TECHNICAL SITE SURVEY REPORT
Table of Contents
NEW SITE
GENERAL INFORMATION
SURVEY TEAM
Longitude: 125.056599
Latitude: 6.858958
IMD 1032 NP
230m
IMD 1011 NP
IMD 1032 A 73m
IMD 1011 A
MAIN ROAD
Right of Way
(5m wide)
PROPOSEDRIGHT
SITE OF WAY
IMD 1032 A (5m wide)
Elev.: +0.5m
Owned by Lessor
N/A
30
N/A N/A
15 20
C2. If the site is Rolling or Mountains, does it require?
C3. Is the site located in one of the following conditions?
TECHNICAL SITE SURVEY REPORT
N/A N/A
E. Accessibility to Site
Width= 9 Concrete
Width= 6 Concrete
Width= 5 Dirt road
Greenfield Site:
Secondary Power Line
Length of tapping point from (Service Entrance to existing electrical pole) ________20_______m
(From existing pole to existing transformer) _______ 0________m
Primary Power Line
Distance of primary line (from existing transformer to primary line) _______N/A________m
Estimated no. of poles at ___30_____m pole to pole _______0______pc
Commercial AC to power supplied by Electric Company/Cooperative ________N/A_________
TECHNICAL SITE SURVEY REPORT
Rooftop Sites:
N/A
Negotiate with Building owner the proposed location where to drive ground rod and test pit. N/A
Discuss with the Building owner the possible grounding and cable route and get approval N/A
N/A N/A
Discuss with building owner the possible earthing cable route and get approval N/A
Check the tapping point and the terminal lug to be used N/A
Check if there are obstructions along the proposed cable route N/A
N/A
N/A
Discuss with building owner the possible earthing cable route and get approval (N/A)
Check the tapping point and the terminal lug to be used (N/A)
F. Commercial
Check Power
if there are availability
obstructions along the proposed cable route (No Obstruction)
TECHNICAL SITE SURVEY REPORT
_there is no flood history in the area_ (with respect to road/ right of way)
K. Lot elevation from fronting road (approx.) (+) ____0.5__ m / (-) ________ m
L. Soil condition Report (to be secured from engineering office, if not available subsoil exploration
to be conducted as may require by client)
N. Existing Ordinance
TECHNICAL SITE SURVEY REPORT
O. Peace and Order Situation, History: _The area are generally peaceful and orderly.
______________________________________________________________________________
TECHNICAL SITE SURVEY REPORT
_______________________________________________________________________________
P. Mode
SITE of Transportation going to proposed site, in detail (starting from main road/town)
LAYOUT
The main road and right of way are wide enough for any vehicle to enter the proposed site. ____
PROPOSED SITE
IMD 1032 A
Q. Variation Works: _Removal of grasses and loose topsoil._____ (15m x 20m)
Elev.: +0.5m
_______________________________________________________________________________
R. Remarks and Narrative Report: _The proposed site is located near the main road and it is
H
E
R
E
R
O
W PROPOSED ENTRANCE
PROPOSED LOCATION
H
E
R
E
ROAD ACCESS – BARANGAY ROAD (5m wide)
THIS WAY
0˚
30˚
60˚ 90˚
120˚ 150˚
180˚ 210˚
270˚
240˚ TECHNICAL SITE SURVEY REPORT
COVERAGE OBJECTIVES
SECTOR 1 - 280˚
300˚
330˚
SECTOR 2 - 130˚
TECHNICAL SITE SURVEY REPORT
COVERAGE OBJECTIVES
SECTOR 3 - 280˚
TECHNICAL SITE SURVEY REPORT
PRIMARY LINE
20m
IMD 1032 A
20m
AREA = 300m²
15m