You are on page 1of 20

GSTIN- 06CKPPS0718A1ZA Cell No.

9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0162

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

CRAWLER MOUNTED EXCAVATOR

Distinguishing number or mark (if any) and Sr. No. YQ12-B3008


3 description sufficient to identify the lifting : Make:- KOBELCO
machine, chains, rope or the lifting tackle. Model: SK210 HDLC
Capacity- 21T
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2021
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Excavator was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0163

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

CRAWLER MOUNTED EXCAVATOR

Distinguishing number or mark (if any) and Sr. No. N601D01948


3 description sufficient to identify the lifting : Make:- HYUNDAI
machine, chains, rope or the lifting tackle. Model: R210-7
Capacity- 21T
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2017
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Excavator was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0164

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

CRAWLER MOUNTED EXCAVATOR

Distinguishing number or mark (if any) and Sr. No. SP22-70098


3 description sufficient to identify the lifting : Make:- TATA
machine, chains, rope or the lifting tackle. Model: EX215LC SUPER
Capacity- 21T
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2021
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Excavator was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0165

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

CRAWLER MOUNTED EXCAVATOR

Distinguishing number or mark (if any) and Sr. No. N633D02543


3 description sufficient to identify the lifting : Make:- HYUNDAI
machine, chains, rope or the lifting tackle. Model: R210
Capacity- 21T
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2019
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Excavator was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0166

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

CRAWLER MOUNTED EXCAVATOR

Distinguishing number or mark (if any) and Sr. No. PUNJD20BUJ2752418


3 description sufficient to identify the lifting : Make:- JCB
machine, chains, rope or the lifting tackle. Model: JS205
Capacity- 20T
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2018
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Excavator was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0167

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

CRAWLER MOUNTED EXCAVATOR

Distinguishing number or mark (if any) and Sr. No. PUNJD20AVL2895332


3 description sufficient to identify the lifting : Make:- JCB
machine, chains, rope or the lifting tackle. Model: JS205
Capacity- 20T
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2021
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Excavator was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0168

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

CRAWLER MOUNTED EXCAVATOR

Distinguishing number or mark (if any) and Sr. No. 6BG1398239


3 description sufficient to identify the lifting : Make:- SCHEWING STETTER
machine, chains, rope or the lifting tackle. Model: XE230C
Capacity- 21T
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2021
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Excavator was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0169

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

CRAWLER MOUNTED EXCAVATOR

Distinguishing number or mark (if any) and Sr. No. SP21-62030


3 description sufficient to identify the lifting : Make:- EX210LC SUPER+
machine, chains, rope or the lifting tackle. Model: TATA HITACHI
Capacity- 21T
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2019
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Excavator was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0170

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

CRAWLER MOUNTED PIPELAYER

Distinguishing number or mark (if any) and Sr. No. (7061)/1581


3 description sufficient to identify the lifting : Make:- DAIFENG
machine, chains, rope or the lifting tackle. Model: DGY70H
Capacity- 70T
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2020
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Pipe-Layer was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0171

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

AIR COMPRESSOR

Distinguishing number or mark (if any) and Sr. No. BUCD121166 (CO081)
3 description sufficient to identify the lifting : Make:- ELGI
machine, chains, rope or the lifting tackle. Model: PG300 - 100 2W HINO
Capacity- 300CFM
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2021
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Air Compressor was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory. Safe working pressure is 10.5KG/CM²
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.03.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0172

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

AIR COMPRESSOR

Distinguishing number or mark (if any) and Sr. No. BGID120178 (CO045)
3 description sufficient to identify the lifting : Make:- ELGI
machine, chains, rope or the lifting tackle. Model: PG300 - 100
Capacity- 300CFM
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2017
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Air Compressor was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory. Safe working pressure is 10.5KG/CM²
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.03.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0173

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

AIR COMPRESSOR

Distinguishing number or mark (if any) and Sr. No. BTFD162270 (CO073)
3 description sufficient to identify the lifting : Make:- ELGI
machine, chains, rope or the lifting tackle. Model: PG400 - 175 AC
Capacity- 400CFM
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2020
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Air Compressor was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory. Safe working pressure is 12.5KG/CM²
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.03.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0174

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

AIR COMPRESSOR

Distinguishing number or mark (if any) and Sr. No. BTFD162270 (CO087)
3 description sufficient to identify the lifting : Make:- ELGI
machine, chains, rope or the lifting tackle. Model: BVKD231053
Capacity- 1100 CFM (300 PSI)
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2022
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Air Compressor was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.03.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0175

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

PRESSURE PUMP

Distinguishing number or mark (if any) and Sr. No. 20210648


3 description sufficient to identify the lifting : Make:- PRESSUREJET
machine, chains, rope or the lifting tackle. Model: PX1735IR
Capacity- 17LPM/350KG/CM2
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2021
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Pressure Pump was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.03.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0176

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

PRESSURE PUMP

Distinguishing number or mark (if any) and Sr. No. 2122-3271


3 description sufficient to identify the lifting : Make:- PRESSUREJET
machine, chains, rope or the lifting tackle. Model: PX1735IR
Capacity- 17LPM/350KG/CM2
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2022
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.

