You are on page 1of 1

1 2 3 4 5 1 2 3 4 5 1 2 3 4 5

10100
10100
GA#24, SS 304 GUTTER,
150mm THK FIREWALL
SATIN FINISH
3000 3700 1250
3000 4950 2150 3125 3750 3350
W6 W5 W3 W4 W4 W3 GA#24, PRE-PAINTED
D D D HI-RIB LONG SPAN, G.I ROOFING

RANGE GA#24, PRE-PAINTED


KS KS HI-RIB LONG SPAN, G.I ROOFING SLOPE

DIRTY KITCHEN/LAUNDRY

2400

2400
GRAVEL ON FILL AREA

2400

2400

2400

2400
T&B
BEDROOM

KITCHEN D3

C C COUNTER
C BEDROOM D2

5640
UP

10 10

2650
D2 GA#24, SS 304 GUTTER,

2550
1 2 3 4 5 6 7 8 9 11 5 6 7 8 9 11
SATIN FINISH

3240
12 12

7933
14 18 17 16 15 14

3240

3240

3240
GRAVEL ON FILL 13 HALLWAY 13
DINING ROOM
GA#24, PRE-PAINTED
DOWN
D2 HI-RIB LONG SPAN, G.I ROOFING
EXISTING BUILDING
SLOPE
EXISTING BUILDING EXISTING BUILDING

10450
D2 D2
BEDROOM LOUNGE
AREA

1400
B

1300

1400
B T&B B T&B SLOPE
W3 D3 D3
LIVING ROOM
1755

2410
GRAVEL ON FILL

2410

2410
BALCONY
D1
MASTER'S MASTER'S

3100
BEDROOM BEDROOM

3000
A A 15
A
14 14
W2 W3 W4 W2
13 13

12 12

2300
11 11
2400

10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1
W1 W1 W1 W1
x
3000 3300 3400
x x

3000 3700 3400


3000 3700 3400 MEZZANINE FLOOR PLAN ROOF PLAN
SCALE 1:100 M SCALE 1:100 M

LOWER GROUND FLOOR PLAN UPPER GROUND FLOOR PLAN


SCALE 1:100 M SCALE 1:100 M

D C B A
5 4 3 2 1
1 2 3 4 5 A B C D

11100 11349 11100


TOP OF FIREWALL +9.80M
TOP OF FIREWALL +9.80M TOP OF FIREWALL +9.80M APEX OF ROOF +9.50M TOP OF FIREWALL +9.80M
APEX OF ROOF +9.50M APEX OF ROOF +9.50M APEX OF ROOF +9.50M

TOP OF ROOF BEAM +8.70M


TOP OF ROOF BEAM +8.70M TOP OF ROOF BEAM +8.70M TOP OF ROOF BEAM +8.70M

MEZZANINE FIN. FLR LINE+6.20M


MEZZANINE FIN. FLR LINE+6.20M MEZZANINE FIN. FLR LINE+6.20M MEZZANINE FIN. FLR LINE+6.20M

9800
9800

9800

9800
EXISTING ON SITE
EXISTING ON SITE
EXISTING ON SITE

UPPER GROUND FIN. FLR LINE+3.20M


UPPER GROUND FIN. FLR LINE+3.20M UPPER GROUND FIN. FLR LINE+3.20M UPPER GROUND FIN. FLR LINE+3.20M
BALCONY FIN. FLR LINE+3.00M
BALCONY FIN. FLR LINE+3.00M BALCONY FIN. FLR LINE+3.00M BALCONY FIN. FLR LINE+3.00M

LOWER GROUND FIN. FLR LINE+0.30M


LOWER GROUND FIN. FLR LINE+0.30M LOWER GROUND FIN. FLR LINE+0.30M LOWER GROUND FIN. FLR LINE+0.30M
NAT. GRADE LINE+0.00M
NAT. GRADE LINE+0.00M NAT. GRADE LINE+0.00M NAT. GRADE LINE+0.00M

FRONT ELEVATION RIGHT SIDE ELEVATION REAR ELEVATION LEFT SIDE ELEVATION
SCALE 1:100 M SCALE 1:100 M SCALE 1:100 M SCALE 1:100 M

1 2 3 4 5 D C B A

10100 1000

TOP OF FIREWALL +9.80M TOP OF FIREWALL +9.80M


APEX OF ROOF +9.50M APEX OF ROOF +9.50M

SEE TRUSS DETAILS


SEE TRUSS DETAILS
TOP OF ROOF BEAM +8.70M TOP OF ROOF BEAM +8.70M

MEZZANINE FIN. FLR LINE+6.20M BEDROOM MEZZANINE FIN. FLR LINE+6.20M BEDROOM BEDROOM

BOTTOM OF BEAM+5.80M
9800

9800
EXISTING ON SITE

UPPER GROUND FIN. FLR LINE+3.20M DINING ROOM UPPER GROUND FIN. FLR LINE+3.20M DIRTY KITCHEN DINING ROOM

BOTTOM OF BEAM+2.60M

LOWER GROUND FIN. FLR LINE+0.30M LOWER GROUND FIN. FLR LINE+0.30M

NOTE: NAT. GRADE LINE+0.00M NAT. GRADE LINE+0.00M

HATCHED SECTIONS ARE ALREADY EXISTING ON SITE.


CROSS SECTION LONGITUDINAL ELEVATION
SCALE 1:100 M SCALE 1:100 M

CIVIL ENGINEER PROJECT TITLE OWNER SHEET CONTENTS SHEET NO.

PROPOSED RENOVATION OF TWO STOREY RESIDENTIAL BUILDING WITH MEZZANINE 02


FLOOR PLAN A2 03
ELEVATIONS
PROJECT LOCATION CROSS SECTION
02 07
MR. EDIZZON BUHAY AND MRS. ROWLYN LEI BUHAY
LONGITUDINAL ELEVATION
L10 B21 FLORIDA ST., GREENLAND NEWTOWN, SAN MATEO RIZAL ARCHITECTURAL