You are on page 1of 10
tajethan Saari Developmen Iestment Corporation td ye iAfaiathanSevererent Undertanng E Unit Il, Rest House Road, RICO Chowk, Bhiwadi, Distt Alwar, Rajasthan (India), Bhiwadi (Unit-i!) sera ores ater oy 220 922072800 cin wo: Urstonnraessecont2s3 REICO civccrccncssran Email: bhiwadi2eriica.co.in Regd. A.D. / Speed-Post / E-mail No. : 2133 Date =: 30-Aug-2019 - "1S NAVRATAN PIPE AND PROFILE LIMITED. 6, Community Center, 3rd Floor Mayapur , Industrial New Del 110064 MODE OF ALLOTMENT : Auction Subject » Allotment of Industrial Plot at Industrial Area KAROLI, Alwar ©. Your Application dated : 06-Jul-2079, \o auction dated 15-Jul-2019, The Management of the Corporation is pleased to allot you Plot No, measuring 8018.00 sqm al Industrial Area KAROLI for establishing industry for manufacturing AUTO F PIPES @ Rs 6,040.00 per sqm on the following terms and conditions: 1 \. will deposit the Econemic Rent (E.R) of the Piot in this Office al the rate of Rs. 300 per 4000 sem per 1m Rs. 100 within 120 days from the Date of Issue of this lelter and in future at the begining of ori ii) advance by 31S! July of that year. There is also a provision of payment of one time Economic Rent rt io 10 dines the amount fixed for one year corporation i 10 lime at the beginning of each financial yes 4!) tha’ year as per rate preserited by the Corporation from time to time. In case of failure to conbed rate in time (Le. before 31st July of the financial year or 120 days from the date af Allin as) may 98, the Allottee will pay service charges at rate and interest@ 14% p.a. (oresemily) on sarviss >" si Apni or 120 day of allotment. whichever is applicable, til the date of payment. There tsa pio { one time Service Chiarges also equivalent to 6 times the amount fixed for one year which i$ 1° | The Service charge shal be enhanced by 10% annually, hal you Nave altady deposited + } 1% Premium as Security Money Rs. 4,84,267.00 ve Premium Rs. 1.21,07 180.00 4 remaining premium and ather dues is as follow = 1. Balance 75% premium Rs. 9,83,21,540.00 {8} Eoanornic Rent for the year 2019-2020 Rs, 601.00 Jay un Beanemic Rent for the year 2019-2020 Rs, 108. 1¢ deposition of Ecenomie Rent (if opted) Rs. 6,010.00 1 One time deposition of Economic Rent {if opled) — Rs 4.081.40 ve year 2079-2020 Rs. 52,120.01 One tre deposition of S.C. for ten years {if opted} Rs, 4,69.080 ot Cosi of Site Plan (2 sets) Rs. 150.00 1 OF Sice Plan Tax, Rs. 28, Total Rs, 3,68,50,71.08 i balance 75% remaining premium will be deposited in 7 quartedy installments along-with ‘nlarest thesscan < de payment of installment, interest @ 14% p.a. on the due installment amount shail be levied for the default period. For opting, installment facility, an application will have to submit within 30 days ot altotment iotter. 3{¢) [hal you may opt to pay balance 75% premium within 120 days of land allotment for which no interest will be ata) 7 ‘© Premium and other dues shall only be made online / Cashless / through any Digital mode. ) In case of Digital payment of premium and ther dues through RTGS / NEFT, the details of bank account is as under 1. Name of Recipient RIICO Lid, 2. Current Ale No +: 61026340074 3, Name of Bank 2.0. Ale with SBI Bank [le No : 51026340074] 4, Bank Branch & Address: Ind, Estate RIICO Chowk Bhiwadi 3S Code SBINOO31465 : ition reserves the right to enhance the rata of allotment, i the compensation payable under an award is enhanced by any competent court subsequent « allotment made to those categories of allottees to whom concession in rate of allotment has been given, would © 07 non-transferable basis, However, in case the transfer takes place within five years from the date of nvmencemnent of commercial production, the difference amaunt of rate of allotment on account of concessicr th interest from the date of alotment will have fo be paid by the alottee. ») 2" denesition ofthe balanes premium along with other dues as envisaged in 3(b) or 3) as the case may be, you 11 ge! ie lease deed of the plot executed and get it registored at your own cost. The lease deed shall be executed within, 90 days from the date of ful payment. In cases of allotment on installment basis, lease deed she ‘axced Form 'D! within 90 days from the allotment date.In case of payment of balance 75% premium in inient vossession of the plot will be taken over within 30 days from the date of alotment and if you opt io 13) 757) premium within 120 days of land allotment, possession of the plot will have to taken over within 20 er ‘rom the date stipulated or the actual date of payment of balance 75% premium whichever is later {rom Assistant Regional Manager/Assistant Site Engineer.In case the possession is not taken during this period, the allotment letier will stand cancelled and also this may please be noted and also in case, possession of the allolien. 0. is not taken by the allotiee within the prescribed period, then thelr claim for waiver of various charges dus Ic cispute on the plot reported later on will not be entertained by the Corporation. Taal you will 9e required to raise boundary wallfercing within 6 months from the date of physical jessior During this period, it any dispute regarding un-authorized possession/encumbrances over the allotiec: land vic, s foung, will have to be reported by registered post along-with full details to this office. In case, the dispute iicU above is not reported within the above period, then your subsequent request for waiver of any charges will io) De entertained, Busuing parameter for Industrial plot are as per enclosed site plan. ‘ required to take effective steps for commencement of production activities after completion o1 8 pariod of three years from the date of handing over possession of plot or from the cate o | industrial area “as Developed” whichever is later, otherwise the allotment will be liable to be his Ourpose the construction would mean “Coverage of at least 20% of the plot area on ground oF Fai wilh @ pucea suuciure where roof has been built up.Bult up area would mean a building having foundation anc wails af least on three sides. he aliottee shall intimate by registered letter to the corporation after commencement of production activities in plot ‘ong-with ceguisite documents issued by concemed department, This would be treated es date of the mencement af production subject to verification by the Carporation. © extivision afler the Scheduled period of three years would be considered by the competent authority with Ihe ysetention charges as per rules ‘amen of production” will be deemed only after intimation by registered letter to the Corporation with ion as mentioned above & submission of any one of following documents tunis which are liable to deposit GST the date on which the unit makes the first payment of GST. ) In case of units not paying GST~ any other tax paid for the first time to the State Government. oF those sectors which do not pay any taxes to the State Government in respect of investment to whiviy svdsidy/exemplion is linked ~ bill of commercial transaction (receipt of deposi of fee/charges etc. letter of allotment shal! be parl and parcel of the lease deed to be executed subsequently, and you shal alsc bi susas of the lease dead, ‘al provisions and set backs norms/building parameters of RIICO Disposal of Land Rules, 1979 wi plot showing building parameters is enclosed ¥ © are any wellsitreesistructures/compound wall etc. on the plet, the cost of it will be paid by you Separately as may be decided by the Corperation, k case Power/Telephone line is passing through your plot, the Corporation does not undertake any responsibilty al, You would be required to plan your construction after leaving prescribed set backs. You shall use solar water heating system where hot water is required for processing, 2 mitted to run any activity other than the permitted on the allotted plot, 4. You will nol cigibore/dril the open wellhand pump/ube wall in the plot without the permission of concerned authority, 5. The land & builcing tax all other taxes as applicable shall be paid by the Alottee. '6, That you shall give preference for employment to the local villagers whose land has been acquired by RICO. 17, Water may be provided by the Corporation as per availabilty, 18, You have lo follow rules & regulations of concemed Vidhyut Vitran Nigam Limited (VVNL), RIICO will not share any upenditure in ease of separate