REPORT OF EXAMINATION OF THE


LIFTING MACHINES, ROPES AND LIFTING TACKLES
(Made under section 29 of the Factories Act-1948)
REF : CT-501: CP- :: LT-BGPL-COOCH BEHAR -5: 01/23 Date: 27-02-2023

1. Name of the occupier of the factory/Site : M/S. KALPATARU POWER TRANSMISSION LTD
2. Site Address of the factory : BGPL PROJECT SEC IV, KHATIAN NO 9772
ALIPURDUA ROAD, HARENDRA CHANDRA
VIDYAMANDIR KHAGRABARI COOCH BEHAR
WEST BENGAL 736118

3. Distinguishing number of marks if any and : EXCAVATOR


description sufficient to identify the lifting Capacity : 20 MT, Sl No- SP21-61281
machines, chains, rope or the lifting tackle Make: Tata Hitachi, Eqp Code- EX061
Model: EX210LCS+

4. Date when the lifting machine, chain rope or : Not known


lifting tackle was first used in the factory/site

5. Date of each examination made under sec 29


i) 27-02-2023 : By Creative Technocrats
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked by the undersign
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 25 MT on Bucket
the safe working load and of the steps taken Hydraulic system working properly, No Leakage
to remedy defect Brake and Crawler movement found O.K.

9 Recommendation : The excavator is fit for operation.

It is to certify that on 27-02-2023, this Excavator is thoroughly examined and that


the above is a correct report of the result.
This Certificate is valid up to 26-02-2024. Subject to any physical deformation and alteration

Signature: For Creative Technocrats

E-MAIL : creativetechnocrats.dp@gmail.com: :Ph. No : 9864063054, 9435732022


Renewable Yearly
REPORT OF EXAMINATION OF THE
LIFTING MACHINES, ROPES AND LIFTING TACKLES
(Made under section 29 of the Factories Act-1948)
REF : CT-501: CP- :: LT-BGPL-COOCH BEHAR -6: 01/23 Date: 27-02-2023

1. Name of the occupier of the factory/Site : M/S. KALPATARU POWER TRANSMISSION LTD
2. Site Address of the factory : BGPL PROJECT SEC IV, KHATIAN NO 9772
ALIPURDUA ROAD, HARENDRA CHANDRA
VIDYAMANDIR KHAGRABARI COOCH BEHAR
WEST BENGAL 736118

3. Distinguishing number of marks if any and : EXCAVATOR


description sufficient to identify the lifting Capacity : 20 MT, Sl No- N711081
machines, chains, rope or the lifting tackle Make: Komatsu, Eqp Code- EX034
Model: PC 200LC- 8MO

4. Date when the lifting machine, chain rope or : Not known


lifting tackle was first used in the factory/site

5. Date of each examination made under sec 29


i) 27-02-2023 : By Creative Technocrats
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked by the undersign
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 25 MT on Bucket
the safe working load and of the steps taken Hydraulic system working properly, No Leakage
to remedy defect Brake and Crawler movement found O.K.

9 Recommendation : The excavator is fit for operation.

It is to certify that on 27-02-2023, this Excavator is thoroughly examined and that


the above is a correct report of the result.
This Certificate is valid up to 26-02-2024. Subject to any physical deformation and alteration

Signature: For Creative Technocrats

E-MAIL : creativetechnocrats.dp@gmail.com: :Ph. No : 9864063054, 9435732022


Renewable Yearly
REPORT OF EXAMINATION OF THE
LIFTING MACHINES, ROPES AND LIFTING TACKLES
(Made under section 29 of the Factories Act-1948)
REF : CT-501: CP- :: LT-BGPL-COOCH BEHAR -7: 01/23 Date: 27-02-2023

