You are on page 1of 19

PROJECT: DS19/17 SEWERAGE SYSTEM FOR INTERCONNECTING DEVELOPED COMMUNITIES IN JEBEL ALI AREA TO DM NETWORKS

LOCATION: JEBEL ALI Date prepared: 18.04.2020 Date checked: 18.04.2020


AREA/ZONE: WASH OUT CHAMBER (WO-A-04) CH: 08+332.061 Prepared by: cgr Revision: 0
FOUNDATION, WALL AND COVER SLAB REINFORCEMENT

* Specified in multiples of 5 mm. ** Specified in multiples of 25 mm.


All Dimension are in Millimeters

SUMMARY OF STEEL BAR


SIZE
OF WEIGHT (TON)
BAR
8 #REF!
10 #REF!
12 #REF!
16 #REF!
20 #REF!
25 #REF!
32 #REF!

TOTAL #REF!
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
01a 12 2 2 4 8258 8228 21 100 8058 100 0.029
H

T&B
01b 12 2 2 4 8658 8628 21 100 8458 100 0.031
H

T&B
01c 12 2 2 4 9058 9028 21 100 8858 100 0.032
H

T&B
01d 12 2 2 4 9458 9428 21 100 9258 100 0.033
H

T&B
01e 12 2 2 4 9858 9828 21 100 9658 100 0.035
H

T&B
01f 12 2 2 4 10258 10228 21 100 10058 100 0.036
H

T&B
01g 12 2 2 4 10658 10628 21 100 10458 100 0.038
H

T&B
01h 12 2 2 4 11058 11028 21 100 10858 100 0.039
H

T&B
02a 12 2 2 4 11858 11828 21 100 11658 100 0.042
H

T&B
02b 12 2 2 4 11458 11428 21 100 11258 100 0.041
H

T&B
02c 12 2 2 4 11058 11028 21 100 10858 100 0.039
H

T&B
02d 12 2 2 4 10658 10628 21 100 10458 100 0.038
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
02e 12 2 2 4 10258 10228 21 100 10058 100 0.036
H

T&B
02f 12 2 2 4 9858 9828 21 100 9658 100 0.035
H

T&B
02g 12 2 2 4 9458 9428 21 100 9258 100 0.033
H

T&B
02h 12 2 2 4 9058 9028 21 100 8858 100 0.032
H

T&B
02i 12 2 2 4 8658 8628 21 100 8458 100 0.031
H

T&B
02j 12 2 2 4 8258 8228 21 100 8058 100 0.029
H

T&B
03a 12 2 2 4 8029 8014 11 100 7929 0.028
H

T&B
03b 12 2 2 4 4229 4214 11 100 4129 0.015
H

T&B
03c 12 2 2 4 8429 8414 11 100 8329 0.030
H

T&B
03d 12 2 2 4 4629 4614 11 100 4529 0.016
H

T&B
03e 12 2 2 4 8829 8814 11 100 8729 0.031
H

T&B
03f 12 2 2 4 5029 5014 11 100 4929 0.018
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
03g 12 2 2 4 9229 9214 11 100 9129 0.033
H

T&B
03h 12 2 2 4 5429 5414 11 100 5329 0.019
H

T&B
03i 12 2 2 4 9629 9614 11 100 9529 0.034
H

T&B
03j 12 2 2 4 5829 5814 11 100 5729 0.021
H

T&B
03k 12 2 2 4 10029 10014 11 100 9929 0.036
H

T&B
03l 12 2 2 4 6229 6214 11 100 6129 0.022
H

T&B
03m 12 2 2 4 10429 10414 11 100 10329 0.037
H

T&B
03n 12 2 2 4 6629 6614 11 100 6529 0.023
H

T&B
03o 12 2 2 4 10829 10814 11 100 10729 0.038
H

T&B
03p 12 2 2 4 7029 7014 11 100 6929 0.025
H

T&B
03q 12 2 2 4 11229 11214 11 100 11129 0.040
H

T&B
03r 12 2 2 4 7429 7414 11 100 7329 0.026
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
03s 12 2 2 4 11629 11614 11 100 11529 0.041
H