feeder line is to be laid by VVNL for your premises. his allotment letter will be treated as NOG of Corporation for Water &Power connection in the allotted plot from -cnoarned department, tll allotment stands vali 9. That you shall not use any space in the industrial area other than demised premises for dumping/placing of waste ‘meicrial and shal take care of all measures for disposal of waste material as per norms of RSPCB. ven is valid only for setting up of "Non Polluting Industries" having zero effluent discharge jail abicle by other terms and conditions as laid down in RIICO Disposal of Land Rules, 1979. & ime to time provide wo s of building plans self certified duly verified by an architect (for industria! pio icential plots more than 500 sqm., commercial plots more than 300 sqm. and building | olher categories) Architect registerec with council of architecture who will certify that building plans by hin’ are as per technical norms laid down in building regulations of RIICO Disposal of Land Rules "rendments time to time, 10000 sq +. You woule install a dust controller in your industry 10 avoid dust, nuisance in the area as prescribed by the nesmed authority, froportionate cost towards the conveyance system for effluent discharge from your industry lecided by the Corporation jake all measures which are required for Pollution Control and shall stricly adhers to the sisbons Imposed by Rajasthan Slate Pollution Control Board anc other statutory Pollution Laws of he \2/State for the time being enforce, ve alloites shall abide by the provisions of Indian Electricity Act. 1948 and Rules made there under’ in re! 0 HT. ovartead power line passing adjacent to the plot "io! will be permitted as per provision in RICO Disposal of Land Rules, 1979 & as amended from tirrie bevome a member of the Association/ Agency/Society/Trust created for satting up and operating 't Voss (hazardous and non hazardous) Disposal system (SWOS). All the Capital & Revenue expense Jon, operation and maintenance of SWDS shall be borne by all members of Association’ Agericy ated in the proportion decide by the Committees of the said Associalion/ Agency! Society! Trust voll obiain NOG & abide by rule/reguiation of Local authorities, Fire fighting authority, Airport authori on Go:ol Board & other Central’State Govt, statuary authonties as per their requirement and applicability 1 nivoroject v of surrence of plot by vou or cancellation of allotment of plot by the Corporation, refund of the an sited by you will be made after deductingiforteiting the amount from the deposits as per the Rules 2" “he . 's nay be prevailing al that time, "© Said plot is canceled due to any of the reason/surrenderad by the allotlae, no payment of cansiructicr ou on the said plot shall be payable. You have to remove such type of construction at your risk & cost. ‘be of surrender of plot, while making payment of refundable amount, necessary deduclions as per tne rules a ‘orporation shall also be made, water conservation in plot size 600 sqm. or more, you will have ta constructedRain Water Harvesting Sys manidatory for considering the uni in production otherwise panel charges will have to be paid as per Ruiv least one (ow of irees in your plot, al a reasonable distance of 3 to 5 mir. cle along the bc as slatea al para 3® as the case may be as above is not paid, or there is a violation a iy above terms and conditions of allotment letter and lease agreement then allotment of plot would automatically be lieated as cancelled and amount will be forfeited as per RICO Disposal of Land Rules 1979 & amended from line to ime, However interest paid & payable/accrued for late payment of premium shall be deducted in addition to Security Money, deduction of land premium as applicable from time to time in RICO Disposal of Land Rules, 1979, Service Charges, Economic Rent and Interest thereon if levied or liveable etc, Irrespective of the time period. No payment for the construction of structures built up & left by allottee shall be given by the corporation {hat you wil submit an undertaking on Rs. 10/- non-judicial stamp paper related to deposition of GST (Performa Enclosed), The plot number being indicate of your