1. Name of the occupier of the factory/Site : M/S. KALPATARU POWER TRANSMISSION LTD
2. Site Address of the factory : BGPL PROJECT SEC IV, KHATIAN NO 9772
ALIPURDUA ROAD, HARENDRA CHANDRA
VIDYAMANDIR KHAGRABARI COOCH BEHAR
WEST BENGAL 736118

3. Distinguishing number of marks if any and : EXCAVATOR


description sufficient to identify the lifting Capacity : 20 MT, Sl No- YQ12-B4160
machines, chains, rope or the lifting tackle Make: Kobelco, Eqp Code- EX047
Model: SK210HDLC-8

4. Date when the lifting machine, chain rope or : Not known


lifting tackle was first used in the factory/site

5. Date of each examination made under sec 29


i) 27-02-2023 : By Creative Technocrats
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked by the undersign
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 25 MT on Bucket
the safe working load and of the steps taken Hydraulic system working properly, No Leakage
to remedy defect Brake and Crawler movement found O.K.

9 Recommendation : The excavator is fit for operation.

It is to certify that on 27-02-2023, this Excavator is thoroughly examined and that


the above is a correct report of the result.
This Certificate is valid up to 26-02-2024. Subject to any physical deformation and alteration

Signature: For Creative Technocrats

E-MAIL : creativetechnocrats.dp@gmail.com: :Ph. No : 9864063054, 9435732022


Renewable Yearly
REPORT OF EXAMINATION OF THE
LIFTING MACHINES, ROPES AND LIFTING TACKLES
(Made under section 29 of the Factories Act-1948)
REF : CT-501: CP- :: LT-BGPL-COOCH BEHAR -8: 01/23 Date: 27-02-2023

1. Name of the occupier of the factory/Site : M/S. KALPATARU POWER TRANSMISSION LTD
2. Site Address of the factory : BGPL PROJECT SEC IV, KHATIAN NO 9772
ALIPURDUA ROAD, HARENDRA CHANDRA
VIDYAMANDIR KHAGRABARI COOCH BEHAR
WEST BENGAL 736118

3. Distinguishing number of marks if any and : EXCAVATOR


description sufficient to identify the lifting Capacity : 20 MT, Sl No- YQ15-B5526
machines, chains, rope or the lifting tackle Make: Kobelco, Eqp Code- EX056
Model: SK220XDLC-10

4. Date when the lifting machine, chain rope or : Not known


lifting tackle was first used in the factory/site

5. Date of each examination made under sec 29


i) 27-02-2023 : By Creative Technocrats
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked by the undersign
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 25 MT on Bucket
the safe working load and of the steps taken Hydraulic system working properly, No Leakage
to remedy defect Brake and Crawler movement found O.K.

9 Recommendation : The excavator is fit for operation.

It is to certify that on 27-02-2023, this Excavator is thoroughly examined and that


the above is a correct report of the result.
This Certificate is valid up to 26-02-2024. Subject to any physical deformation and alteration

Signature: For Creative Technocrats

E-MAIL : creativetechnocrats.dp@gmail.com: :Ph. No : 9864063054, 9435732022


Renewable Yearly
REPORT OF EXAMINATION OF THE
LIFTING MACHINES, ROPES AND LIFTING TACKLES
(Made under section 29 of the Factories Act-1948)
REF : CT-501: CP- :: LT-BGPL-COOCH BEHAR -9: 01/23 Date: 27-02-2023

1. Name of the occupier of the factory/Site : M/S. KALPATARU POWER TRANSMISSION LTD
2. Site Address of the factory : BGPL PROJECT SEC IV, KHATIAN NO 9772
ALIPURDUA ROAD, HARENDRA CHANDRA
VIDYAMANDIR KHAGRABARI COOCH BEHAR
WEST BENGAL 736118

3. Distinguishing number of marks if any and : EXCAVATOR


description sufficient to identify the lifting Capacity : 20 MT, Sl No- YQ15-B5522
machines, chains, rope or the lifting tackle Make: Kobelco, Eqp Code- EX052
Model: SK220XDLC-10

4. Date when the lifting machine, chain rope or : Not known


lifting tackle was first used in the factory/site

5. Date of each examination made under sec 29


i) 27-02-2023 : By Creative Technocrats
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked by the undersign
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 25 MT on Bucket
the safe working load and of the steps taken Hydraulic system working properly, No Leakage
to remedy defect Brake and Crawler movement found O.K.

