EQUIPMENT EXAMINATION REPORT Equipment Reg. No.

QATAR PETROLEUM - Gas Operations (G) V-2001


INSPECTION DIVISION Page 1

Plant NGL2 STRIPPING UNIT OFFPLOTS


Equip. Description SLUG CATCHER
Type of Exam/Test Thorough Internal & External Visual Examination With Ultrasonic Thickness Tests,
Wet Fluorescent Magnetic Particle Inspection and Time of Flight Diffraction.
Date of . . . . Thorough Exam'n Boxed-Up Last Examination Manufacture
19-Jul-2005 04-Aug-2005 13-Jun-2003 1977
Design Details Design Code / Class Design Press. (Bar G) Design Temp. (Deg. C)
1977: Manufactured By BSSUMITOMO
1515 Pt. 1 HEAVY INDUSTRIES34.6 Japan. 0 to 65
1979 : Epoxy Lining applied. 1980 : Lining blistered. 1981 : Lining blistered - 2.0mm pitting in base.
1982 : Lining blistered.
Brief Equipment History 1983
: : Sub-surface indication 8mm dia & Lining blistered.
1984 : Boot modified & relined using Carboglass. 1986, 88 : Lining blistered. 1989, 92 : In order.
1994 : Relined using Glassflake. 1996 : In order. 1999 : Minor lining repair (mechanical damage).
2001: Internal nozzle inspection with trim removed from 9 nozzles. U/T on N1 nozzle.
2003: Localise internal lining repair. Missing cold insulation and cladding on nozzles from 2001
inspection. Extrenal coating system failing.
2005: Blasted and repainted externally. New insulation and cladding. Blasted and relined internally.
TOFD at selected areas.

Recommendation #1 Job Officer : GPO25 Notif/Order No. Status

Recommendation #2 Job Officer : Notif/Order No. Status

Recommendation #3 Job Officer : Notif/Order No. Status

Recommendation #4 Job Officer : Notif/Order No. Status

Other Recommendations :
EQUIPMENT EXAMINATION REPORT Equipment Reg. No.
QATAR PETROLEUM - Gas Operations (G) V-2001
INSPECTION DIVISION Page 2

Shell Element/Coil Other


Material Specification A516 Gr. 70
Process Fluid Raw NGL Feed Gas
Maximum Permissible Pressure 34.6 Bar.G
Relief Valve Tag / Reg. No. 20-RV-1
Relief Valve Size 3" x 4"
Relief Valve Set Pressure 34.6 Bar.G
Relief Valve Date Last Test 15/07/05
Pressure Gauge Range 0 - 60 Bar
Maximum Source of Pressure
Where No Relief Valve

Pressure Test Last Date 15/02/84


Pressure Test (Bar G) 52.0 Bar.G
Pressure Test Medium Inhib. Water
Pressure Test Period 30 Minutes
Other observations - including details of repairs or conditions necessary to secure safe working
The deterioration mechanisms, identified from the RBI nodes, were considered when determining the
NDT requirement level at this examination. (2d, 4b, 12d, 13d, 14b)

I certify that the above is a true report of my examination/test of the equipment specified.

Competent Inspector TERENCE WRIGHT


Reference Indicator OEI14G
Date 17-Jun-2007

Declaration(s) :
(i) This equipment may be used at a maximum permissible pressure of :

Shell 34.6 Bar.G Element/Coil -- Other - -

Until the next thorough examination Type 5, 21, 25, 36 & 14 Next due on 19-Jul-2009

Subject to the repairs and/or conditions specified above being carried out.
Q.P. Snr. Inspector N. AL- ABDULLA MCI1M Date

Maint. Superintendent Comment Status Date


(Asset Holder) UNSIGNED
GPO2

EQUIPMENT EXAMINATION REPORT Equipment Reg. No.


QATAR PETROLEUM - Gas Operations (G) V-2001
INSPECTION DIVISION Page 3
EQUIPMENT EXAMINATION REPORT Equipment Reg. No.
QATAR PETROLEUM - Gas Operations (G) V-2001
INSPECTION DIVISION Page 4
EQUIPMENT EXAMINATION REPORT Equipment Reg. No.
QATAR PETROLEUM - Gas Operations (G) V-2001
INSPECTION DIVISION Page 5
EQUIPMENT EXAMINATION REPORT Equipment Reg. No.
QATAR PETROLEUM - Gas Operations (G) V-2001
INSPECTION DIVISION Page 6

You might also like