preference is subject to changes, if necessary, by the Corporation’ |The plots allotted on "as is where is" basis & as per actual area available at site, ‘i, You will comply with the provisions of all Labour Laws, which are in force from time to time. ii, CONSTITUTION OF THE FIRM shall be : Limited Company » iv, That the land allotment has been made to the M/S NAVRATAN PIPE AND PROFILE LIMITED & in future if any re constitution of the firm/society/companyttrust is requested it would be dealt/examined under policy of the 2I|CO Disposal of Land Rules, 1979 nt you will have to submit following documents within 30 cays :-NILL, Special Conditions: Tie Alloiment Js Made in Auta Zone to setup an industry in Auto Sector. Industry faling under other SectoriZone is atlowad/aormitiod Auto Zone, 54 shall not setup an Industral project covered under the Category: A of the Notification dated 14th September 20068 is josequent amendments issued by the Ministry of Environment & Forosi, Gov, of india. Further, you shall carry out cansti-on oiactviies in compliance to Rem 8b) of schedule ofthe said Notflcation, | 00} setup ter intensive industial project #8 mentioned in the Guldelines/Critera for Evaluation of Proposals!Recuests for Aosiraelion dated 15.11.2012 & its subsequent amendments, issued by Central Ground Water Authority, Ministry of ‘esources, Govt. of India, Thanking You, Sr. Regional Mananer REG Ltd,, Plinwacy 4 CALCULATION SHEET ate of Interest RICO 1 | SITE PLAN OF PLOT NO. B-40 | | AT INDUSTRIAL AREA KAROLI ) (AUTO ZONE) | FOR:- BACKS AeA AREA =8018.00 SQM... See a Tt IE OFFICE = 3.50 X 6.00M. ( FRONT / SIDE) LAND USE = INDUSTRIAL | © /CAR STAND = Zo0eBOON (ERENT. SES penny | = Ltox 000 (SDE Rony | Some cures Hox cee OM NORTH | BulLoinc paRAMETERS MAXINUM B.A.R =1.50 | MAXIMUM HEIGHT OF BUILDING =15.0 MT. | PARKING REQUIRMENT = 1ECS/100 Som, [OF TOTAL BUILT UP AREA NOTE:- SET BACK ARE APPLICABLE WITH CONDITION THAT | ‘A CLEAR PASSAGE OF WIDTH 4.50 MT, SHOULD BE REQUIRED. ‘TO LEAVE AROUND THE BUILDING FOR THE MOVEMENT OF FIRE FIGHTING ENGINE PLOTNO.F- 38 & 39 Asjasthon Stat Industri Development & Investment Corporation Lt (Rojathon Government Underatng) Unit Is Rest House Rod, CO Chowk, Bhvod Dat Aor Rajesthn hla, hae (Unk) (PE serve oss za 0 2200 9207280 CIN No. Utstoontsessecooize3 RICO sicccacon Email: bhiwadiz@riica.co.in Regd. A.D. / Speed-Post / E-mai No. 2134 Date: 30-Aug-2019 . “MIS NAVRATAN PIPE AND PROFILE LIMITED 16 Community Genter, 3rd Floor, Mayapuri, Incustrial h New Dethi- 110064 MODE OF ALLOTMENT : Auction cf Allotment of Industrial Plot at Industrial Area KAROLI, Alwar Your Application dated : 06-Jul-2019, Dear SiriM'am, his is with reference to auction dated 15-Jul-2019. The Management of the Corporation is pleased to allot you Plot No 5-41 (Airto Zone) measuring 8000.00 som at Industrial Area KAROLI for establishing industry for manufacturing AUTO STEEL CONDUIT PIPES @ Rs 6,040.00 per sqm cn the following terms and conditions: \ wll Ueposit the Economic Rent (E.R.) of the Piot in this Office at the rate of Rs. 300 per 4000 sqm pe year 8 minimum Rs. 100 wthin 120 days from the Date of Issue of this letter and in future at the beginning of ear ‘inanciat yee in advance by 31st July of that year. There is els0 a provision of payment of one fime Economic Fer aquival ‘ies the amount fixed for one year. 1 you will deposit the Service Charge for the allotted area in this fice at the rates decided by the Corporatiot ys from the date of allotment and from tine to time at the beginning of each financial year in advanre thal year as per rate preseribed by the Corporation from time to time. In case of fallure ta pay suvice bod rate in tme (Le. before 313t July ofthe financial year or 120 days from the date of Alotner the Allottee vail pay service charges at rate and interest@ 14% p.a. {presently} on service v/ges wel. 1stApril or 120 day of allotment, whichever is applicable, tl the date of payment. There is @ provisior 10! one time Service Charges also equivalent to 6 times the amount fixed for one year, which is for ihe 10 years. The Service charge shall be enhanced by 10% annually. ~ 4(s) Thal you have already deposited :- VY “y Premium as