Professional Documents
Culture Documents
In
DT 311
Submitted to:
HAZEL SERRA
PED-6 Professor
Submitted by:
5 ½’ #12 on
both directions
7 #18 ties
12 #12 bars
5 ½’ #12 on
both directions
½’ # 12
0’- ¼’
0’- ¼’
9 ½’
1 ½’
6’
PROCEDURE
Cut the G.I. wire # 12 in 5 ½’ length for the footing & bend 1/2’ in 90 °.
Cut the G.I. wire # 18 in 7’ length for the stirrups/ties & bend every 1
1/2’ in 90 ° in other to create a square shape.
Place the skeletal of the footing and column inside the molder.
Start to fill the molder with the mortar cement
Finished product.