Date of each periodical thorough


examination made under clause (a) (ii) of sub On 08.09.2022
6 :
-section (1) of sub section 23 of the Act and By Pawan (Chartered Engineer)
Rule 64(7) and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Pressure Pump was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.03.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0177

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

LIFTING PUMP
Distinguishing number or mark (if any) and Sr. No. 04.1114.10/1820022 (LP004)
3 description sufficient to identify the lifting : Make:- KIRLOSKAR
machine, chains, rope or the lifting tackle. Model: HA494
Capacity- UP-150/30
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : As per company record
factory.
Date and number of the certificate relating to
any test and examination made under Rule 64
5 (5) and 64 (6) together with the name and : By Manufacturer
address of the person who issued the
certificate.

Date of each periodical thorough examination


made under clause (a) (ii) of sub -section (1) On 08.09.2022
6 :
of sub section 23 of the Act and Rule 64(7) By Pawan (Chartered Engineer)
and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Lifting Pump was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the above
is a correct report of the result. Next inspection date will be 07.03.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0178

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

FILLING PUMP
Distinguishing number or mark (if any) and Sr. No. 1291810179 (FP004)
3 description sufficient to identify the lifting : Make:- KIRLOSKAR
machine, chains, rope or the lifting tackle. Model: RKB125/30.6
Capacity- 200M^3/H
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : As per company record
factory.
Date and number of the certificate relating to
any test and examination made under Rule 64
5 (5) and 64 (6) together with the name and : By Manufacturer
address of the person who issued the
certificate.

Date of each periodical thorough examination


made under clause (a) (ii) of sub -section (1) On 08.09.2022
6 :
of sub section 23 of the Act and Rule 64(7) By Pawan (Chartered Engineer)
and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Filling Pump was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the above
is a correct report of the result. Next inspection date will be 07.09.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0179

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

PRESSURE PUMP
Distinguishing number or mark (if any) and Sr. No. 18190501 (PP022)
3 description sufficient to identify the lifting : Make:- PRESSURE JET
machine, chains, rope or the lifting tackle. Model: KDC45
Capacity- 250 LPM 250 KG/CM2
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : As per company record
factory.
Date and number of the certificate relating to
any test and examination made under Rule 64
5 (5) and 64 (6) together with the name and : By Manufacturer
address of the person who issued the
certificate.

Date of each periodical thorough examination


made under clause (a) (ii) of sub -section (1) On 08.09.2022
6 :
of sub section 23 of the Act and Rule 64(7) By Pawan (Chartered Engineer)
and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Pressure Pump was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the above
is a correct report of the result. Next inspection date will be 07.03.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0180

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

DOZING PUMP
Distinguishing number or mark (if any) and Sr. No. 3183.11.21
3 description sufficient to identify the lifting : Make:- MINIMAX DOSING PUMPS
machine, chains, rope or the lifting tackle. Model: MM-4
Capacity- 350LPH
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : As per company record
factory.
Date and number of the certificate relating to
any test and examination made under Rule 64
5 (5) and 64 (6) together with the name and : By Manufacturer
address of the person who issued the
certificate.

Date of each periodical thorough examination


made under clause (a) (ii) of sub -section (1) On 08.09.2022
6 :
of sub section 23 of the Act and Rule 64(7) By Pawan (Chartered Engineer)
and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Dozing Pump was visually examined, functionally tested &
7 :
examination or after annealing and of the found satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the above
is a correct report of the result. Next inspection date will be 07.03.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,
whatsoever in case on any accident/mishap on/with/due tho this machine/equipments
GSTIN- 06CKPPS0718A1ZA Cell No. 9672244052
Email: - shrivinayakaengineers21@gmail.com

SHRI VINAYAKA ENGINEERS


REPAIR & MAINTENANCE OF MINING, CONSTRUCTION OIL & GAS FIELD MACHINERY, METALLURGY MACHINERY
MOTORISED ROAD FREIGHT TRANSPORT & EQUIPMENT FITNESS CERTIFICATE

PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL

Report No.: CE/SVE/2022-23/0181

1 Name of Occupier of Factory : M/s KALPATARU POWER TRANSMISSION LTD

GNPL PROJECT-PART-B TEZPUR -ASSAM


2 Address of the Factory : NO 2, DHOLAWARI, P.O TEZPUR, DHOLAWARI CHARAWALI
UNIVERSITY ROAD, DIST SONIPUR, ASSAM. PIN CODE 784001.

TYRE MOUNTED HYDRA


Distinguishing number or mark (if any) and Sr. No. 6160730253 (REG No. AS01HC5384)
3 description sufficient to identify the lifting : Make:- ACE
machine, chains, rope or the lifting tackle. Model: 14XW
Capacity- 14T
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : As per company record
factory.
Date and number of the certificate relating to
any test and examination made under Rule 64
5 (5) and 64 (6) together with the name and : By Manufacturer
address of the person who issued the
certificate.

Date of each periodical thorough examination


made under clause (a) (ii) of sub -section (1) On 08.09.2022
6 :
of sub section 23 of the Act and Rule 64(7) By Pawan (Chartered Engineer)
and by whom it was carried out.

Particulars of any defect affecting the Safe


Working Load found at such through The Hydra was visually examined, functionally tested & found
7 :
examination or after annealing and of the satisfactory.
step taken to remedy such defects.

We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the above
is a correct report of the result. Next inspection date will be 07.09.2023.

Signature of Chartered Engineer)


Membership No. of CE: AM160888

ADDRESS: - Near Bypass, Village- Mirpur, Dabwali Road, Sirsa Haryana-125055


SAFETY FIRST, QUALITY MUST, SAFETY HAS NO HOLIDAY, ACCIDENTS AND INJURIES ARE PREVENTABLE
DISCLAIMER: - This report of examination reflects the condition of machine/Equipments as on the date of testing. We accept no liability/responsibility,