Security Money Rs. 4,83,200,00 % oF more Premium Re. 1,20,80,000.00 340) The dials of remaining premium and other dues is as follow > alanive %5% premium Rs 3,62,40,000.00 Economic Rent for the year 2019-2020 Rs, 600.00 Tx on Economic Rent for the year 2019-2020 Rs. 108.00 Ons time deposition of Economic Rent if opted) Rs, 6,000.00 Jax on One time deposition of Economic Rent {if opted) Re, 4,080.9 nr the year 2619-2020 Rs 52,000. ‘One tine deposition af S.C. for ten years tif pied) Rs. 4,68,000.00 Rs, Side Pian Tax. Rs Total Rs. 3,67,67,966.00 hal balance 75% remaining premium will be deposited in 7 quarterly installments along-wih interest thereon @ p.2.ln case of default in payment of installment, interest @ 14% p.a. on the due installment amount shail als jovied for the default period. For opting, installment facility, an application will have to submit within 29 day nay Opt 12 Pay balance 75% premium within 120 days of land allatment for which no interest will be Sid) The above Premium and other dues shall only be made online / Cashless / through any Digital mode. 3(6) In case of Digital payment of premium and other dues through RTGS / NEFT, the details of bank account is as id Name of Recipient RICO Li. 2. Cument Ave No 91026340074 Name of Bank C.D. Ale with SBI Bank (Aic No : 51026340074] Bianch & Address: Ind, Estate RIICO Chowk Bhiwadi 5, Branch RTGS Code ‘SBIND031465 : ‘The Corporation reserves the right to enhance the rate of allotment, if the compensation payable under an award is enhanced by any competent court subsequently. (g) The alloiment made to those categories of allattaes to whom concession in rate of allotment has been given, would, on non-transferable basis. However, in case the transfer takes place within five years from the date of commencenient of commercial production, the ditlerence amount of rate of alloment on account of concession from the date of allotment will have lo be paid by the allottee, | ‘he balance premium along wit, other dues as envisaged in 3(b) or 3(c) as the case may be, you ise deed of Ihe plot executed and get it registered at your awn cost. The lease deed shall be execu! vthin 99 days from the date of full oayment. In cases of allotment on installment basis, lease deed shall be -xacuted in Form ‘D' within 90 days from the allomment date.In case of payment of balence 75% premiuini el, possession of the plot will be taken over within 30 days from the date of allotment and if you opt to pe since 75% premium within 120 days of land allotment, possession of the plot will have to taken over withir thor fom the date stipulated or the actual date of payment of balance 75% premium whichever is jeter fron. tan) Regional ManagerfAssistant Site Engineer.In case the possession is not taken during this period, the 1\ ler will stand cancelled and also this may please be noted and also in case, possession of the »hce by the allottee within the prescribed period, then their claim for waiver of various charges Ine plot reported later on will not be entertained by the Corporation, hol yo will be required to’ raise boundary wallfencing within 6 months from the date of physica session. During this period, if any dispute regarding un-authorized possession/encumbrances aver the alloc #1c. is found, will have to be reported by registered post aiong-with full details to this office, In case, the disjiil= #8 oled above is not reported within the above period, then your subsequent request for waiver of any charges ill 9) parameter for Industrial plot are as per enclosed site plan virad to take effective stops for commencement of production activities after completion » (ot: within 8 period of three years from the date of handing over possession of plot or from the di of industrial area “as Developed’ whichever 1s later, otherwise the allotment will be liable to lies For this purpose the construction would mean “Coverage of al least 20% of the plot area an ground ‘ith g pucea structure where roof has been buill up.Buil! up area would mean a buiiding having foundation anc sal least on three sides. lotic® shall intimate by registered letter to the corporation after commencement of production activities in plot Honqonihy fequisite