T&B
04a 12 2 2 4 4070 4070 1 4070 0.014
H

T&B
04b 12 2 2 4 8270 8270 1 8270 0.029
H

T&B
04c 12 2 2 4 4470 4470 1 4470 0.016
H

T&B
04d 12 2 2 4 8670 8670 1 8670 0.031
H

T&B
04e 12 2 2 4 4870 4870 1 4870 0.017
H

T&B
04f 12 2 2 4 9070 9070 1 9070 0.032
H

T&B
04g 12 2 2 4 5270 5270 1 5270 0.019
H

T&B
04h 12 2 2 4 9470 9470 1 9470 0.034
H

T&B
04i 12 2 2 4 5670 5670 1 5670 0.020
H

T&B
04j 12 2 2 4 9870 9870 1 9870 0.035
H

T&B
04k 12 2 2 4 5970 5970 1 5970 0.021
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
05 12 2 36 72 7825 7810 11 100 7725 0.499
H

T&B
06 12 2 36 72 11825 11810 11 100 11725 0.755
H

T&B
07 12 2 28 56 3600 3585 11 100 3500 0.178
H

T&B
08a 12 2 2 4 10229 10214 11 100 10129 0.036
H

T&B
08b 12 2 2 4 6429 6414 11 100 6329 0.023
H

T&B
08c 12 2 2 4 10629 10614 11 100 10529 0.038
H

T&B
08d 12 2 2 4 6829 6814 11 100 6729 0.024
H

T&B
08e 12 2 2 4 11029 11014 11 100 10929 0.039
H

T&B
08f 12 2 2 4 7229 7214 11 100 7129 0.026
H

T&B
08g 12 2 2 4 11429 11414 11 100 11329 0.041
H

T&B
08h 12 2 2 4 7629 7614 11 100 7529 0.027
H

T&B
09 12 2 36 72 7825 7810 11 100 7725 0.499
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
10 12 2 36 72 11825 11810 11 100 11725 0.755
H

T&B
11 12 2 8 16 11850 11835 11 100 11750 0.168
H

T&B
12 12 2 8 16 9800 9785 11 100 9700 0.139
H

T&B
13a 12 2 2 4 7629 7614 11 100 7529 0.027
H

T&B
13b 12 2 2 4 11429 11414 11 100 11329 0.041
H

T&B
13c 12 2 2 4 7229 7214 11 100 7129 0.026
H

T&B
13d 12 2 2 4 11029 11014 11 100 10929 0.039
H

T&B
13e 12 2 2 4 6829 6814 11 100 6729 0.024
H

T&B
13f 12 2 2 4 10629 10614 11 100 10529 0.038
H

T&B
13g 12 2 2 4 6429 6414 11 100 6329 0.023
H

T&B
13h 12 2 2 4 10229 10214 11 100 10129 0.036
H

T&B
13i 12 2 2 4 6029 6014 11 100 5929 0.021
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
13j 12 2 2 4 9829 9814 11 100 9729 0.035
H

T&B
13k 12 2 2 4 5629 5614 11 100 5529 0.020
H

T&B
13l 12 2 2 4 9429 9414 11 100 9329 0.033
H

T&B
13m 12 2 2 4 5229 5214 11 100 5129 0.019
H

T&B
13n 12 2 2 4 9029 9014 11 100 8929 0.032
H

T&B
13o 12 2 2 4 4829 4814 11 100 4729 0.017
H

T&B
13p 12 2 2 4 8629 8614 11 100 8529 0.031
H

T&B
13q 12 2 2 4 4429 4414 11 100 4329 0.016
H

T&B
14a 12 2 2 4 11629 11614 11 100 11529 0.041
H

T&B
14b 12 2 2 4 7429 7414 11 100 7329 0.026
H

T&B
14c 12 2 2 4 11229 11214 11 100 11129 0.040
H

T&B
14d 12 2 2 4 7029 7014 11 100 6929 0.025
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
14e 12 2 2 4 10829 10814 11 100 10729 0.038
H

