Professional Documents
Culture Documents
"tB
"
CROSS
E
T-I
CHBWALL
B
TU
IM
NIOUS
LFIER
CHBVERTR.EN I F(S.EE
L/4+12D L/4+12D L/4+12D L/4+12D b SCHEDO
. FREN I F). SLAB
RE
NIFORCEMENT
CONCRETE
LFIER
PIE
A
CHBVERTR.EN I F.
CLR DOWELS(TOMATCH
TOPBARS VERTR
.EN
I F).
d WEBBARS
IUM)
NO
M
5.
(N
NOTE
GAM
P
SEE
BOTTB.ARS MASC
TSIEALANT
CIAL)
T(YP
2B4ARDAI
CLR
L7/ L5/-12D L5/-12D L5/-12D VAPOR
BARR
EIR MAXMIUMDRY
DENS TYI@ OPM TIUM
EXTEROI RCOL N
I RTERO
I RCOL EXTERO I RCOL N
I RTERO
I RCOL WHEN
REQ. MOSITURE
CONTEN M(TA DXE.PTHOF PIE
SLEEVE
COMPRESSEDL2F0P
(I=ER LAYER)
SUPPORT SUPPORT SUPPORT
D
SUPPORT COMPRESS
BILE
MATER
AILS
Ø10@10
WALL BASE REINFORCING AT SLAB ON GRADE CONSTRUCTION
O
E
F.INF.
L2N
(ITERO
I RSPAN) L3(CANTS.PAN)
N
R
L1(ENDSPAN)
C
CHB
WAL
TYPICAL BEAM ELEVATION FLAT FLOOR JOINT DETAIL PIPE PENETRATION THRU WALL DETAIL
Ø10@10
DO
JE
N
RF
T.I
ELASC
TSIEALANT
Ø10@10
O
E
F.INF.
N
R
C
SEE
NOTE
NO
5.
CHB
WAL
N
2(dO
PIE
SLEEVE
SHALBE
S
PC
IE
S.4G
H
0LIE.EVE POLYURETHANE
BACK
NIG FORCO BA
L.RSPC LIES
ALOWED N
W
TIH
S
ZIO
/NTE
(YP
).
MA
NR
IE
NIFORCEMENTS
TO
BE BOTTOM
OC
FONCRETE SEE
TABLEOM FLN
AIP
.
E
2-XTRA
SER
TA
S
ID
.IE
OS
FLEEVE CHB
WAL
CONN
TIOUS SPC
LIE
LENGTH OCFOL.
2d SLAB/EAM
CHEDULE
RE
NIFORCEMENT
TYP. E
2-XTRASE
S
R
D
TA
I.E
COLUM SN
TIN
Øp
SR
M
E
A
P
COLU
A FACE
OF OS FLEEVE
COMPRESS
BILE
FLIER
MATER
AIL
7X
3L560ONG
TOP
BARS SUPPORT TOP
BARS
Ø 1E6XTRA
BARS
E
F. SUPPORT@
120O
C.
ADD
O
TINAØ
L10 Ø
2-1E6XTRA
VER
BT
A.RS
D
A
(IGONALS) CHB
WAL
D
@4C
0. Ø
2-1P0OWER ACTUATED
Ø10@10
CHB VES
R
(ETE
N
S
,.IC
F.HEO
DF. CHVB
E.RTENS
.IF
E,E
STUD ANCHOOR
(R
EQUAL)
O
D
E
F.INF.
N
R
C
PIE
SLEEVE RE
NI)F. RCOLUMN
OR SCHEO DRF.ENIF. CHVB
E.RTS
E
N(.E
IFE
,
Ø 1C
6ROSS ANCHORS
WELDED WAL
SCHED
).
CHBO
.RE NS
.IF
E,E SCHEO DR
F.E NI)F.
BEAM
Ø
1E6XTRABARS TOSLEEVE
S(EE
SCHEODRF.ENIF.
BOBT
A.RS E
F. T(YP) BOBT
A.RS
CLR
4D
A CHB HOR
S(E
N
.E
IS
F.CHEO
DF. Ø
1-1E6XTRA
VERTE
N
.IF.