documents sued by concerned department. This would be treated a3 date ot "yeni of production subject lo Verification by the Corporation, ne scheduled period of three years would be considered by the competent authorily 1 rges as per rules, uunencement of production” will be deemed only after intimation by registered letter to the Corporation with ‘wits consiruction as mentioned above & submission of any one of following documents := of units which are liable to deposit GST the date on which the unit makes the first payment of GST. ase of un'ts not paying GST~ any other tax paid for the firs! time to the State Goverment. (ese Sectors which do not pay any taxes te the State Government in respect of investment 10 wi sion inked ~ pill of commercia! transaction (receipt of deposit of fee/charges etc. sintment shall be pert and parcel of the leas deed to be executed subsequently, and you shall also of the tease deed, ‘ the general provisions and set backs norms/building parameters of RICO Disposal of Land Rules.1979 will plan of plot showing building parameters is enclosed. ‘manager Si cotd., BhWadhl ~ aoe pias case there are any wellsitrees/structuresicompound wall etc. on the plot, the cost of it will be paid by you soparately as may be decided by the Corporation. In case Power/Telephone line is passing through your plot, the Corporation does not undertake any responsibility Jor ig removal. You would be required to plan your construction after leaving prescribed set backs. You shall use solar water heating system where hot water is required for processing, ‘You are not permitted to run any activity other than the permitted on the allotted plot. Du will not digibore/drll the open wellfhand pumpilube well in the plot without the permission of concemed aulhorily The land & building tax & all other taxes as applicable shall be peid by the Allottee Thal you shall give preference for employment to the local villagers whose land has been acquired by RICO. or may be provided by the Corporation as per availabilty. 2ve to follow rules & regulations of concerned Vidhyut Vitran Nigam Limited (VVNL}, RIGO will not share any viditure in case uf separate feeder line is to be laid by VVNL for your premises. s allotment Ie be eated as NOG of Corporation for Water &Power connection in the allotted plot from ‘erneo departenent, til allotient stands valid, Thal you shall not use any space in the industrial area other than demised premises for dumping/placing of waste material snd shall take care of all measures for disposal of waste material as per norms of RSPCB. he allotment is valid only for setting up of "Non Polluting Industries having zero effluent discharge The allottes shall abide by other terms and conditions as laid down in RICO Disposal of Land Rules, 1979 & amended from time to time. licttee shall provide two sets of building plans self certified duly verified by an architect (for industrial plots ri 19000 sqm., residential pots more than 500 sqm., commercial plots more than 300 sqm. and building 1or categories) Architect registered with council of architecture who will certify that building plans prepared by him are as per technical norms laid down in building regulations of RIICO Disposal of Land Rules 1979 and amendments time to time, ‘You would install a dust controller in your industry to avoid dust, nuisance in the area as prescribed by the concerned authority. vribule proportionate cost towards the conveyance system for effluent discharge from your industry 4 by the Corporation shall take all measures which are required for Pollution Control and shail strictly adhere to the yufauions impased by Rajasthan State Pollution Control Board and other statutory Pollution Laws of 1 for the time being enforce. all abide by the provisions of Indian Electricity Act, 1948 and Rules made there under’ in rafere overhead power line passing adjacent to the plot, Transter of plot will be permitted as per provision in RIICO Disposal of Land Rules, 1979 & as amended from tin 14 shall become @ member of the Association/Agency!Sociaty/Trust created for setting up and operating t (hazaidous 2nd nan hazardous) Disposal system (SWDS). All the Capital & Revenue expenses \tsiig