TPT Ciwarulang
TPT Ciwarulang
B PEKERJAAN PELAKSANAAN
a PEKERJAAN TANAH 445.500,00 445.500,00
Galian Tanah m3 6,60 6,60 67.500,00 445.500,00 445.500,00
AK-SNI 2008 1,000 Membuat Papan Nama Proyek 80x120 cm (bahan flexi) 506.100,00
0,040 m3 Papan kayu 3/20 Kelas III 72.000,00
1,000 m2 Print outdoor flexi 40.000,00
0,600 kg Paku Biasa 18.000,00
16,800 kg Semen Portland 50 KG 27.336,96
0,030 m3 Pasir beton 5.424,00
0,040 m3 Kerikil 11.000,00
0,020 oh Tukang 2.400,00
1,000 oh Tukang 120.000,00
1,000 oh Tukang 120.000,00
1,000 oh Pekerja 90.000,00
0,100 oh Mandor
Ls-002 1,000 Bh Pasang Prasasti 524.900,00
0,700 OH Pekerja 63.000,00
0,350 OH Tukang 42.000,00
0,035 OH Kepala tukang
0,035 OH Mandor
1,000 Bh Batu Prasasti 395.500,00
10,000 Kg Semen Portland 50 KG 16.272,00
0,045 M3 Pasir Pasang 8.136,00
PERHITUNGAN VOLUME
AutoCad/
no uraian sat Panjang Lebar Tinggi Berat UNIT AREA Diameter JUMLAH KET
Jml
a b c d e f g h i j k l m n
PEKERJAAN PERSIAPAN
Papan Nama Kegiatan ls 1,00 1,00
Prasasti ls 1,00 1,00
Pembersihan Lokasi m2 55 1,00 55,00 55,00
Pekerjaan Bouwplank m1 55 55,00 55,00
Pengadaan Air Kerja hr 8,67 9,00
PEKERJAAN PELAKSANAAN
PEKERJAAN TANAH
Galian Tanah m3 6,60 6,60
Urugan Tanah m3 1,65 1,70
PEKERJAAN PASANGAN
Pek. Pas. Batu Kali 1:5 m3 25,85 25,90
Pek. Pipa Suling-suling m1 19,00 19,00
Pek. Plesteran 1:5 m2 22,00 22,00
Pek. Acian m2 22,00 22,00
Pek. Siar m2 55,00 55,00