You are on page 1of 2

FORM NO.

13
(SEE RULE 65 AND 73-A)
REPORT OF EXAMINATION OF PRESSURE PLANT / VESSEL

REPORT NO.: TS/AOGPSPL/PT/MUM/05-23/002 DATE: 19/05/2023

1. Name of Occupier : M/S. Arham Oil Gas Product Services Pvt Ltd..

2. Situation & Address of Occupier : Girija Compound (Rabale Navi Mumbai )

3. Name, Description & Distinctive Number of Pressure Vessel : 3 inch, SS 304, Hydraulic Hose Pipe - 15 m with Camlock
Coupling set-AR691-15MSS-01 AR691-15MSS-02
Sr. # 02,03

4. Name & Address of Manufacturer : MITHRAJ INDUSTRIES..


5. Nature of Process in which it is used (Including Pressure & : For Flow of Liquid.
Temperature Parameter)

6. Particulars of Vessel or Plants


a) Date of Construction : DATA NOT AVAILABLE
b) Thickness of Wall : DATA NOT AVAILABLE
c) Date on which the Vessel was first taken into use : DATA NOT AVAILABLE
2
d) Safe working Pressure recommended by the Manufacturer : 40 kgf/cm g

7. Date of
a) Last External Examination : DATA NOT AVAILABLE
b) Last Internal Examination : NOT ACCESSIBLE
c) Last Hydraulic Examination : NA
d) Last Ultrasonic or N.D.T. : DATA NOT AVAILABLE

8. Whether Legging was removed for purpose of examination : NOT APPLICABLE

9. Description of examination carried out & findings


a) External Examination(Given reason if is not carried out six month) : External Examination found ok.
b) Internal Examination (Given reason if is not carried out annually) : NOT ACCESSIBLE
2
c) Hydraulic Examination (Given reason if is not carried at an internal of : Hydraulic Test @ 10 kgf/ cm g
2 years)
d) Ultrasonic or other N.D.T. : YES
UTG Report No. NA
VT Report No. TS/AOGPS/VT/MUM/05-23/002- Date 19/05/2023

10. Condition of Pressure Plant


a) Vessel : Normal
b) Piping : Normal

11. Condition of Fittings & Appliances


a) Pressure Gauge : NA
b) Safety Valve : NA
c) Stop Valve : NA
d) Reducing Valve (Give reason if not Necessary) : N.A.
e) Additional Safety Valve (Required in case of reducing Valve Necessary): N.A.
f) Other Devices (Please specify particularly in case of Jacketed Vessels) : N.A.
2
12. Safe working Pressure recommended after examination (Specify the : 40 kgf/cm g
Allowance made for condition of working such as heat, corrosion, etc.)

13. a) Repairs (if any) required :


b) Period within which the repairs should be executed : NIL
c) Any other condition which person making the exam. Thinks it : NIL
necessary for securing safe working.

Cont...2...

st
1 Floor; Landmark; Plot No.: D-2, Sector-12 Kharghar, Navi-Mumbai -410210
Tel: +91-22-27746167/68,32986157 ; Fax: +91-22-27746169 Web: www.tubestar.com
-2-

14. Specify reduced working pressure pending repairs : N.A.

15. Safe working Pressure calculated as per methods given sub-rule 8 : N.A.
For thin walled Pressure Vessel or Plant.

16. Other observation : NIL

I/WE certify that on 19/05/2023, the pressure vessel described above was thoroughly cleaned and (So far as it’s construction permits)
made accessible for through examination & for such test as were necessary for through examination & that on said that i thoroughly
examined this pressure vessel plant included it’s fittings & above is a true report of my examination.

st
1 Floor; Landmark; Plot No.: D-2, Sector-12 Kharghar, Navi-Mumbai -410210
Tel: +91-22-27746167/68,32986157 ; Fax: +91-22-27746169 Web: www.tubestar.com

You might also like