8 ACERO Fy = 4200 KG/CM2 (DOBLADO Y COLOCADO) kg 104.85 5.73 600.79 600.79
1.3.2.9 TARRAJEO CON IMPERMEABILIZANTES E=1.5 CM m² 21.61 55.13 1191.36 1191.36
SUMIN. Y COLOCAC. ACCESORIOS SEDIMENTADOR
1.3.2.10 und 1 1647.61 1647.61 1647.61
MARGEN IZQUIERDA
SUM. Y COLOC. DE LIMNIMETRO METALICO GRADUADO
1.3.2.11 und 1 495.83 495.83 495.83
´Y NUMERADO
1.3.3 CAMARA DE CARGA MI (O1 UNIDAD) 4880.98 4880.98
1.3.3.1 LIMPIEZA DE TERRENO MANUAL m² 1.44 0.56 0.81 0.81
1.3.3.2 TRAZO Y REPLANTEO PRELIMINAR m² 1.44 4.08 5.88 5.88
1.3.3.3 EXCAVACION MANUAL EN ROCA SUELTA m³ 2.23 92.07 205.32 205.32
1.3.3.4 REFINE , NIVELACION Y COMPACTACION m² 7.44 2.3 17.11 17.11
1.3.3.5 ACARREO DE MATERIAL EXCEDENTE m³ 3.39 18.42 62.44 62.44
1.3.3.6 ENCOFRADO Y DESENCOFRADO m² 12.19 48.4 590 590
1.3.3.7 CONCRETO F'C=210 KG/CM2 m³ 1.51 495.72 748.54 748.54
1.3.3.8 TARRAJEO CON IMPERMEABILIZANTES E=1.5 CM m² 13.26 55.13 731.02 731.02
1.3.3.9 ACERO Fy = 4200 KG/CM2 (DOBLADO Y COLOCADO) kg 62.31 5.73 357.04 357.04
SUMIN. Y COLOCAC. ACCESORIOS CAMARA DE CARGA
1.3.3.10 und 1 1929.79 1929.79 1929.79
MARGEN IZQUIERDA
1.3.3.11 SUMINISTRO Y COLOC. TAPA METALICA 0.60x0.60m und 1 233.03 233.03 233.03
1.4 LINEA DE CONDUCCION MARGEN IZQUIERDA 971565.64 421746.34 549819.3
1.4.1 LIMPIEZA Y DESBROCE DE TERRENO MANUAL m² 3806.74 2.76 10506.6 10506.6
TRAZO, NIVELACION Y REPLANTEO DE ZANJA DURANTE
1.4.2 m 3806.74 1.75 6661.8 6661.8
LA EJECUCION

1.4.3 EXCAVACION PLATAFORMA MATERIAL SUELTO A MANO m³ 2561.27 169.73 434724.36 194876.44 239847.92

1.4.4 EXCAVACION MANUAL EN TIERRA COMPACTA m³ 1931.68 46.03 88915.23 88915.23


1.4.5 EXCAVACION ROCA SUELTA A MANO m³ 1159.01 62.38 72299.04 48199.36 24099.68
1.4.6 EXCAVACION MANUAL EN ROCA FIJA A MANO m³ 579.5 80.92 46893.14 46893.14
1.4.7 REFINE, NIVELACION DE ZANJA ML 3806.74 0.92 3502.2 3252.04 250.16
CAMA DE APOYO PARA TUBERIA CON MATERIAL
1.4.8 ML 3806.74 2.91 11077.61 4984.92 6092.69
ZARANDEADO.
CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA
1.4.9 m³ 9.25 440.79 4077.31 4077.31
(P/ANCLAJE)
1.4.10 RELLENO Y COMPACTACION m³ 2845.92 23.06 65626.92 65626.92
1.4.11 TUBERIA 168621.16 117354.4 51266.76

