You are on page 1of 2

Tools you need: Precautions: : M D S - 6 0 Metal detector kit instructions

①Iron (30W) ④T w e e z e r s
②Solder wire ①Check part values & quantities against part list
③Multimeter ⑤Wire cutters ②Always meter resistor values before soldering Rev. 1. 0 O c t o b e r 1 7 , 2 0 1 7 Produced by YiQi
③Understand all part polarities and orientations
1 . Install RES: 2 . Install CAP:C1.C4=104pF .C2.C3=222pF. 3 . Install Triode: Warning
R1=200KR.R2=2K.R3=470R C5=100uF.Notice that the positive electrode
of electrolytic capacitor can not be reversed Q1=S9018. Q2.Q3=S9012. Light-emitting diode and electrolytic capacitor
the longer pin is the anode it should be installed
on the rectangle pad of PCB

MDS-60 Metal detector component list

NO.
物料清单:Name Parameter QTY
4 . Install ADJ-RES: 5 . Ins tal l LED :Pay at tent ion to the di rec tion 6 . Install Power switch:Pay attention to R3 RES 470R 1
VR1=100R. of LED The long foot is the pos itive pol e . the installation direction ofthe switch R2 RES 2K 1
R1 RES 200K 1
VR1 ADJ-RES 100R 1
C2.C3 CAP 222P 2
C1.C4 CAP 104P 2
C5 E-CAP 100UF 1
LED1 LED 5mm Red 1
Q2.Q3 Triode S9012 2
Q1 Triode S9018 1
SW1 Power SW 6P 6*5 1
SP1 Buzzer 9*12 1
7 . Install Buzzer: 8 . Install batter y terminals 9 . Battery box wiring: J1 Power-Socket KF301-2 1
Pay attention to installation direction Connect the red line and black line of the
—— PCB MDS-60 1
purchased battery box to the terminal
Choose Battery box AA1.5V*3 1
The red line is
positive, and Test:The machine is powered by 3 to 5V direct current and
the black line connected to the power supply,Turn on the power switch,
is negative
LED bright, adjust potentiometer make LED not bright,
potentiometer affect detection distance, the machine
detection distance is less than 6 centimeters,detect object
size and environmental impact detection distance
Page 1
1 2 3 4 5 6

D D
J1 SW1 VCC
L1 L2
1
2 SW1 C1
104 Q3
DC3-5V R1 C3 9012
200K 222 1
C4
2
C2 104
C C
222
SP1
Q1 Q2 SPEAKER
LED1
9018 9012
LED

2
VR1
3 1K R2 C5
2K 100UF
B R3 B
470R
1

Title

Size Number Revision


B
A Date: 17-Oct-2017 Sheet of A
File: E:\longyong.ddb Drawn By:
1 2 3 4 5 6

Page 2

You might also like