Annex - 1

List of on-going flagship projects

Some flagship projects which are being implemented by Japanese ODA financing:

Sl. Project Name Total Cost Expected Outputs


No Implementation period (Project Assistance)
1. Matarbari Ultra Super 51,854 crore taka 1200 MW (600MW x2 units) of
Critical Coal-Fired Power (43,921 crore Ultra Super Critical Coal-Fired
Project taka/556,380 mil Power Plant with transmission
(Power plant, land JPY/approx. USD line, township development,
development, connecting 4.88 billion) access road, port channel are
road, distribution line, port being constructed.
channel)
July 2014-December 2026
2. Dhaka Mass Rapid Transit 33,471 crore taka
First ever metro rail link is being
Development Project (MRT (19,718 crore
constructed from Uttara to
Line 6) taka/255,798 mil
Kamlapur. Total length will be
(metro rail system, station JPY/ approx. USD
20.1 km. It will carry 60,000
plaza) 2.19 billion) passengers per hour. Uttara to
July 2012- Dec 2025 Agargaon part has already started
its operation from 28th Dec 2022.
3. Bangabandhu Sheikh Mujib 16,780 crore taka A dedicated railway bridge over
Railway Bridge (12,149 crore the river Jamuna in parallel to the
Construction Project taka/152,422 mil existing Bangabandhu Bridge is
July 2016-December 2025 JPY/ approx. USD being constructed.
1.349 billion)
4. Hazrat Shahjalal 21,399 crore taka Passenger handling capacity of
International Airport (16,141 crore HSIA will be raised at 12 mppa
Expansion Project taka/203,6029 mil from 6.5 mppa and cargo
JPY/approx. USD handling capacity will be raised at
July 2016-June 2025 1.793 billion) 4.0 mpa from 2.58 million ton.
Aircraft parking bay will be
increased to 62 nos. from 29.
5. Dhaka Mass Rapid Transit 52,561crore taka First underground metro rail will
Development Project (MRT (39,450 crore be established from Airport to
Line 1) taka/512,907 mill Kamlapur route. Purbachal part
September 2019-Dec 2026 JPY/approx. USD will be elevated. Total length will
4.383 billion) be 31.241 km.
1
6. Dhaka Mass Rapid Transit 41,238 crore taka 20.00 km mass rapid transit
Development Project (MRT (29,117 crore system will be established in
Line 5 northern route) taka/425,126 mill MRT line-5 northern route i.e.
September 2019-December JPY/approx. USD Hemayetpur-Aminbazar-Gabtoli-
2028 3.235 billion)) Mirpur 1-Mirpur 10-Kochukhet-
Cantonment-Banani-Gulshan2-
Notun Bazar-Vatara. Amin Bazar
to Notun Bazar portion will be
underground.
7. Matarbari Port 17,777 crore taka It will be a new commercial port
Development Project (12,893 crore at Matarbari area of Cox's Bazar,
January2020-December taka/155,809 mill which will be the first deep sea
2026 JPY/approx. USD port of the country. There will be
1.432 billion) 2 bay terminals with 300m and
460m length and depth of draft
will be 16m. Maximum size of
vessels will be 8000 TEUs.