1.4.11.1 TUBO PVC ISO 1452 UF 250 mm C-5 c/ANILLO x 6.00 m ML 1480.13 69.63 103061.45 103061.45

1.4.11.2 TUBO PVC ISO 1452 UF 200 mm C-5 c/ANILLO x 6.00 m ML 300.02 47.64 14292.95 14292.95

1.4.11.3 TUBO PVC ISO 1452 UF 160 mm C-5 c/ANILLO x 6.00 m ML 820.06 31.43 25774.49 25774.49

1.4.11.4 TUBO PVC ISO 1452 UF 110 mm C-5 C/ANILLO x 6.00 m ML 580.1 20.09 11654.21 11654.21

1.4.11.5 TUBO PVC ISO 1452 UF 110 mm C-7.5 C/ANILLO x 6.00 m ML 626.44 22.09 13838.06 13838.06

1.4.12 ACCESORIOS 58660.27 35910.78 22749.49


1.4.12.1 TEE RED. UR DIAM 250 x 110 mm C/ANILLO und 4 720.4 2881.6 2881.6
1.4.12.2 TEE RED. UR DIAM 200 mm x 160 mm C/ANILLO und 1 512.51 512.51 512.51
1.4.12.3 TEE RED .UR DIAM 160 mm x 90 mm C/ANILLO und 1 236.75 236.75 236.75
1.4.12.4 TEE UR DIAM 110 mm C/A und 2 172.4 344.8 344.8
1.4.12.5 CURVA 45º UR DIAM 250 mm C/A und 21 318.37 6685.77 6685.77
1.4.12.6 CURVA 22.5º UR DIAM 250 mm C/A und 57 343.54 19581.78 19581.78
1.4.12.7 CURVA 45º UR DIAM 200 mm C/A und 8 286.14 2289.12 1144.56 1144.56
1.4.12.8 CURVA 22.5º UR DIAM. 200 mm C/A und 8 286.14 2289.12 1144.56 1144.56
1.4.12.9 CURVA 45º UR DIAM. 160 mm C/A und 35 138.47 4846.45 4846.45
1.4.12.10 CURVA 22.5º UR DIAM. 160 mm C/A und 17 138.47 2353.99 2353.99
1.4.12.11 CURVA 45º UR DIAM. 110 mm C/A und 20 82.95 1659 1659
1.4.12.12 CURVA 22.5º UR DIAM. 110 mm C/A und 26 82.95 2156.7 2156.7
1.4.12.13 REDUCCION UR DIAM 250 x 200 mm C/A und 1 185.79 185.79 185.79
1.4.12.14 REDUCCION UR DIAM 200 x 160 mm C/A und 1 154.14 154.14 154.14
1.4.12.15 REDUCCION UR DIAM. 160 mm x 110 mm C/A und 1 96.43 96.43 96.43
1.4.12.16 REDUCCION UR DIAM. 110 mm x 90 mm C/A und 2 42.14 84.28 84.28
1.4.12.17 REDUCCION UR DIAM. 90 mm x 63 mm C/A und 1 35.13 35.13 35.13
1.4.12.18 UNION PVC DIAM. 250 mm ISO C/ANILLOS und 13 251.88 3274.44 3274.44
1.4.12.19 UNION PVC DIAM. 200 mm ISO C/ANILLOS und 3 166.59 499.77 499.77
1.4.12.20 UNION PVC DIAM. 160 mm (6") ISO C/ANILLOS und 7 126.66 886.62 886.62
1.4.12.21 UNION PVC DIAM. 110 mm (4") ISO C/ANILLOS und 18 56.69 1020.42 1020.42
1.4.12.22 PRUEBA HIDRAULICA ML 3806.74 1.73 6585.66 6585.66
CAMARAS ROMPEPRESION LINEA DE CONDUCCION
1.5 3232.89 182.25 3050.64
PRINCIPAL (01 UNIDAD)
1.5.1 TRAZO Y REPLANTEO PRELIMINAR m² 2.31 4.08 9.42 9.42
1.5.2 EXCAVACION MANUAL EN ROCA SUELTA m³ 2.19 92.07 201.63 172.83 28.8
1.5.3 REFINE , NIVELACION Y COMPACTACION m² 6.08 2.3 13.98 13.98
1.5.4 ACARREO DE MATERIAL EXCEDENTE m³ 2.85 18.42 52.5 52.5
1.5.5 ENCOFRADO Y DESENCOFRADO m² 9.28 48.4 449.15 449.15
1.5.6 ACERO Fy = 4200 KG/CM2 (DOBLADO Y COLOCADO) kg 54.71 5.73 313.49 313.49
1.5.7 CONCRETO F'C=210 KG/CM2 m³ 1.49 495.72 738.62 738.62
1.5.8 TARRAJEO CON IMPERMEABILIZANTES E=1.5 CM m² 10.15 55.13 559.57 559.57
SUMIN. Y COLOCAC. ACCESORIOS CRP LINEA DE
1.5.9 und 1 661.5 661.5 661.5
CONDUCCION

1.5.10 SUMINISTRO Y COLOCACION TAPA METALICA 0.60x0.60m und 1 233.03 233.03 233.03

1.6 VALVULAS LINEA DE CONDUCCION 16280.92 204.9 12735.42


VALVULA DE CONTROL LINEA DE CONDUCCION 250 mm
1.6.1 9445.16 204.9 9240.26
(03 UND)
1.6.1.1 TRAZO Y REPLANTEO PRELIMINAR m² 3.24 4.08 13.22 13.22
1.6.1.2 EXCAVACION MANUAL m³ 3.47 55.24 191.68 191.68
1.6.1.3 REFINE , NIVELACION Y COMPACTACION m² 13.35 2.3 30.71 30.71
1.6.1.4 ACARREO DE MATERIAL EXCEDENTE m³ 4.51 18.42 83.07 83.07
1.6.1.5 ENCOFRADO Y DESENCOFRADO m² 22.47 48.4 1087.55 1087.55
1.6.1.6 CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA m³ 2.13 443.54 944.74 944.74
1.6.1.7 TARRAJEO EN EXTERIORES E INTERIORES m² 27.77 34.68 963.06 963.06

1.6.1.8 SUMINISTRO Y COLOCACION VALVULA F°F° DIAM. 250mm und 3 1743.91 5231.73 5231.73

1.6.1.9 SUMINISTRO Y COLOCACION TAPA METALICA 0.85x0.85m und 3 299.8 899.4 899.4

VALVULA DE CONTROL LINEA DE CONDUCCION 200 mm


1.6.2 2064.53 2064.53
(01 UND)
1.6.2.1 TRAZO Y REPLANTEO PRELIMINAR m² 0.98 4.08 4 4
1.6.2.2 EXCAVACION MANUAL m³ 0.95 55.24 52.48 52.48
1.6.2.3 REFINE , NIVELACION Y COMPACTACION m² 3.84 2.3 8.83 8.83
1.6.2.4 ACARREO DE MATERIAL EXCEDENTE m³ 1.24 18.42 22.84 22.84
1.6.2.5 ENCOFRADO Y DESENCOFRADO m² 6.39 48.4 309.28 309.28
1.6.2.6 CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA m³ 0.61 443.54 270.56 270.56
1.6.2.7 TARRAJEO EN EXTERIORES E INTERIORES m² 8.06 34.68 279.52 279.52

1.6.2.8 SUMINISTRO Y COLOCACION VALVULA F°F° DIAM. 200mm und 1 817.22 817.22 817.22

1.6.2.9 SUMINISTRO Y COLOCACION TAPA METALICA 0.85x0.85m und 1 299.8 299.8 299.8

VALVULA DE CONTROL LINEA DE CONDUCCION 160 mm


1.6.3 1423.73 1423.73
(01 UNIDAD)
1.6.3.1 TRAZO Y REPLANTEO PRELIMINAR m² 0.64 4.08 2.61 2.61
1.6.3.2 EXCAVACION MANUAL m³ 0.51 55.24 28.17 28.17
1.6.3.3 REFINE , NIVELACION Y COMPACTACION m² 2.56 2.3 5.89 5.89
1.6.3.4 ACARREO DE MATERIAL EXCEDENTE m³ 0.67 18.42 12.34 12.34
1.6.3.5 ENCOFRADO Y DESENCOFRADO m² 4.24 48.4 205.22 205.22
1.6.3.6 CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA m³ 0.35 443.54 155.24 155.24
1.6.3.7 TARRAJEO EN EXTERIORES E INTERIORES m² 5.36 34.68 185.88 185.88

