Professional Documents
Culture Documents
18800
1 2 3 4 5 6 3950 3550 4400 3550 3350
TOP OF FIREWALL
400 TOP OF PARAPET
18800
800
4150 3550 4000 3550 3550 TOP OF ROOF BEAMS
1
A-4
3000
11
14
12
15
13
10
1
9
8
7
6
5
4
3
2
1825
UP
F-2
3100
8000
3 FRONT ELEVATION
A-2 SCALE 1:100 MTS
4000
6 5 4 3 2 1
18800
C SCHEDULE OF FINISHES 3350 3550 4400 3550 3950
TOP OF FIREWALL
FLOOR FINISHES
400
TOP OF PARAPET
F-1 600 x 600 mm GLAZED CERAMIC FLOOR TILES
800
TOP OF ROOF BEAMS
F-2 400 x 400 mm UNGLAZED CERAMIC FLOOR TILES
3000
A-2 SCALE 1:100 MTS COLOR FOR APPROVAL BY THE END-USER) W4 W3 D1 W1 W1
PROVIDE WATER BASE WATERPROOFING
CEILING FINISHES
SECOND FLOOR LINE
CL-1 4.5 mm FIBER CEMENT BOARD ON METAL
FURRING CHANNELS (PAINT FINISH)
3100
W4
1 2 3 4 5 6
GROUND FLOOR LINE
200
NATURAL GROUND LINE
18800
10
1
9
8
7
6
5
4
3
2
W3
1400
DN 5
F-2
A-4
A PANTRY TOILET A B C 1 2 3 4 5 6
F-3
F-3
F-2 F-2 CL-1
HALLWAY D1
CL-1
D4 4000 4000 18800
CL-2 CL-2
OFFICE
800
800
8000
3000
A-2 D3
F-1 F-1
PANTRY TOILET BRGY. SECRETARY BRGY. CAPTAIN BRGY. TANOD OFFICE S E S S I O N H A L L BRGY. CAPTAIN
OFFICE OFFICE OFFICE
CL-1 CL-1
BRGY. CAPTAIN
4000
3100
C W1 W1 W1
GROUND FLOOR GROUND FLOOR
CL-2 CL-2
CL-2
200 200
5
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.