4. Date when the lifting machine chain, rope : As per factory record
or lifting tackle was taken into use in
The factory.
5. Date and No. the certificate relating to : As per manufacturer T.C.
rules (1) & (7) together with the name and
address of the person who issued the
Certificate.
6. Date of each periodical thorough examination
made under clause (iii) of clause ‘a’ of sub : D.N.A
section (1) of section 29 of the Act and sub
Rule (6) and by whom it was carried out.
7. Date of annealing and other heat treatment : Not Applicable
of the chain other lifting tackle, made under
Sub rule (5) and by whom it was carried out.
8. Particulars of any defects affecting safe : No defects observed.
working load found at any such thorough Found OK.
examination or after annealing and steps
Taken to remedy such defects.
I certify that on 05.04.2023 thoroughly examined the above-mentioned lifting machine and that the
above is a correct report of the result.
Next test Date 04.10.2023
Sunil Kumar
Competent Person
(Memo No. 3449-89, Dated 17.08.2021)