1.6.3.8 SUMINISTRO Y COLOCACION VALVULA F°F° DIAM. 160mm und 1 606.77 606.77 606.77

SUMIN. Y COLOCACION TAPA METALICA VALVULA FºFº


1.6.3.9 und 1 221.61 221.61 221.61
DIAM. 160 mm
VALVULA DE CONTROL (02 UND) Y PURGA (01 UND) LINEA
1.6.4 3347.5 6.9
DE CONDUCCION 110 mm
1.6.4.1 TRAZO Y REPLANTEO PRELIMINAR m² 1.69 4.08 6.9 6.9
1.6.4.2 EXCAVACION MANUAL m³ 1.35 55.24 74.57
1.6.4.3 REFINE , NIVELACION Y COMPACTACION m² 7.2 2.3 16.56
1.6.4.4 ACARREO DE MATERIAL EXCEDENTE m³ 1.76 18.42 32.42
1.6.4.5 ENCOFRADO Y DESENCOFRADO m² 11.82 48.4 572.09
1.6.4.6 CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA m³ 0.94 443.54 416.93
1.6.4.7 TARRAJEO EN EXTERIORES E INTERIORES m² 14.94 34.68 518.12
SUMINISTRO Y COLOCACION VALVULA DE FºFº DIAM. 110
1.6.4.8 und 3 400.3 1200.9
mm
SUMIN. Y COLOCACION. TAPA METALICA VALVULA FºFº
1.6.4.9 und 3 169.67 509.01
DIAM. 110 mm

1.7 VALVULAS DE AIRE LINEA DE CONDUCCION (09 und) 6370.18

1.7.1 TRAZO Y REPLANTEO PRELIMINAR m² 1.02 4.08 4.16


1.7.2 EXCAVACION MANUAL m³ 0.38 55.24 20.99
1.7.3 REFINE , NIVELACION Y COMPACTACION m² 5.19 2.3 11.94
1.7.4 ACARREO DE MATERIAL EXCEDENTE m³ 0.49 18.42 9.03
1.7.5 ENCOFRADO Y DESENCOFRADO m² 7.89 48.4 381.88
1.7.6 CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA m³ 0.28 443.54 124.19
1.7.7 TARRAJEO EN EXTERIORES E INTERIORES m² 5.83 34.68 202.18
SUMIN. E INSTALAC. ACCESORIOS VALVULA DE AIRE
1.7.8 und 3 897.76 2693.28
ABRAZ. 250 mm
SUMIN. E INSTALAC. ACCESORIOS VALVULA DE AIRE
1.7.9 und 1 610.06 610.06
ABRAZ. 200 mm
SUMIN. E INSTALAC. ACCESORIOS VALVULA DE AIRE
1.7.10 und 2 382.4 764.8
ABRAZ. 160 mm
SUMIN. E INSTALAC. ACCESORIOS VALVULA DE AIRE
1.7.11 und 3 202.48 607.44
ABRAZ. 110 mm
SUMINISTRO E INSTALACION TAPA METALICA VALVULA
1.7.12 und 9 104.47 940.23
DE AIRE
CAMARAS ROMPEPRESION LINEA LATERAL Y
1.8 15909.38 9.42
SUBLATERAL SECTORES DE RIEGO
1.8.1 CAMARAS ROMPEPRESION TIPO 1 (01 UNIDAD) 4079.39 9.42
1.8.1.1 TRAZO Y REPLANTEO PRELIMINAR m² 2.31 4.08 9.42 9.42
1.8.1.2 EXCAVACION MANUAL EN ROCA SUELTA m³ 2.66 92.07 244.91
1.8.1.3 REFINE , NIVELACION Y COMPACTACION m² 7.36 2.3 16.93
1.8.1.4 ACARREO DE MATERIAL EXCEDENTE m³ 3.45 18.42 63.55
1.8.1.5 ENCOFRADO Y DESENCOFRADO m² 11.6 48.4 561.44
1.8.1.6 ACERO Fy = 4200 KG/CM2 (DOBLADO Y COLOCADO) kg 56.96 5.73 326.38
1.8.1.7 CONCRETO F'C=210 KG/CM2 m³ 1.66 495.72 822.9
1.8.1.8 TARRAJEO CON IMPERMEABILIZANTES E=1.5 CM m² 12.47 55.13 687.47
SUMIN. Y COLOCAC. ACCESORIOS CRP TIPO 1 LINEAS
1.8.1.9 und 1 1113.36 1113.36
LATERAL Y SUBLATERAL SECTORES DE RIEGO
1.8.1.10 SUMINISTRO Y COLOC. TAPA METALICA 0.60x0.60m und 1 233.03 233.03
1.8.2 CAMARAS ROMPEPRESION TIPO 2 (3 UNIDADES) 9699.76
1.8.2.1 TRAZO Y REPLANTEO PRELIMINAR m² 6.93 4.08 28.27
1.8.2.2 EXCAVACION MANUAL EN ROCA SUELTA m³ 6.58 92.07 605.82
1.8.2.3 REFINE , NIVELACION Y COMPACTACION m² 18.24 2.3 41.95
1.8.2.4 ACARREO DE MATERIAL EXCEDENTE m³ 8.56 18.42 157.68
1.8.2.5 ENCOFRADO Y DESENCOFRADO m² 27.84 48.4 1347.46
1.8.2.6 ACERO Fy = 4200 KG/CM2 (DOBLADO Y COLOCADO) kg 164.12 5.73 940.41
1.8.2.7 CONCRETO F'C=210 KG/CM2 m³ 4.47 495.72 2215.87
1.8.2.8 TARRAJEO CON IMPERMEABILIZANTES E=1.5 CM m² 30.45 55.13 1678.71
SUMIN. Y COLOCAC. ACCESORIOS CRP TIPO 2 LINEAS
1.8.2.9 und 3 661.5 1984.5
LATERAL Y SUBLATERAL SECTORES DE RIEGO
1.8.2.10 SUMINISTRO Y COLOC. TAPA METALICA 0.60x0.60m und 3 233.03 699.09
1.8.3 CAMARAS ROMPEPRESION TIPO 3 (1 UNIDAD) 2130.23
1.8.3.1 TRAZO Y REPLANTEO PRELIMINAR m² 1.76 4.08 7.18
1.8.3.2 EXCAVACION MANUAL EN ROCA SUELTA m³ 1.32 92.07 121.53
1.8.3.3 REFINE , NIVELACION Y COMPACTACION m² 4.05 2.3 9.32
1.8.3.4 ACARREO DE MATERIAL EXCEDENTE m³ 1.72 18.42 31.68
1.8.3.5 ENCOFRADO Y DESENCOFRADO m² 5.76 48.4 278.78
1.8.3.6 ACERO Fy = 4200 KG/CM2 (DOBLADO Y COLOCADO) kg 46.81 5.73 268.22
1.8.3.7 CONCRETO F'C=210 KG/CM2 m³ 1.05 495.72 520.51
1.8.3.8 TARRAJEO CON IMPERMEABILIZANTES E=1.5 CM m² 6.48 55.13 357.24
SUMIN. Y COLOCAC. ACCESORIOS CRP TIPO 3 LINEAS
1.8.3.9 und 1 392.66 392.66
LATERALES Y SUBLATERALES SECTORES DE RIEGO

