Balaji Engineering Certification

COMPETENT PERSONS And CHARTERED ENGINEERS

Rohtak Road,Near Shiv Mandir Sankhol,Bahadurgarh-124507Distt.Jhajjar(Hr.).Mobile 9999144290, e-mail:innovativecertification@gmail.com


Approved by CIF Govt of Haryana Vide Lic No- 3449-89 Dated-17-08-2021
REPORT OF EXAMINATION OF LIFTING MACHINE/TACKLE
Certificate Ref. No. - ITECC/BEC/LT/2022-23/PM/110

(i) Name of occupier of factory. M/s Paresh Construction & Foundation P. Ltd. C/o VRC Construction

(ii) Address of the Factory. Site :- P-25 Expansion Project, IOCL Panipat Refinery,
Paniapat(Haryana)
(iii) Distinguishing number of mark,if
Crawler Crane(Model - TFC 280), SWL:75 Ton, Present SWL
any, and description sufficient to 28.71 Ton (105 derated from cap. 31.95 ton on boom length
identify the lifting machine, chain, , 27.43 Mtr. And radius 6.10 mtr., Wire Rope Dia 25 mm in 4 Fall,
rope,or the lifting tackle. Make:Tata, S.No. 280C1087 Location :Onsite

(iv) Date when the lifting machine, As per site records


chain, rope or lifting tackle was first
taken into use in the factory.

(v) Date and number of the certificate As per company records


relating to any test and
examination made under sub-rules (1) and (7)
together with the name and address of
the person when issued the certificate.

(vi) Date of each periodical thorough 29 June 2022


examination made under clause(a)
(iii) of sub-section (1) of section 29 of the
Act and sub-rule (6) and by whom
it was carried out.
(vii) Date of annealing or other heat treatment Not Applicable
of the chain other lifting tackle made
under sub-rule (5) and by it was carried out.

(viii) Particulars of any defects effecting the safe No defects affecting safe working load observed.
working load found at any such thorough exam Load test done at 16 Ton on boom length - 27.43
ination or after annealing and the steps taken to Mtr. And radius 9.14 Mtr.
remedy such defects.

I certify that on 29 June 2022 this Lifting Machine/Tackle was


thoroughly examined and the above is a correct report of the result.

Next Inspection Due: 28 June 2023

DISCLAIMER: This Report of examination reflects the condition of the machine/ equipment as on date. We accept no
liability / responsibility whatsoever in case of any accident / mishap on/with/ due to this machine / equipment