T&B
14f 12 2 2 4 6629 6614 11 100 6529 0.023
H

T&B
14g 12 2 2 4 10429 10414 11 100 10329 0.037
H

T&B
14h 12 2 2 4 6229 6214 11 100 6129 0.022
H

T&B
14i 12 2 2 4 10029 10014 11 100 9929 0.036
H

T&B
14j 12 2 2 4 5829 5814 11 100 5729 0.021
H

T&B
14k 12 2 2 4 9629 9614 11 100 9529 0.034
H

T&B
14l 12 2 2 4 5429 5414 11 100 5329 0.019
H

T&B
15 12 2 10 20 1600 1585 11 100 1500 0.028
H

T&B
16a 12 2 2 4 9272 9272 1 9272 0.033
H

T&B
16b 12 2 2 4 5072 5072 1 5072 0.018
H

T&B
16c 12 2 2 4 8872 8872 1 8872 0.032
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
17a 12 2 2 4 4629 4614 11 100 4529 0.016
H

T&B
17b 12 2 2 4 8429 8414 11 100 8329 0.030
H

T&B
18 12 2 40 80 7825 7810 11 100 7725 0.555
H

T&B
19 12 2 40 80 11825 11810 11 100 11725 0.839
H

T&B
20a 12 2 2 4 4429 4414 11 100 4329 0.016
H

T&B
20b 12 2 2 4 8629 8614 11 100 8529 0.031
H

T&B
20c 12 2 2 4 4829 4814 11 100 4729 0.017
H

T&B
20d 12 2 2 4 9029 9014 11 100 8929 0.032
H

T&B
20e 12 2 2 4 5229 5214 11 100 5129 0.019
H

T&B
20f 12 2 2 4 9429 9414 11 100 9329 0.033
H

T&B
20g 12 2 2 4 5629 5614 11 100 5529 0.020
H

T&B
20h 12 2 2 4 9829 9814 11 100 9729 0.035
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
20i 12 2 2 4 6029 6014 11 100 5929 0.021
H

T&B
20j 12 2 2 4 10229 10214 11 100 10129 0.036
H

T&B
20k 12 2 2 4 6429 6414 11 100 6329 0.023
H

T&B
20l 12 2 2 4 10629 10614 11 100 10529 0.038
H

T&B
20m 12 2 2 4 6829 6814 11 100 6729 0.024
H

T&B
20n 12 2 2 4 11029 11014 11 100 10929 0.039
H

T&B
20o 12 2 2 4 7229 7214 11 100 7129 0.026
H

T&B
20p 12 2 2 4 11429 11414 11 100 11329 0.041
H

T&B
20q 12 2 2 4 7629 7614 11 100 7529 0.027
H

T&B
21 12 2 30 60 3050 3020 21 100 2850 100 0.161
H

T&B
22a 12 2 2 4 11058 11028 21 100 10858 100 0.039
H

T&B
22b 12 2 2 4 10658 10628 21 100 10458 100 0.038
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
22c 12 2 2 4 10258 10228 21 100 10058 100 0.036
H

T&B
22d 12 2 2 4 9858 9828 21 100 9658 100 0.035
H

T&B
22e 12 2 2 4 9458 9428 21 100 9258 100 0.033
H

T&B
22f 12 2 2 4 9058 9028 21 100 8858 100 0.032
H

T&B
22g 12 2 2 4 8658 8628 21 100 8458 100 0.031
H

T&B
22h 12 2 2 4 8258 8228 21 100 8058 100 0.029
H

T&B
23a 12 2 2 4 8258 8228 21 100 8058 100 0.029
H

T&B
23b 12 2 2 4 8658 8628 21 100 8458 100 0.031
H

T&B
23c 12 2 2 4 9058 9028 21 100 8858 100 0.032
H

T&B
23d 12 2 2 4 9458 9428 21 100 9258 100 0.033
H

T&B
23e 12 2 2 4 9858 9828 21 100 9658 100 0.035
H

T&B
23f 12 2 2 4 10258 10228 21 100 10058 100 0.036
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
23g 12 2 2 4 10658 10628 21 100 10458 100 0.038
H