1.8.3.10 SUM. Y COLOCACION TAPA METALICA 0.45x0.45m und 1 143.11 143.11


TUBERIA PRINCIPAL LATERAL Y SUBLATERAL SECTORES
1.9 1507165.29 27555.92 285739.84 541660.02
DE RIEGO
1.9.1 LIMPIEZA Y DESBROCE DE TERRENO MANUAL m² 39936.11 2.76 110223.66 27555.92 82667.75
TRAZO, NIVELACION Y REPLANTEO DE ZANJA DURANTE
1.9.2 m 26624.07 1.75 46592.12 15530.71 31061.41
LA EJECUCION
1.9.3 EXCAVACION MANUAL EN TIERRA COMPACTA m³ 5591.06 46.03 257356.49 121108.94 136247.55
1.9.4 EXCAVACION ROCA SUELTA A MANO m³ 2795.53 62.38 174385.16 66432.44 107952.72
1.9.5 EXCAVACION MANUAL EN ROCA FIJA A MANO m³ 931.84 80.92 75404.49 70018.46
1.9.6 REFINE, NIVELACION DE ZANJA ML 26624.07 0.92 24494.14 24494.14
CAMA DE APOYO PARA TUBERIA CON MATERIAL
1.9.7 ML 26624.07 2.91 77476.04 60259.14
ZARANDEADO.
CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA
1.9.8 m³ 11.09 440.79 4888.36
(P/ANCLAJE)
1.9.9 RELLENO Y COMPACTACION m³ 12113.95 23.06 279347.69
1.9.10 TUBERIA 336627.54 89284.65

1.9.10.1 TUBO PVC ISO 1452 UF 160 mm C-5 c/ANILLO x 6.00 m ML 793.3 31.43 24933.42 24933.42

1.9.10.2 TUBO PVC ISO 1452 UF 160 mm C-7.5 c/ANILLO x 6.00 m ML 739.24 42.83 31661.65 31661.65

1.9.10.3 TUBO PVC ISO 1452 UF 160 mm C-10 c/ANILLO x 6.00 m ML 290.88 54.28 15788.97 15788.97

1.9.10.4 TUBO PVC ISO 1452 UF 110 mm C-5 C/ANILLO x 6.00 m ML 1682.49 20.09 33801.22 16900.61

1.9.10.5 TUBO PVC ISO 1452 UF 110 mm C-7.5 C/ANILLO x 6.00 m ML 906.49 22.09 20024.36

1.9.10.6 TUBO PVC ISO 1452 UF 110 mm C-10 C/ANILLO x 6.00 m ML 634.22 20.09 12741.48

1.9.10.7 TUBO PVC ISO 1452 UF 90 mm C-5 C/ANILLO x 6.00 m ML 3079.77 10.06 30982.49

1.9.10.8 TUBO PVC ISO 1452 UF 90 mm C-7.5 C/ANILLO x 6.00 m ML 2497.14 13.92 34760.19

1.9.10.9 TUBO PVC ISO 1452 UF 90 mm C-10 C/ANILLO x 6.00 m ML 1265.96 17.37 21989.73

1.9.10.10 TUBO PVC ISO 1452 UF 63 mm C-7.5 C/ANILLO x 6.00 m ML 5140.37 7.05 36239.61

1.9.10.11 TUBO PVC ISO 1452 UF 63 mm C-10 C/ANILLO x 6.00 m ML 3868.14 8.74 33807.54

1.9.10.12 TUBO PVC ISO 1452 UF 63 mm C-15 C/ANILLO x 6.00 m ML 206.93 11.98 2479.02

1.9.10.13 TUBERIA PVC SAP DIAM. 1 1/2" C-7.5 ML 2892.92 7.32 21176.17
1.9.10.14 TUBERIA PVC SAP DIAM. 1 1/2" C-10 ML 1872.6 7.14 13370.36
1.9.10.15 TUBERIA PVC SAP DIAM. 1" C-10 ML 753.63 3.81 2871.33
1.9.11 ACCESORIOS 120369.6 22341.95

