STEP DRAWDOWN TEST

Tube-well Num. TW-10 Date & Time (Start) 15-May-23 1.25 pm


Location Banting Date & Time (End) 15-May-23 6.25 pm
Client Wilmar Palm Products Sdn Bhd
Well Depth 100.0 m Pump Position 40.0 m
Collar Height 0.6 m Static Water Level 6.70 m
Pump Rate 7.8 m3/hr – 22.6 m3/hr

PHASE 1 PHASE 2 PHASE 3 PHASE 4 PHASE 5


3 3 3
Q = 7.8 m3/hr Q = 10.7 m /hr Q = 14.0 m /hr Q = 18.1 m /hr Q = 22.6 m3/hr

Time
(minutes) Water Level Drawdown Water Level Drawdown Water Level Drawdown Water Level Drawdown Water Level Drawdown
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m)

0.00 6.70 0.00 7.33 0.63 7.46 0.76 7.73 1.03 7.91 1.21
0.30 7.04 0.34 7.34 0.64 7.48 0.78 7.80 1.10 8.06 1.36
1.00 7.16 0.46 7.36 0.66 7.54 0.84 7.80 1.10 8.15 1.45
1.30 7.25 0.55 7.39 0.69 7.54 0.84 7.80 1.10 8.15 1.45
2.00 7.25 0.55 7.41 0.71 7.54 0.84 7.80 1.10 8.15 1.45
2.30 7.28 0.58 7.41 0.71 7.54 0.84 7.80 1.10 8.16 1.46
3.00 7.28 0.58 7.43 0.73 7.54 0.84 7.81 1.11 8.18 1.48
3.30 7.28 0.58 7.43 0.73 7.54 0.84 7.81 1.11 8.18 1.48
4.00 7.28 0.58 7.43 0.73 7.54 0.84 7.81 1.11 8.18 1.48
4.30 7.28 0.58 7.43 0.73 7.54 0.84 7.81 1.11 8.18 1.48
5.00 7.28 0.58 7.43 0.73 7.54 0.84 7.81 1.11 8.18 1.48
7.30 7.28 0.58 7.44 0.74 7.58 0.88 7.84 1.14 8.20 1.50
10.00 7.28 0.58 7.45 0.75 7.58 0.88 7.84 1.14 8.21 1.51
15.00 7.28 0.58 7.45 0.75 7.66 0.96 7.87 1.17 8.25 1.55
20.00 7.28 0.58 7.45 0.75 7.66 0.96 7.89 1.19 8.27 1.57
25.00 7.28 0.58 7.45 0.75 7.66 0.96 7.90 1.20 8.30 1.60
30.00 7.28 0.58 7.46 0.76 7.67 0.97 7.90 1.20 8.33 1.63
35.00 7.28 0.58 7.46 0.76 7.70 1.00 7.90 1.20 8.33 1.63
40.00 7.28 0.58 7.46 0.76 7.70 1.00 7.90 1.20 8.35 1.65
45.00 7.32 0.62 7.46 0.76 7.72 1.02 7.91 1.21 8.37 1.67
50.00 7.33 0.63 7.46 0.76 7.73 1.03 7.91 1.21 8.39 1.69
55.00 7.33 0.63 7.46 0.76 7.73 1.03 7.91 1.21 8.39 1.69
60.00 7.33 0.63 7.46 0.76 7.73 1.03 7.91 1.21 8.39 1.69