Professional Documents
Culture Documents
CONSTRUCTIONS
A. Applicability
(i) Existence of service lines and utilities (ii) In the proximity of existing structures, buildings,
foundations, installations like gas, electrical service stations etc. (iii) in case of green field for
excavation beyond 1.5m (iv) any other conditions which may result in serious hazardous
consequences.
Site/Office :
Sub-Contractor Details (If any) :
Date :
S.
N Description Yes No N/A
o
Have utility companies been notified of proposed excavation
1
work?
Are all tools, equipment, and shoring materials readily available
2
prior to job start up?
Are overhead utility lines noted and precautions taken to avoid
3
contact with the equipment?
Is the soil pile at least two meter from the edge of the
4
excavation?
Is the excavation inspected regularly or more frequently when
5
climate conditions could affect the soil?
6 Are barricades, stop logs, properly placed?
Are excavations 1.5m or deeper correctly sloped, benched,
7
shored?
Is a step or other means of egress provided in excavations
8
deeper than1.5 m?
Are shoring and shielding systems inspected visually daily by a
9
competent person?
10 Is there any object liable to fall in the excavation?
Other Observations