1.9.11.1 ABRAZADERA PE TIPO COLLARIN DIAMETRO 160 mm A 1" und 11 138.42 1522.62 1522.62

1.9.11.2 ABRAZADERA PE TIPO COLLARIN DIAMETRO 110 mm A 1" und 25 71.05 1776.25

1.9.11.3 ABRAZADERA PE TIPO COLLARIN DIAMETRO 90 mm A 1" und 100 58.01 5801

1.9.11.4 ABRAZADERA PE TIPO COLLARIN DIAMETRO 63 mm A 1" und 165 43.84 7233.6

1.9.11.5 TEE UR DIAM 160 mm C/ANILLO und 22 286.84 6310.48 6310.48


1.9.11.6 TEE UR DIAM 110 mm C/ANILLO und 50 180.39 9019.5 9019.5
1.9.11.7 TEE UR DIAM 90 mm C/A und 75 113.88 8541
1.9.11.8 TEE UR DIAM 63 mm C/ANILLO und 5 76.17 380.85
1.9.11.9 CODO 45º UR DIAM 160 mm C/A und 2 188.1 376.2 376.2
1.9.11.10 CODO 22.5º UR DIAM 160 mm C/A und 11 188.1 2069.1 2069.1
1.9.11.11 CODO 45º UR DIAM. 110 mm C/A und 21 77.09 1618.89
1.9.11.12 CODO 22.5º UR DIAM. 110 mm C/A und 32 77.09 2466.88
1.9.11.13 CODO 90º UR DIAM. 90 mm C/A und 18 48.23 868.14
1.9.11.14 CODO 45º UR DIAM. 90 mm C/A und 92 48.23 4437.16
1.9.11.15 CODO 90º UR DIAM. 63 mm CIA und 40 22.51 900.4
1.9.11.16 CODO 45º UR DIAM. 63 mm CIA und 63 22.51 1418.13
1.9.11.17 CODO PVC SAP DIAM. 1 1/2" X 90° und 97 16.25 1576.25
1.9.11.18 CODO PVC SAP DIAM. 1" X 90° und 18 12.57 226.26
1.9.11.19 REDUCCION UR DIAM. 160 mm x 110 mm C/A und 25 96.43 2410.75 2410.75
1.9.11.20 REDUCCION UR DIAM. 110 mm x 90 mm C/A und 75 42.14 3160.5
1.9.11.21 REDUCCION UR DIAM. 90 mm x 63 mm C/A und 153 35.13 5374.89
REDUCCION PVC DIAM. 63 mm (2") x 1 1/2" TRANSICION
1.9.11.22 und 101 24.77 2501.77
ISO ITINTEC
REDUCCION PVC SP DIAM. 63 mm x 1" TRANSICION ISO
1.9.11.23 und 22 24.33 535.26
ITINTEC
1.9.11.24 REDUCCION UR SP DIAM. 1 1/2" A 1" und 101 10.72 1082.72
1.9.11.25 UNION PVC DIAM. 160 mm ISO C/ANILLOS und 5 126.66 633.3 633.3
1.9.11.26 UNION PVC DIAM. 110 mm (4") ISO C/ANILLOS und 10 56.69 566.9
1.9.11.27 UNION PVC DIAM. 90 mm (3") ISO C/ANILLOS und 18 46.22 831.96
1.9.11.28 UNION PVC DIAM. 63 mm (2") ISO C/ANILLOS und 28 23.9 669.2
1.9.11.29 PRUEBA HIDRAULICA ML 26624.07 1.73 46059.64
VALVULAS LINEAS LATERALES Y SUBLATERALES
1.1 104809.01
SECTORES DE RIEGO
1.10.1 VALVULA DE CONTROL 160 mm (11 UNIDADES) 15661.24
1.10.1.1 TRAZO Y REPLANTEO PRELIMINAR m² 7.04 4.08 28.72
1.10.1.2 EXCAVACION MANUAL m³ 5.63 55.24 311
1.10.1.3 REFINE , NIVELACION Y COMPACTACION m² 28.16 2.3 64.77
1.10.1.4 ACARREO DE MATERIAL EXCEDENTE m³ 7.32 18.42 134.83
1.10.1.5 ENCOFRADO Y DESENCOFRADO m² 46.64 48.4 2257.38
1.10.1.6 CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA m³ 3.85 443.54 1707.63
1.10.1.7 TARRAJEO EN EXTERIORES E INTERIORES m² 58.96 34.68 2044.73

1.10.1.8 SUMINISTRO Y COLOCACION VALVULA F°F° DIAM. 160mm und 11 606.77 6674.47

SUMIN. Y COLOCACION TAPA METALICA VALVULA FºFº


1.10.1.9 und 11 221.61 2437.71
DIAM. 160 mm
1.10.2 VALVULA DE CONTROL 110 mm (29 UND) 32364.1
1.10.2.1 TRAZO Y REPLANTEO PRELIMINAR m² 16.31 4.08 66.54
1.10.2.2 EXCAVACION MANUAL m³ 13.05 55.24 720.88
1.10.2.3 REFINE , NIVELACION Y COMPACTACION m² 69.6 2.3 160.08
1.10.2.4 ACARREO DE MATERIAL EXCEDENTE m³ 16.97 18.42 312.59
1.10.2.5 ENCOFRADO Y DESENCOFRADO m² 114.26 48.4 5530.18
1.10.2.6 CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA m³ 9.1 443.54 4036.21
1.10.2.7 TARRAJEO EN EXTERIORES E INTERIORES m² 144.42 34.68 5008.49
SUMINISTRO Y COLOCACION VALVULA DE FºFº DIAM. 110
1.10.2.8 und 29 400.3 11608.7
mm
SUMIN. Y COLOCACION. TAPA METALICA VALVULA FºFº
1.10.2.9 und 29 169.67 4920.43
DIAM. 110 mm
1.10.3 VALVULAS CONTROL 90 mm (31 UND) 30306.83
1.10.3.1 TRAZO Y REPLANTEO PRELIMINAR m² 15.19 4.08 61.98
1.10.3.2 EXCAVACION MANUAL m³ 12.15 55.24 671.17
1.10.3.3 REFINE , NIVELACION Y COMPACTACION m² 69.44 2.3 159.71
1.10.3.4 ACARREO DE MATERIAL EXCEDENTE m³ 15.8 18.42 291.04
1.10.3.5 ENCOFRADO Y DESENCOFRADO m² 112.84 48.4 5461.46
1.10.3.6 CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA m³ 8.66 443.54 3841.06
1.10.3.7 TARRAJEO EN EXTERIORES E INTERIORES m² 142.6 34.68 4945.37