T&B
23h 12 2 2 4 11058 11028 21 100 10858 100 0.039
H

T&B
23i 12 2 2 4 11458 11428 21 100 11258 100 0.041
H

T&B
23j 12 2 2 4 11858 11828 21 100 11658 100 0.042
H

T&B
24a 12 2 2 4 8429 8414 11 100 8329 0.030
H

T&B
24b 12 2 2 4 4629 4614 11 100 4529 0.016
H

T&B
24c 12 2 2 4 8829 8814 11 100 8729 0.031
H

T&B
24d 12 2 2 4 5029 5014 11 100 4929 0.018
H

T&B
24e 12 2 2 4 9229 9214 11 100 9129 0.033
H

T&B
24f 12 2 2 4 5429 5414 11 100 5329 0.019
H

T&B
24g 12 2 2 4 9629 9614 11 100 9529 0.034
H

T&B
24h 12 2 2 4 5829 5814 11 100 5729 0.021
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
24i 12 2 2 4 10029 10014 11 100 9929 0.036
H

T&B
24j 12 2 2 4 6229 6214 11 100 6129 0.022
H

T&B
24k 12 2 2 4 10429 10414 11 100 10329 0.037
H

T&B
24l 12 2 2 4 6629 6614 11 100 6529 0.023
H

T&B
24m 12 2 2 4 10829 10814 11 100 10729 0.038
H

T&B
24n 12 2 2 4 7029 7014 11 100 6929 0.025
H

T&B
24o 12 2 2 4 11229 11214 11 100 11129 0.040
H

T&B
24p 12 2 2 4 7429 7414 11 100 7329 0.026
H

T&B
24q 12 2 2 4 11629 11614 11 100 11529 0.041
H

T&B
25a 12 2 2 4 9329 9329 1 9329 0.033
H

T&B
25b 12 2 2 4 5129 5129 1 5129 0.018
H

T&B
25c 12 2 2 4 8929 8929 1 8929 0.032
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
25c 12 2 2 4 4729 4729 1 4729 0.017
H

T&B
26a 12 2 2 4 8629 8614 11 100 8529 0.031
H

T&B
26b 12 2 2 4 4429 4414 11 100 4329 0.016
H

T&B
26c 12 2 2 4 8229 8214 11 100 8129 0.029
H

T&B
26d 12 2 2 4 4029 4014 11 100 3929 0.014
H

T&B
27 12 2 10 20 1050 1020 21 100 850 100 0.018
H

T&B
28a 12 2 2 4 7629 7614 11 100 7529 0.027
H

T&B
28b 12 2 2 4 11429 11414 11 100 11329 0.041
H

T&B
28c 12 2 2 4 7229 7214 11 100 7129 0.026
H

T&B
28d 12 2 2 4 11029 11014 11 100 10929 0.039
H

T&B
28e 12 2 2 4 6829 6814 11 100 6729 0.024
H

T&B
28f 12 2 2 4 10629 10614 11 100 10529 0.038
H
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