Ø10@10
FACE OF SAR
TS
P
I.ER
SCHED. SEE
O
JE
N
RF
4M
D
(N
M
IUM) RE
NI)F.
T.I
SUPPORT NOTE
N5O.
4L/ 2L/ 4L/
PIE
SLEEVE
MAX
M
IUMD
AIMETESR
I:
M
LIO
ILTOCAO
TIN
OP
FIE
SLEEVE NOTES:
D
LE
(ASGTOVERNS)
L
WALL REINFORCING
Ø10@10
1. SEEK STRUC ELT
N'GNIEERS APPROVAL
). 51OB
A FEAM
DEPTH
O
E
F.INF.
N
R
C
FOR THE PIE
SLEEVES W
DAIM/ ETERS
10M
B
).M
BGIGER THAN THE MAX M IUM SPTIULATED.
NOTES:
W1=20MAX. 1. YIELDSTRESSOFHOOPS=40KSI
F(OR
W
1=20PLC
UO
S
-NSULS
TTRUCTURAELNGR
). 1
F(OR
W=120PLC
UO
S
-NSULS
TTRUCTURAELNGR
). 2. D=USEMAXIMUMCOLUMNDIMENSION, 6CLEAR
ADD
O
TINA@
Ø
L104C
0.
HEIGHTOR18"(450mm)WHICHEVERISGREATER.
CHB
WAL
3. NUMBEROFHOOPTIESSAMEASPERCOLUMN
N
LITEBLEAMW/ TIESSCHEDULE.
Ø
1-6
COH NO.RE
N
.IF. 4. ALLCONCRETEREINFORCEMENTDETAILSHOULD
H
MA
NR
IE
NIFORCEMENTS
TO
BE WNIDOW
CONN
TIOUS N
LITEBLEAMWTH
IØ
1-1C
6ONN
TIUOUS OPENIG BEDONEINACCORDANCEWITHACIDEATAILING
HOR ZO
INTAR
LENIFORCEMENT
Ø
2-1E6XTRA
VER
BT
A.RS
MANUAL1980PUBSP-66
CHB VERTS
E
N
(.E
IFE
S
.CHEO
DF.
RE
NI)F. 6MM
TH
PK
LA
.TE
ANCHORED TO
t
CONRETE
SLAB
OR
STEETLRUSS
Ø
4-1@ 2180LONGTOP
BARS
BENT
CHB HOR
S(E
N
,.E
IS
F.CHEO
DF.
H
DOWNITO EDGE
BEAM
EX;TEND
BARS OPENIG Ø
1-1A6DD
O
TINAVLERC
TIABLARS
M
ON
)0"-I1F.42'0( RE
NI)F. DOOR Ø
1-16
Ø
1X00LONG
@30mm
O
C. BRACE
ANGLE
6X4MM
@120D
VER
BT
A.RS
OC.
M
NI.
142-Ø
BO
BT
A.RS
SUSPENDED SLAB
IHT
G
LHIE
S
Ø
1-1B6OLTS
CONSTRUCTION JOINT DETAIL CORNER SLAB DETAIL W LG
X
164T3".
FLOOR
N
LIE
NOTO
EM:E
TIXTRA
RE N
FIO
F.R
OPENIG
LESS
THAN
20MM VER
&
40M
T.MHO.R.
"t"
CHB
END
BLOCK
CHB
WAL
D
3/
D
3/
WHERE JO
N
S
AIT
PO
NIO
TSFTRESS,
PROV DIE
SHEARODSUBJECTO GRAVEBLASE SUBGRADECOMPACTED TO
95%
OF
ENGNIEES R
AP
'PROVAL/ VAPORBARR
EIR
tB
MAX
MIUMMO SITURE @OPM
TIUM
"CH"
WHEN
REQ.
BEAM CONSTRUCTION JOINT DETAIL JOINT DETAIL WALL REINFORCING AT CHB END
APPROVED BY: PROJECT: APPROVED BY: NOTED BY: SHEET CONTENT: SHEET NO.