Professional Documents
Culture Documents
CHECKLIST
1 Name of boats drilled: 1 Abandon V Waterborne
2 Time elapsed from ready to lower position: 1 min
3 Condition of boat davits / lifting winches: In Working Condition
4 Condition of boat falls: Satisfactory
Date of renewal: Oct. 2006 Date returned: Jan. 2009
a Condition of structure of various parts of the life boats. Satisfactory
5. Inspection of Boat