RFX# 2122200123
PARKING AREA WITH ROAD BASE FOR 450 PARKINGS AT ‘C’ STATION- SATWA
Pre Tender Clarification # 1
Please find below clarification in Question - Answer form, in response to queries raised by tenderers.
3. As per provided tender Specification Documents Kerbstone of size 900x250x100 all around the
, Page no: SPEC-1 , Clause 1 , Scope of Works , proposed area may be considered. Successful tenderer
Item: g- Fixing of Edge Kerbstone , Please provide shall submit the material and fixing details for approval.
the details for required Kerbstone Like Location
and Specification.
4. Please confirm, while making the formation level Shifting of sand is not required. However, construction
if any excess sand arising that will be dump in debris/waste, if any, shall be dumped at the designated
adjacent side inside the same plot and will not be Dubai Municipality dump yard.
shifted to Other Dumping yard.
Sl. Query Answer
No
5. Please confirm, If sand required to make Usage of sand from adjacent area depends on plot level
formation level for proposed parking, Sand surveying, quantity of sand required and DEWA approval
material can be taken from Adjacent site inside
the same plot.
14 Please Clarify, the edge kerbstones is required for All around the proposed parking area.
parking end curves or as vehicle stopper?
15. Referring to specification 2 (page 86) indicates, Removal of top 20 cm sand layer shall be considered.
Existing sand (20cm) has to be removed from OGL
which is not mentioned in BOQ. Kindly confirm.