acquistion, operation and maintenance of SWOS shall be borne by all members of Association’ Aye creaied in the proporion decide by the Committees of the said Association’ Agency/ Society! Trust nat vou shall obtain NOC & abide by rule/regulation of Local authorities, Fire fighting authority, Airport authority Polluion Conirot Board & other CentralState Govt. statuary authorities as per thair requirement and applicability your uniproisct 2 of surrender of plot by you or cancellation of alloiment of plot by the Corporation, rafund of the ancti >i wil be made after deducting/forfeting the amount from the deposits as per the Rules of th sation as may be prevailing ai thal time, lod due to any af the reasonisurrendered by the allotiee, no payment of constrictor jou 0° the said plot shall be payable, You rave to remove such type of construction at your tisk & cost. | nde of plot, while making payment af refundable amount, necessary deductions as per the rules 0 shall also be made, 1, water conservation in plot size 500 sqm. or more, you will have to consttuciedRain Water Harvestiig Sysier vis mandatory for considering the unit in production otherwise panel charges will rave to be paid as per Ii plant at least one row of trees In your plot, at a reasonable distance of 3 to § mir cic along the bouic5 ' the amount as stated at ae ory D as the case may be as above is not paid, oF there is @ viation af Seo uid? above t rested as '$ and conditions of allotment letter and lease agreement then allotment of plot would automatically be ‘ancellec and amount will be forfeited as per RIICO Disposal of Land Rules 1979 & amended from time te time, However interest paid & payable/accrued for late payment of premium shall be deducted in addition to ‘Security Money, deduction of land premium as applicable from time to time in RIICO Disposal of Land Rules, 1979 ervice Charges, Economic Rent and Interest thereon if levied or liveable elc. Irrespective of the time period. No Payment for the construction of structures built up & left by allottee shall be given by the corporation Thet you wil submit an undertaking on Rs. 19/- non-judicial stamp paper related to deposition of GST (Performa Enclosed) The plot nt 36 ‘ber being indicative of your preference is subject to changes, if necessary, by the Corporation: lols allotted on "as is where is" basis & es per actual area available at site ‘You will comply with the provisions of all Labour Laws, which are in force from time to time, ji, CONSTITUTION OF THE FIRM shall be : Limited Company « iv Thal the land allolment has been made to the M/S NAVRATAN PIPE AND PROFILE LIMITED & in future if any re- jonstitution of the frm/society/companyitrust is requested it would be dealv/examined under policy of the ‘orporation/RIICO Disposal of Land Rules, 1979 Thal you will have to submit following documents within 30 days :-NILL. Special Conditions: 1 The Ailounent is Mace in Auto Zone ta setup an industy in Aula Sector. Industry faling under other SectoriZore is no! abwed)anitlad in Auto Zone. (shall nok setup an industriel project covered under the Category- A of the Notification dated 14th September 20066 rs Wsaquent amendments issued By the Minisry of Environment & Forest, Govt of india, Further. you shall camry out conetruct tal aciinties in complance te Rein 8(b) of schedule of the Said Notation ntensive industrial project as mentioned in the Guidelines/Crtera for Evaluation of PropasalsRequests ior Nn dated 15.11.2012 8 its subsequent amendments, issued by Central Ground Water Autor ty, Minisiy Govt. of india e* Regional Manage: RNCO Ltd., Bhiwadi-t ae CALCULATION SHEET 4 RICO SITE PLAN OF PLOT NO. B-41 | AT INDUSTRIAL AREA KAROLI ) (AUTO ZONE) free ry XSAREA ‘AREA =8000.00 SQM. : 330X550H, (FRONT / SIDE) 5 1 R 50 K 6.00M. ( FRONT / SIDE ) LAND USE = INDUSTRIAL 008.00 M.( FRONT, SIDE &REAR 1.50 %X.3.00 M._ (SIDE REAR) = 30X60 (REARONLY) NORTH 15.0 MT. 5/109 SOM, NOTE:- SET BACK ARE APPLICABLE WITH CONDITION THAT ‘A.CLEAR PASSAGE OF WIDTH 4.50 WT. SHOULD BE REQUIRED ‘TO LEAVE AROUND THE BUILDING FOR THE MOVEMENT OF FIRE FIGHTING ENGINE PLOTNO.F- 35, 36, 37 & 38 ! .B-4 lag PLOTNO.B41 45, PLOTNO. 100.0 PLOTNO.B-40

You might also like