PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.09.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
AIR COMPRESSOR
Distinguishing number or mark (if any) and Sr. No. BUCD121166 (CO081)
3 description sufficient to identify the lifting : Make:- ELGI
machine, chains, rope or the lifting tackle. Model: PG300 - 100 2W HINO
Capacity- 300CFM
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2021
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.03.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
AIR COMPRESSOR
Distinguishing number or mark (if any) and Sr. No. BGID120178 (CO045)
3 description sufficient to identify the lifting : Make:- ELGI
machine, chains, rope or the lifting tackle. Model: PG300 - 100
Capacity- 300CFM
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2017
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.03.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
AIR COMPRESSOR
Distinguishing number or mark (if any) and Sr. No. BTFD162270 (CO073)
3 description sufficient to identify the lifting : Make:- ELGI
machine, chains, rope or the lifting tackle. Model: PG400 - 175 AC
Capacity- 400CFM
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2020
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.03.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
AIR COMPRESSOR
Distinguishing number or mark (if any) and Sr. No. BTFD162270 (CO087)
3 description sufficient to identify the lifting : Make:- ELGI
machine, chains, rope or the lifting tackle. Model: BVKD231053
Capacity- 1100 CFM (300 PSI)
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : 2022
factory.
Date and number of the certificate relating
to any test and examination made under
5 Rule 64 (5) and 64 (6) together with the : By Manufacturer
name and address of the person who issued
the certificate.
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.03.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
PRESSURE PUMP
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.03.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
PRESSURE PUMP
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the
above is a correct report of the result. Next inspection date will be 07.03.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
LIFTING PUMP
Distinguishing number or mark (if any) and Sr. No. 04.1114.10/1820022 (LP004)
3 description sufficient to identify the lifting : Make:- KIRLOSKAR
machine, chains, rope or the lifting tackle. Model: HA494
Capacity- UP-150/30
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : As per company record
factory.
Date and number of the certificate relating to
any test and examination made under Rule 64
5 (5) and 64 (6) together with the name and : By Manufacturer
address of the person who issued the
certificate.
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the above
is a correct report of the result. Next inspection date will be 07.03.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
FILLING PUMP
Distinguishing number or mark (if any) and Sr. No. 1291810179 (FP004)
3 description sufficient to identify the lifting : Make:- KIRLOSKAR
machine, chains, rope or the lifting tackle. Model: RKB125/30.6
Capacity- 200M^3/H
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : As per company record
factory.
Date and number of the certificate relating to
any test and examination made under Rule 64
5 (5) and 64 (6) together with the name and : By Manufacturer
address of the person who issued the
certificate.
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the above
is a correct report of the result. Next inspection date will be 07.09.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
PRESSURE PUMP
Distinguishing number or mark (if any) and Sr. No. 18190501 (PP022)
3 description sufficient to identify the lifting : Make:- PRESSURE JET
machine, chains, rope or the lifting tackle. Model: KDC45
Capacity- 250 LPM 250 KG/CM2
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : As per company record
factory.
Date and number of the certificate relating to
any test and examination made under Rule 64
5 (5) and 64 (6) together with the name and : By Manufacturer
address of the person who issued the
certificate.
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the above
is a correct report of the result. Next inspection date will be 07.03.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
DOZING PUMP
Distinguishing number or mark (if any) and Sr. No. 3183.11.21
3 description sufficient to identify the lifting : Make:- MINIMAX DOSING PUMPS
machine, chains, rope or the lifting tackle. Model: MM-4
Capacity- 350LPH
Date when the lifting machine, chain rope or
4 lifting tackle was first taken into use in the : As per company record
factory.
Date and number of the certificate relating to
any test and examination made under Rule 64
5 (5) and 64 (6) together with the name and : By Manufacturer
address of the person who issued the
certificate.
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the above
is a correct report of the result. Next inspection date will be 07.03.2023.
PRESCRIBED FOR REPORT OF EXAMINATION FOR CRANES, OTHER LIFTING MACHINES & PRESSURE VESSEL
We certify that on 08.09.2022, we thoroughly examined the above mentioned Lifting machine/ Tool Tackle and that the above
is a correct report of the result. Next inspection date will be 07.09.2023.