1.10.3.8 SUMINISTRO Y COLOCACION VALVULA F°F° DIAM. 90mm und 31 330.2 10236.2

SUMIN. Y COLOCAC. TAPA METALICA VALVULA Fº Fº 90


1.10.3.9 und 31 149.64 4638.84
mm
1.10.4 VALVULA COMPUERTA DE PURGA 2" (41 UND) 26476.84
1.10.4.1 TRAZO Y REPLANTEO PRELIMINAR m² 14.76 4.08 60.22
1.10.4.2 EXCAVACION MANUAL m³ 10.33 55.24 570.63
1.10.4.3 REFINE , NIVELACION Y COMPACTACION m² 68.88 2.3 158.42
1.10.4.4 ACARREO DE MATERIAL EXCEDENTE m³ 13.43 18.42 247.38
1.10.4.5 ENCOFRADO Y DESENCOFRADO m² 108.24 48.4 5238.82
1.10.4.6 CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA m³ 8.04 443.54 3566.06
1.10.4.7 TARRAJEO EN EXTERIORES E INTERIORES m² 141.04 34.68 4891.27
SUMINISTRO Y COLOCACION VALVULA COMPUERTA DE
1.10.4.8 und 41 194.18 7961.38
2"
SUM. Y COLOCACION TAPA METALICA 0.45 m x0.45m
1.10.4.9 und 41 92.26 3782.66
VALVULA
1.11 CANOAS (02 UND) 8984.46 8984.46
1.11.1 TRAZO Y REPLANTEO PRELIMINAR m² 37.58 4.08 153.33 153.33
1.11.2 REFINE , NIVELACION Y COMPACTACION m² 20 2.3 46 46
1.11.3 ENCOFRADO Y DESENCOFRADO m² 20 48.4 968 968
1.11.4 CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA m³ 3 443.54 1330.62 1330.62
MAMPOSTERIA DE PIEDRA Y EMBOQUILLADO DE
1.11.5 m³ 22.58 239.39 5405.43 5405.43
CEMENTO
1.11.6 ACERO Fy = 4200 KG/CM2 (DOBLADO Y COLOCADO) kg 90.8 5.73 520.28 520.28

1.11.7 TARRAJEO EN EXTERIORES MEZCLA CEMENTO ARENA m² 20 28.04 560.8 560.8

1.12 HIDRANTES MARGEN IZQIUIERDA (421 UND) 108122.97


1.12.1 TRAZO Y REPLANTEO PRELIMINAR m² 54.56 4.08 222.6
1.12.2 EXCAVACION MANUAL m³ 21.82 55.24 1205.34
1.12.3 REFINE , NIVELACION Y COMPACTACION m² 242.5 2.3 557.75
1.12.4 ENCOFRADO Y DESENCOFRADO m² 293.02 48.4 14182.17
1.12.5 CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA m³ 15.71 443.54 6968.01
1.12.6 TARRAJEO EN EXTERIORES E INTERIORES m² 171.77 34.68 5956.98
1.12.7 SUMINISTRO ACCESORIOS HIDRANTE 1 und 421 102.56 43177.76

1.12.8 SUMINISTRO E INSTALACION TAPA METALICA 30 X 30 cm und 421 85.16 35852.36

1.13 VALVULAS DE AIRE (71 und) 29010.94


1.13.1 TRAZO Y REPLANTEO PRELIMINAR m² 8.03 4.08 32.76
1.13.2 EXCAVACION MANUAL m³ 2.97 55.24 164.06
1.13.3 REFINE , NIVELACION Y COMPACTACION m² 40.98 2.3 94.25
1.13.4 ACARREO DE MATERIAL EXCEDENTE m³ 3.86 18.42 71.1
1.13.5 ENCOFRADO Y DESENCOFRADO m² 62.28 48.4 3014.35
1.13.6 CONCRETO F'C=175 KG/CM2-SIN MEZCLADORA m³ 2.17 443.54 962.48
1.13.7 TARRAJEO EN EXTERIORES E INTERIORES m² 46.01 34.68 1595.63
SUMIN. E INSTALAC. ACCESORIOS VALVULA DE AIRE
1.13.8 und 11 382.4 4206.4
ABRAZ. 160 mm
SUMIN. E INSTALAC. ACCESORIOS VALVULA DE AIRE
1.13.9 und 29 202.48 5871.92
ABRAZ. 110 mm
SUMIN. E INSTALAC. ACCESORIOS VALVULA DE AIRE
1.13.10 und 31 180.02 5580.62
ABRAZ. 90 mm
SUMINISTRO E INSTALACION TAPA METALICA VALVULA
1.13.11 und 71 104.47 7417.37
DE AIRE
1.14 ACCIONES DE MITIGACION 36938.56 2773.41 2716.01 2651.98 2468.61

1.14.1 ZONA DE EXTRACCION DE MATERIAL DE CONSTRUCCION 5797.65 2716.01 2651.98 429.66

NIVELACION DE MATERIAL GRUESO DESECHADO


1.14.1.1 m² 150 31.49 4723.5 2716.01 2007.49
(BOCATOMA)
1.14.1.2 ACONDICONAMIENTO DE AREA Y LIMPIEZA m³ 35 30.69 1074.15 644.49 429.66
1.14.2 CONTAMINACION ATMOSFERICA 2038.95 2038.95

1.14.2.1 REMOCION DE AREAS OCUPADAS POR EL CAMPAMENTO m² 35 30.69 1074.15 1074.15

LIMPIEZA DE MATERIALES SOBRANTES, DESECHOS


1.14.2.2 m² 120 8.04 964.8 964.8
SOLIDOS Y ENVASES DE PRODUCTOS QUIMICOS
1.14.3 EROSION DE SUELOS 12212.4
ACONDICIONAMIENTO DE AREA Y LIMPIEZA DE AREA
1.14.3.1 m³ 120 27.62 3314.4
CIRCUNDANTE
REPOSICION DE PLANTACIONES DE CAFE EN
1.14.3.2 und 150 59.32 8898
PRODUCCION
1.14.4 DERRUMBES Y DESLIZAMIENTOS 11507.5
1.14.4.1 PEINADO DE TALUDES m³ 250 46.03 11507.5
1.14.5 CONTROL DE CARCAVAS 2608.65

