Clearance for Excavation (to be issued along with Hot work for Excavation Job)
Date & Time :
A. (i) Name of the Installation : (ii) Name of Installation Manager : (iii) Name of the supervisor of Contractor : (iv) Name of supervisor of OIL : B. Details of excavation: Length…………………………..M, Applicable/NA Yes/No Sl No Date Width……………………………M, Hot work Depth……………………………M Applicable Permit Mode of excavation: Mechanized/Manual Electrical No. of workers engaged………………No. Permit (if issued) C. Checklist for clearance Sl Description Yes No Not Applicable Remarks no. 1 Stability of the ground 2 Provision for at least two entries and exit with escape ladder beyond 1.5m 3 Adequate PPEs provided to all workmen 4 Provision for suitable shoring (A beam or timber that is propped against a structure to provide support) and strutting ( Brace consisting of a bar or rod used to resist longitudinal compression) 5 Whether soil heaps are away from the edge at least 2mtr or half of the depth whichever is more 6 Whether arrangement is made for vehicles not to operate the close to excavation area (maintain at least 2 mtrs distance) 7 Whether slop is maintained not less than 1:1 and suitable bench of 0.5 mtrs width at every 1.5 mtr depth 8 Sufficient lighting in the night 9 Provision for dewatering arrangement 10 Provision for guard rails/ barricade with warning signal 11 Whether the excavation will not affect adjoining buildings, structures or roadways 12 Whether Gas ,water, electrical and other public utilities are shut off or disconnected, if necessary 13 The position of culvert/bridges, temporary roads and spoil heaps 14 Presence of underground pipes, cable conductors, etc. 1. Underground Power Cable 2. Underground Telecommunication Cable 3. Underground Firewater Line 4. Underground Oil/Sewer Line, Drinking water line, Above ground Open drain 5. Underground Computer Cable 6.Underground Product Line, Utility Line 7. Underground Instrument Cable 8. Underground Cathodic Protection Cable Note: The above clearance is not exhaustive and may be reviewed as and when required Joint Site Visit for Excavation clearance Date :
Location :
Sl. Department Name & Designation Remarks Signature