Republic of the Philippines

Zamboanga Peninsula Polytechnic State University

COLLEGE OF TEACHER EDUCATION

R.T. Lim Blvd., Zamboanga City

In Partial Fulfillment of the course Requirements

In

DT 311

Construction Estimates and Phil. National Building Code

FOOTING & COLUMN


DOCUMENTATION

Submitted to:

HAZEL SERRA

PED-6 Professor

Submitted by:

DOMOSMOG, JOSHUA E.
FOOTINGS AND COLUMN MINIATURE
LABEL
Skeletal Column & Footing

8 pcs of size 12 wire


with 1 ft. long for
bars for column
8 pcs of size 16 wire
Bar spacing 2 cm
with 7 inch for ties
both sides

6 pcs of size 12 wire


with 6 inch long bars
for footing
Bar spacing 2 cm
both sides
PROCEDURE
 Cut the wire in 12’ length for the column & bend 1’ in 90 °.
 Cut the wire in 6 length for the footing & bend 1’ in 90 °.
 Cut the wire in 7’ length for the ties & bend every 1.5’ in 90 ° to
create a square shape.

 Start to assemble the bars and ties for column then after start to
assemble the bars for the footing.

 Then after tie up both the skeletal of the column and footing.
 Prepare the molder for the footing, and also start to mix the sand
and cement to create mortar cement

 Place the skeletal of the footing and column inside the molder,
and start to fill the molder with the mortar cement.
 Leave it till it dries.

 When it dries, start to create the molder for the columns and
prepare it to be filling up with mortar cement.
 Start to fill the molder with the mortar cement.

 Leave it till it dries.


 After it dries remove the molder
 Finished product.