9 Recommendation : The excavator is fit for operation.

It is to certify that on 27-02-2023, this Excavator is thoroughly examined and that


the above is a correct report of the result.
This Certificate is valid up to 26-02-2024. Subject to any physical deformation and alteration

Signature: For Creative Technocrats

E-MAIL : creativetechnocrats.dp@gmail.com: :Ph. No : 9864063054, 9435732022


Renewable Yearly
REPORT OF EXAMINATION OF THE
LIFTING MACHINES, ROPES AND LIFTING TACKLES
(Made under section 29 of the Factories Act-1948)
REF : CT-501: CP- :: LT-BGPL-COOCH BEHAR -10: 01/23 Date: 27-02-2023

1. Name of the occupier of the factory/Site : M/S. KALPATARU POWER TRANSMISSION LTD
2. Site Address of the factory : BGPL PROJECT SEC IV, KHATIAN NO 9772
ALIPURDUA ROAD, HARENDRA CHANDRA
VIDYAMANDIR KHAGRABARI COOCH BEHAR
WEST BENGAL 736118

3. Distinguishing number of marks if any and : EXCAVATOR


description sufficient to identify the lifting Capacity : 20 MT, Sl No- YQ12-B4157
machines, chains, rope or the lifting tackle Make: Kobelco, Eqp Code- EX044
Model: SK210HDLC-8

4. Date when the lifting machine, chain rope or : Not known


lifting tackle was first used in the factory/site

5. Date of each examination made under sec 29


i) 27-02-2023 : By Creative Technocrats
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked by the undersign
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 25 MT on Bucket
the safe working load and of the steps taken Hydraulic system working properly, No Leakage
to remedy defect Brake and Crawler movement found O.K.

9 Recommendation : The excavator is fit for operation.

It is to certify that on 27-02-2023, this Excavator is thoroughly examined and that


the above is a correct report of the result.
This Certificate is valid up to 26-02-2024. Subject to any physical deformation and alteration

Signature: For Creative Technocrats

E-MAIL : creativetechnocrats.dp@gmail.com: :Ph. No : 9864063054, 9435732022


Renewable Yearly
REPORT OF EXAMINATION OF THE
LIFTING MACHINES, ROPES AND LIFTING TACKLES
(Made under section 29 of the Factories Act-1948)
REF : CT-501: CP- :: LT-BGPL-COOCH BEHAR -11: 01/23 Date: 27-02-2023

1. Name of the occupier of the factory/Site : M/S. KALPATARU POWER TRANSMISSION LTD
2. Site Address of the factory : BGPL PROJECT SEC IV, KHATIAN NO 9772
ALIPURDUA ROAD, HARENDRA CHANDRA
VIDYAMANDIR KHAGRABARI COOCH BEHAR
WEST BENGAL 736118

3. Distinguishing number of marks if any and : PRESSURE PUMP


description sufficient to identify the lifting Capacity : 250 kg/cm2, Sl No- 21220482
machines, chains, rope or the lifting tackle Make: PRESSURE JET, Eqp Code- PP032
Model: KDC 50

4. Date when the lifting machine, chain rope or : Not known


lifting tackle was first used in the factory/site

5. Date of each examination made under sec 29


i) 27-02-2023 : By Creative Technocrats
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked by the undersign
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 312.5 kg/cm2
the safe working load and of the steps taken
to remedy defect

9 Recommendation : The Pressure Pump is fit for operation.

It is to certify that on 27-02-2023, this Pressure Pump is thoroughly examined and


that the above is a correct report of the result.
This Certificate is valid up to 26-02-2024. Subject to any physical deformation and alteration