1.14.5.1 CAUCE DE DESFOGUE DE QUEBRADAS 2 UNIDADES m³ 85 30.69 2608.65

1.14.6 CONSTRUCCION DE LETRINAS 2773.41 2773.41


CONSTRUCCION DE LETRINAS (02 LETRINAS EN CADA
1.14.6.1 und 3 924.47 2773.41 2773.41
CAMPAMENTO)
1.16 TRABAJOS COMPLEMENTARIOS 293073.54
1.16.1 MURO DE CONTENCION (220 m) 293073.54
1.16.1.1 LIMPIEZA MANUAL DE TERRENO m² 220 2.76 607.2
1.16.1.2 TRAZO, NIVELACION Y REPLANTEO m² 220 5.44 1196.8
1.16.1.3 EXCAVACION ROCA SUELTA A MANO m³ 375 62.38 23392.5
1.16.1.4 EXCAVACION MANUAL EN TRAMO ROCOSO m³ 75 269.45 20208.75
1.16.1.5 REFINE , NIVELACION Y COMPACTACION m² 930 2.3 2139
1.16.1.6 ACARREO DE MATERIAL EXCEDENTE m³ 375 18.42 6907.5
1.16.1.7 ENCOFRADO Y DESENCOFRADO m² 900 48.4 43560
1.16.1.8 ACOPIO DE PIEDRAS m³ 220 276.2 60764
MAMPOSTERIA DE PIEDRA Y EMBOQUILLADO DE
1.16.1.9 m³ 561 239.39 134297.79
CEMENTO

1.17 GASTOS DE MITIGACION DE CONSERVACION DE CUENCA 67000

GASTOS DE MITIGACION DE CONSERVACION Y


1.17.1 glb 1 67000 67000
PREVENCION DE CUENCA
1.18 P`LAN DE DESARROLLO AGRICOLA 150000 16363.64 18409.09 17727.27 17727.27
1.18.1 PLAN DE DESARROLLO AGRICOLA glb 1 150000 150000 16363.64 18409.09 17727.27 17727.27
1.15 PLAN DE SEGURIDAD 69531.44 18362.44 13257.5 13257.5 4109
ELABORACION, IMPLEMENTACION Y ADMINISTRACION
1.15.1 glb 1 5000 5000 5000
DEL PLAN DE SEGURIDAD
1.15.1.1 EQUIPOS DE PROTECCION INDIVIDUAL und 3 4978.5 14935.5 4978.5 4978.5 4978.5
IMPLEMENTACION DEL PLAN DE PREVENCION Y
1.15.2 und 9 3751 33759 3751 3751 3751 3751
VIGILANCIA FRENTE AL COVID
EQUIPOS DE PROTECCION PERSONAL DE
1.15.2.1 und 3 4170 12510 4170 4170 4170
BIOSEGURIDAD CONTRA EL COVID-19
CAPACITACION EN SEGURIDAD Y SALUD EN EL TRABAJO
1.15.2.2 und 9 305 2745 305 305 305 305
- VIGILANCIA, PREVENCION Y CONTROL COVID-19
SEÑALIZACION DE FRENTES DE TRABAJO Y PREVENCION
1.15.2.3 und 1 104.94 104.94 104.94
COVID-19
MANEJO DE RESIDUOS SANITARIOS - PREVENCION
1.15.2.4 mes 9 53 477 53 53 53 53
COVID-19

1.15.2.5 PLAN DE MANEJO AMBIENTAL 115082.42 9021.85 17021.85 26126.82 17110.39


PROGRAMA DE PREVENCIÓN, CONTROL Y/O
1.15.2.6 26783.01 2975.89 2975.89 2975.89 2975.89
MITIGACIÓN AMBIENTAL
MEDIDAS DE PREVENCIÓN, MITIGACIÓN I/O
1.15.2.7 und 9 717.28 6455.52 717.28 717.28 717.28 717.28
CORRECCIÓN DE LA CALIDAD DEL AIRE
MEDIDAS DE PREVENCIÓN, MITIGACIÓN I/O CORRECCIÓN
und 9 239.4 2154.6 239.4 239.4 239.4 239.4
DE LA CALIDAD DEL SUELO
MEDIDAS DE PREVENCION, MITIGACION Y/O
und 9 482.8 4345.2 482.8 482.8 482.8 482.8
CORRECCION DE LA CALIDAD DEL AGUA
MEDIDAS DE PREVENCION, MITIGACION Y/O
und 9 992.34 8931.06 992.34 992.34 992.34 992.34
CORRECCION DE FLORA Y FAUNA LOCAL
MEDIDAS DE PREVENCIÓN DE LA CALIDAD
und 9 544.07 4896.63 544.07 544.07 544.07 544.07
VISUAL DEL PAISAJE
MEDIDAS PARA EL MANEJO DE RESIDUOS SOLIDOS Y
17884.86 2611.46 2611.46 2611.46
EFLUENTES
MEDIDAS PARA LA DISPOSICION FINAL DE RESIDUOS
glb 1 10050.48 10050.48
SOLIDOS
MEDIDAS PARA EL MANEJO DE RESIDUOS
ser 3 2611.46 7834.38 2611.46 2611.46 2611.46
SÓLIDOS

MEDIDAS DE CONTINGENCIAS 8079.47 8079.47

ACCIONES DE CONTINGENCIA ANTE SISMOS O


und 1 725 725 725
TERREMOTOS
ACCIONES DE CONTINGENCIA ANTE
und 1 3150 3150 3150
ACCIDENTES LABORALES
ACCIONES DE CONTINGENCIA ANTE
OCURRENCIA DE DERRAMES (COMBUSTIBLES, und 1 1025 1025 1025
LUBRICANTES Y/O ELEMENTOS NOCIVOS)
ACCIONES DE CONTINGENCIA ANTE HUAYCOS
und 1 734.47 734.47 734.47
O DESLIZAMIENTOS
EQUIPAMIENTO BÁSICO INDIVIDUAL Y
und 1 2445 2445 2445
COLECTIVO REQUERIDO PARA LA ATENCIÓN