T&B
28g 12 2 2 4 6429 6414 11 100 6329 0.023
H

T&B
28h 12 2 2 4 10229 10214 11 100 10129 0.036
H

T&B
28i 12 2 2 4 6029 6014 11 100 5929 0.021
H

T&B
28j 12 2 2 4 9829 9814 11 100 9729 0.035
H

T&B
28k 12 2 2 4 5629 5614 11 100 5529 0.020
H

T&B
29 12 2 40 80 7825 7810 11 100 7725 0.555
H

T&B
30 12 2 40 80 11825 11810 11 100 11725 0.839
H

T&B
31 12 2 34 68 3700 3670 21 100 3500 100 0.222
H

T&B
32 12 2 34 68 3700 3670 21 100 3500 100 0.222
H

INNER
33 12 2 20 40 6844 6814 21 1860 3124 1860 0.242
FACE

OUTER
34 12 2 20 40 7556 7526 21 2040 3476 2040 0.267
FACE

OUTER
FACE 35 12 2 72 144 2940 2910 23 150 2190 600 0.372
VER.
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

INNER
FACE 36 12 2 64 128 2940 2910 23 150 2190 600 0.331
VER.

BEAM
37 10 2 8 16 4640 4800 11 1200 1120 0.047
STIRRUP

BEAM
38 10 2 264 528 4440 4600 11 1100 1120 1.497
STIRRUP

BEAM
39 10 2 528 1056 2656 2816 11 208 1120 1.833
STIRRUP

BEAMS
HOR. 40 20 2 8 16 11804 11804 25 2160 7484 2160 0.466
BARS

BEAMS
HOR. 41 20 2 8 16 5166 5166 1 5166 0.204
BARS

BEAMS
HOR. 42 20 2 8 16 4872 4872 1 4872 0.192
BARS

BEAMS
HOR. 43 20 2 8 16 11796 11796 25 2230 7336 2230 0.465
BARS

BEAMS
HOR. 44 20 2 8 16 11800 11800 25 2306 7188 2306 0.466
BARS

BEAMS
HOR. 45 20 2 8 16 4576 4576 1 4576 0.181
BARS

BEAMS
HOR. 46 20 2 8 16 4282 4282 1 4282 0.169
BARS

BEAMS
HOR. 47 20 2 8 16 11801 11801 25 2380 7041 2380 0.466
BARS
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

BEAMS
HOR. 48 20 2 8 16 11793 11793 25 2450 6893 2450 0.465
BARS

BEAMS
HOR. 49 20 2 8 16 3986 3986 1 3986 0.157
BARS

BEAMS
HOR. 50 20 2 8 16 3692 3692 1 3692 0.146
BARS

BEAMS
HOR. 51 20 2 8 16 11796 11796 25 2525 6746 2525 0.465
BARS

BEAMS
HOR. 52 20 2 8 16 11798 11798 25 2600 6598 2600 0.466
BARS

BEAMS
HOR. 53 20 2 8 16 3396 3396 1 3396 0.134
BARS

BEAMS
HOR. 54 20 2 2 4 3396 3396 1 3396 0.034
BARS

BEAMS
HOR. 55 12 2 4 8 5166 5166 1 5166 0.037
BARS

BEAMS
HOR. 56 12 2 4 8 11798 11798 25 2600 6598 2600 0.084
BARS

BEAMS
HOR. 57 12 2 4 8 11804 11804 25 2160 7484 2160 0.084
BARS

BOT 58 12 2 10 20 1633 1603 23 100 933 600 0.028

TOP 59 12 2 10 20 1700 1670 21 100 1000 600 0.030

20.529
* Specified in multiples of 5 ** Specified in multiples of 25 mm.
All Dimension are in Millimeters
PROJECT: DS-203

LOCATION: WARSAN Date prepared: 9-Jun-22 Date checked: 9-Jun-22


AREA/ZONE: GAS HOLDING TANK Prepared by: Z-F Revision: 0
AREA -WARSAN

Length Cut
Type No. No. of
Bar Total of each length of Shape A* B* C* D* E* Weight
Member and of bars in Shape Sketch
mark no. bar ** each bar code mm mm mm mm mm (ton)
size mbrs each
mm ** mm

SUMMARY OF STEEL
SIZE OF
WEIGHT (TON)
BAR
10 3.378
12 12.676
20 4.475
TOTAL 20.529