Serial No Work Description Starting time To Ending time
(Date) (Date)
1 Site cleaning and sand leveling
2 Mobilization
3 Land survey & soil test
4 Collect all necessary drawing
5 Layout and leveling
6 Piling and excavation of footing
7 Soling and CC casting under the
foundation
8 Foundation rod work and
casting
9 Tying of column and casting
10 Tying beam, slab rod and casting
11 Layout floor brick and doing
masonry wok
Structural work
Finishing work
Serial No Work Description Starting time To Ending time
(Date) (Date)
1 Site cleaning and sand leveling
2 Mobilization
3 Land survey & soil test
4 Collect all necessary drawing
5 Layout and leveling
6 Piling and excavation of footing
7 Soling and CC casting under the
foundation
8 Foundation rod work and casting
9 Tying of column and casting
10 Tying beam, slab rod and casting
11 Layout floor brick and doing
masonry wok