MEDIDAS DE RELACIONES COMUNITARIAS 12457.5 1934.5 1934.5 1934.5 1109

MEDIDAS DE RELACIONES COMUNITARIAS und 9 1109 9981 1109 1109 1109 1109

CAPACITACION EN CONSERVACION, USO RACIONAL DE


ser 3 825.5 2476.5 825.5 825.5 825.5
AGUA, MANEJO DE RESIDUOS SOLIDOS

PLAN DE PARTICIPACION CIUDADANA 3076.5 1025.5 1025.5

MEDIDAS PARA LA PARTICIPACIÓN CIUDADANA und 3 1025.5 3076.5 1025.5 1025.5

PROGRAMA DE CIERRE 701.08

DESMANTELAMIENTO, LIMPIEZA Y REVEGETACIÓN DE


und ### 1 701.08 701.08
INSTALACIONES AUXILIARES
PROGRAMA DE SEGUIMIENTO Y CONTROL 46100 1500 9500 9500 12000

MONITOREO DE CALIDAD DEL SUELO ser 3 1500 4500 1500 1500 1500

MONITOREO DE LA CALIDAD DEL AIRE ser 3 8000 24000 8000 8000 8000

MONITOREO DE CALIDAD DE AGUA ser 2 4000 8000 4000

MONITOREO DE RUIDO Y VIBRACIONES ser 3 3200 9600

Costo directo: 3889129.42 731855.79 725781.32 380346.46 598861.35


Gastos Admin. Directa (0.00%) 0 - - - -
Parcial 3889129.42 731855.79 725781.32 380346 598861.35
TOTAL 3889129.42 731855.79 725781.32 380346 598861.35
Porcentaje de avance por Mes 18.82% 18.66% 9.78% 15.40%
Porcentaje de avance acumulado 18.82% 37.48% 47.26% 62.66%
YECTO

Mes 5 Mes 6 Mes 7 Mes 8 Mes 9


Del 01/06/2021 Del 01/07/2021 Del 01/08/2021 Del 01/09/2021 Del 01/10/2021
Al 30/06/2021 Al 31/07/2021 Al 31/08/2021 Al 30/09/2021 Al 31/10/2021

355350.98 418370.72 285441.08 257434.57 135687.15


3340.6
3340.6

74.57
16.56
32.42
572.09
416.93
518.12

1200.9

509.01

6370.18

4.16
20.99
11.94
9.03
381.88
124.19
202.18

2693.28
610.06

764.8

607.44

940.23

2311.1 13588.86

2311.1 1758.87

244.91
16.93
63.55
561.44
326.38
822.9
274.99 412.48

1113.36

233.03
9699.76
28.27
605.82
41.95
157.68
1347.46
940.41
2215.87
1678.71

1984.5

699.09
2130.23
7.18
121.53
9.32
31.68
278.78
268.22
520.51
357.24
392.66

143.11

309217.77 342991.75

5386.03

17216.9

4888.36

279347.69
236449.34 10893.55

16900.61

20024.36

12741.48

30982.49

34760.19

21989.73

36239.61

33807.54

2479.02

21176.17
5348.14 8022.22
2871.33
50165.5 47862.15

1776.25

5801

7233.6

8541
380.85

1618.89
2466.88
868.14
4437.16
900.4
1418.13
1576.25
226.26

3160.5
5374.89

2501.77

535.26

1082.72

566.9
831.96
669.2
46059.64

2275.77 13520.4 17596.39 71416.45

2275.77 12572.9 812.57


28.72
311
64.77
134.83
1736.45 520.93
1707.63
2044.73

6674.47

1625.14 812.57

947.5 13551.87 17864.73


66.54
720.88
160.08
312.59
5530.18
4036.21
3672.89 1335.6

11608.7

4920.43

3231.95 27074.88
61.98
671.17
159.71
291.04
2048.05 3413.41
3841.06
4945.37

10236.2

4638.84

26476.84
60.22
570.63
158.42
247.38
5238.82
3566.06
4891.27

7961.38

3782.66
222.6 19745.99 88154.38
222.6
1205.34
557.75
14182.17
3800.73 3167.28
5956.98
43177.76

35852.36

2042.82 21833.02 5135.1


32.76
164.06
94.25
47.4 23.7
1291.86 1722.49
412.49 549.99
1595.63

4206.4

5871.92

5580.62

2282.27 5135.1

2282.57 326.08 3314.4 20405.5

3314.4 8898
3314.4

8898

11507.5
11507.5
2282.57 326.08

2282.57 326.08

25196.5 202975.57 64901.47


25196.5 202975.57 64901.47
607.2
1196.8
23392.5
20208.75
2139
6907.5
10890 32670
60764

102066.32 32231.47

67000

67000

17727.27 18409.09 17727.27 17727.27 8181.82


17727.27 18409.09 17727.27 17727.27 8181.82
4109 4109 4109 4109 4109

3751 3751 3751 3751 3751

305 305 305 305 305

53 53 53 53 53

12310.39 7284.89 7284.89 4084.89 14836.45


2975.89 2975.89 2975.89 2975.89 2975.89

717.28 717.28 717.28 717.28 717.28

239.4 239.4 239.4 239.4 239.4

482.8 482.8 482.8 482.8 482.8

992.34 992.34 992.34 992.34 992.34

544.07 544.07 544.07 544.07 544.07

10050.48

10050.48

1109 1109 1109 1109 1109

1109 1109 1109 1109 1109

1025.5

1025.5

701.08

701.08
7200 3200 3200 0 0

4000

3200 3200 3200

355350.98 418370.72 285441.08 257434.57 135687.15


- - - - -
355350.98 418370.72 285441.08 257434.57 135687.15
355350.98 418370.72 285441.08 257434.57 135687.15
9.14% 10.76% 7.34% 6.62% 3.49%
71.79% 82.55% 89.89% 96.51% 100.00%