Signature: For Creative Technocrats

E-MAIL : creativetechnocrats.dp@gmail.com: :Ph. No : 9864063054, 9435732022


Renewable Yearly
REPORT OF EXAMINATION OF THE
LIFTING MACHINES, ROPES AND LIFTING TACKLES
(Made under section 29 of the Factories Act-1948)
REF : CT-501: CP- :: LT-BGPL-COOCH BEHAR -12: 01/23 Date: 27-02-2023

1. Name of the occupier of the factory/Site : M/S. KALPATARU POWER TRANSMISSION LTD
2. Site Address of the factory : BGPL PROJECT SEC IV, KHATIAN NO 9772
ALIPURDUA ROAD, HARENDRA CHANDRA
VIDYAMANDIR KHAGRABARI COOCH BEHAR
WEST BENGAL 736118

3. Distinguishing number of marks if any and : PRESSURE PUMP


description sufficient to identify the lifting Capacity : 250 kg/cm2, Sl No- 0909268
machines, chains, rope or the lifting tackle Make: PRESSURE JET, Eqp Code- PP008
Model: KD50 350

4. Date when the lifting machine, chain rope or : Not known


lifting tackle was first used in the factory/site

5. Date of each examination made under sec 29


i) 27-02-2023 : By Creative Technocrats
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked by the undersign
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 312.5 kg/cm2
the safe working load and of the steps taken
to remedy defect

9 Recommendation : The Pressure Pump is fit for operation.

It is to certify that on 27-02-2023, this Pressure Pump is thoroughly examined and


that the above is a correct report of the result.
This Certificate is valid up to 26-02-2024. Subject to any physical deformation and alteration

Signature: For Creative Technocrats

E-MAIL : creativetechnocrats.dp@gmail.com: :Ph. No : 9864063054, 9435732022


Renewable Yearly
REPORT OF EXAMINATION OF THE
LIFTING MACHINES, ROPES AND LIFTING TACKLES
(Made under section 29 of the Factories Act-1948)
REF : CT-501: CP- :: LT-BGPL-COOCH BEHAR -13: 01/23 Date: 27-02-2023

1. Name of the occupier of the factory/Site : M/S. KALPATARU POWER TRANSMISSION LTD
2. Site Address of the factory : BGPL PROJECT SEC IV, KHATIAN NO 9772
ALIPURDUA ROAD, HARENDRA CHANDRA
VIDYAMANDIR KHAGRABARI COOCH BEHAR
WEST BENGAL 736118

3. Distinguishing number of marks if any and : PRESSURE PUMP


description sufficient to identify the lifting Capacity : 350 kg/cm2, Sl No- NF
machines, chains, rope or the lifting tackle Make: PRESSURE JET, Eqp Code- 17LPM
Model: P X 17.35IR

4. Date when the lifting machine, chain rope or : Not known


lifting tackle was first used in the factory/site

5. Date of each examination made under sec 29


i) 27-02-2023 : By Creative Technocrats
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked by the undersign
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 437.5 kg/cm2
the safe working load and of the steps taken
to remedy defect

9 Recommendation : The Pressure Pump is fit for operation.

It is to certify that on 27-02-2023, this Pressure Pump is thoroughly examined and


that the above is a correct report of the result.
This Certificate is valid up to 26-02-2024. Subject to any physical deformation and alteration

Signature: For Creative Technocrats

E-MAIL : creativetechnocrats.dp@gmail.com: :Ph. No : 9864063054, 9435732022


Renewable Yearly
REPORT OF EXAMINATION OF THE
LIFTING MACHINES, ROPES AND LIFTING TACKLES
(Made under section 29 of the Factories Act-1948)
REF : CT-501: CP- :: LT-BGPL-COOCH BEHAR -14: 01/23 Date: 27-02-2023

1. Name of the occupier of the factory/Site : M/S. KALPATARU POWER TRANSMISSION LTD
2. Site Address of the factory : BGPL PROJECT SEC IV, KHATIAN NO 9772
ALIPURDUA ROAD, HARENDRA CHANDRA
VIDYAMANDIR KHAGRABARI COOCH BEHAR
WEST BENGAL 736118

3. Distinguishing number of marks if any and : PRESSURE PUMP


description sufficient to identify the lifting Capacity : 250 kg/cm2, Sl No- NF
machines, chains, rope or the lifting tackle Make: PRESSURE JET, Eqp Code- 17LPM
Model: KDC 50

4. Date when the lifting machine, chain rope or : Not known


lifting tackle was first used in the factory/site

5. Date of each examination made under sec 29


i) 27-02-2023 : By Creative Technocrats
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly Checked by the undersign
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate
7. Date of annealing or other heat treatment of : Not required
chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out
8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 312.5 kg/cm2
the safe working load and of the steps taken
to remedy defect

9 Recommendation : The Pressure Pump is fit for operation.

It is to certify that on 27-02-2023, this Pressure Pump is thoroughly examined and


that the above is a correct report of the result.
This Certificate is valid up to 26-02-2024. Subject to any physical deformation and alteration

Signature: For Creative Technocrats

E-MAIL : creativetechnocrats.dp@gmail.com: :Ph. No : 9864063054, 9435732022


Renewable Yearly
REPORT OF EXAMINATION OF THE
LIFTING MACHINES, ROPES AND LIFTING TACKLES
(Made under section 29 of the Factories Act-1948)
REF : CT-501: CP- :: LT-BGPL-COOCH BEHAR -15: 01/23 Date: 27-02-2023

1. Name of the occupier of the factory/Site : M/S. KALPATARU POWER TRANSMISSION LTD
2. Site Address of the factory : BGPL PROJECT SEC IV, KHATIAN NO 9772
ALIPURDUA ROAD, HARENDRA CHANDRA
VIDYAMANDIR KHAGRABARI COOCH BEHAR
WEST BENGAL 736118
3. Distinguishing number of marks if any and : Hydra
description sufficient to identify the lifting Capacity : 14 MT
machines, chains, rope or the lifting tackle Make: Escorts Ltd., Model : HYDRA-14 -49BHP
Load at Hook point : 14T-12T-10T-7.5T-2.0T
Eng no- NF, Chassis No : NF
Registration No- WB 18 AE 7746
Total Extended Boom Length : 10 Mtr
Basic Boom Length : 3 Mtr,
attached Hook capacity 14 MT
4. Date when the lifting machine, chain rope or : Not known
lifting tackle was first used in the factory/site

5. Date of each examination made under sec 29


i) 27-02-2023 : By Creative Technocrats
ii)
and by whom it was carried out
6. Date & number of the certificate relating to : Newly checked by the under sign.
any test and examination made under sub rule
(1) or rule 64 together with the name of the
person who issued the certificate

7. Date of annealing or other heat treatment of : Not required


chain and lifting tackle carried out under sub
rule (5) of rule 64 and by whom it was carried
out

8. Particulars of any defect found at any such : No defect found by load testing
examination or after annealing and affecting Tested load 2.5 MT on Load point 2.0 MT at
the safe working load and of the steps taken maximum extended boom i.e. 10 mtr and 9.5 MT
to remedy defect at load 7.5 MT on basic boom and found satisfactory
Rope: 6 No 16 mm in uniform shape and size
Brake and Hydraulic system O.K.
9. Recommendation : SWL recommended 10% below to every load point
as per the Manufacturer’s load chart. Considering the
age depreciation
It is to certify that on 27-02-2023, this Hydra is thoroughly examined and that the above is a correct
report of the result.
This Certificate is valid up to 26-02-2024. Subject to any physical deformation and alteration
Signature: For Creative Technocrats