PACKAGE- ANVS: “CONSTRUCTION OF VIADUCT, RAMP & UNDER
GROUND RCC BOX (CUT & COVER, BOX PUSHING) INCLUDING
RELATED WORKS FOR 3.520 KM LENGTH FROM CH. 25891.527 TO
CH. 29410.989 BETWEEN EXISTING PIER CP-760 (NEAR CITY CENTRE-
II) TO MERGING POINT WITH METRO RAILWAY AT BIMAN BANDAR
STATION YARD INCLUDING TWO STATIONS (RABINDRA TIRTHA &
R
Document No.
BIDDING DOCUMENTS
For
Execution of
L
WORKS FOR 3.520 KM LENGTH FROM CH. 25891.527 TO CH. 29410.989
BETWEEN EXISTING PIER CP-760 (NEAR CITY CENTRE-II) TO MERGING
POINT WITH METRO RAILWAY AT BIMAN BANDAR STATION YARD
INCLUDING TWO STATIONS (RABINDRA TIRTHA & VIP ROAD) WITH ALL
VN
ALLIED WORKS (ARCHITECTURAL, ELECTRICAL, MECHANICAL, HEATING,
VENTILATION, AIR CONDITIONING, FIRE DETECTION, FIRE SUPPRESSION
SYSTEM & PUBLIC HEALTH ENGINEERING WORKS) IN NEWGARIA-
BIMANBANDAR METRO CORRIDOR OF KOLKATA METRO RAILWAY LINE,
WEST BENGAL”.
Preamble Introduction
02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
TABLE OF CONTENTS
Preamble
Introduction
Section 5.
L
VN
R
VOLUME-I
L
PART I: Bidding Procedures through e-
tendering mode
VN
&
PART III: Conditions of Contract and
Contract Forms
R
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
PART I
BIDDING PROCEDURES
NOTICE
FOR
(IFB)
VN
(through e-Tendering mode)
R
Preamble Introduction
02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
1. RAIL VIKAS NIGAM LIMITED (RVNL), having its Corporate office at 1st Floor
August Kranti Bhavan, Bhikaji Cama Place, New Delhi – 110066, India which is a
Public Sector Enterprise set up as a wholly owned Government Company under
the provisions of Section 617 of Companies Act., invites bids under single stage
two packet system for the work of PACKAGE- ANVS ““CONSTRUCTION
CONSTRUCTION OF
VIADUCT, RAMP & UNDER GROUND RCC BOX (CUT & COVER, BOX
PUSHING) INCLUDING RELATED WORKS FOR 3.520 KM LENGTH FROM
2.
Sl. Approx. Estimated Cost Period of
Bid Security
No. of Project Completion
R
3. Bidders are advised to note the eligibility and minimum qualifying criteria
specified in the Instruction to Bidders and Section 3 “Evaluation and
Qualification Criteria” of bid document.
4. Bids must be accompanied by a bid security of Rs. 2.00 Crores (Rupees two crores
only) in any one of the forms as specified in the bidding documents and shall have to
be valid for 42 days beyond the validity of the bid.
Preamble Introduction
02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
.
L
ff bid along with all Addendum/Corrigendum
VN
6. Purchase Preference to o Make in India: The pro pr
provisions
o of revised ‘Public
Procurement (Preference to Make in India) Order 2017’ issued by Department of
Promoti
Industrial Policy and Promoti
Promoti
BE-II)
BE-II) dated 28.05.2018 shall be applicable to the
bidding process and award of the contract shall be done accordingly. In this
connection, the minimum local content shall be 50% and the margin of purchase
preference shall be 20%. For award of contract, para 3.c. of the revised ‘Public
Procurement (Preference to Make in India) Order 2017’ shall be applicable in addition
to the other provisions in the bidding documents in this regard.
R
8. Purchase Preference: Shall not apply to Central Public Sector Enterprises, as per
extant rules in force.
9. REGISTRATION
Bidders are advised to register their valid email address and mobile numbers as
part of the registration process. These would be used for any communication
with the bidder.
Upon enrolment, the bidders will be required to register their valid Digital
Signature Certificate (Only Class III Certificates with signing + encryption
key usage) issued by any Certifying Authority recognized by CCA India (e.g.
Sify / TCS / nCode / eMudhra etc.), with their profile.
Only one valid DSC should be registered by a bidder. Please note that the
DSC to others
bidders are responsible to ensure that they do not lend their DSCs
which may lead to misuse.
L
Bidder then logs in to the site through the secured log-in by entering their user
ID/password and the password of the DSC / e-Token.
There are various search options built in the e-bid Portal, to facilitate bidders
to search active bids by several parameters. These parameters could include
R
Once the bidders have selected the bids they are interested in, the bidder can
pay the processing fee of Rs. 7500 + 18 % GST-/ (NOT REFUNDABLE) by
net-banking / Debit / Credit card and then download the required documents /
bid schedules, Bid documents etc. Once processing fee is paid, it will be
moved to the respective “requested” Tab. This would enable the e-bid Portal to
intimate the bidders through e-mail in case there is any addendum and
corrigendum issued to the bidding document.
/JPEG formats. Bid Original documents may be scanned with 100 dpi with
Colored option which helps in reducing size of the scanned document.
To avoid the time and effort required in uploading the same set of standard
documents which are required to be submitted as a part of every bid, a
provision of uploading such standard documents (e.g. PAN card copy, annual
reports, auditor certificates etc.) has been provided to the bidders. Bidders can
use “My Documents” available to them to upload such documents.
These documents may be directly submitted from the “My Documents” area
while submitting a bid, and need not be uploaded again and again. This will
lead to a reduction in the time required for bid submission process.
Bidder should log into the website well in advance for the submission of the
bid so that it gets uploaded well in time i.e. on or before the bid submission
time. Bidder will be responsible for any delay due to other issues.
L
The bidder has to digitally sign and upload the required bid documents one by
one as indicated in the bidding document.
All the documents being submitted by the bidders would be encrypted using
PKI encryption techniques to ensure the secrecy of the data. The data entered
cannot be viewed by unauthorized persons until the time of bid opening. Data
storage encryption of sensitive fields is done. Any bid document that is
uploaded to the server is subjected to symmetric encryption using a system
R
Upon the successful and timely submission of bid click “Complete “(i.e. after
Clicking “Submit” in the portal), the portal will give a successful Bid
submission acknowledgement & a bid summary will be displayed with the
unique id and date & time of submission of the bid with all other relevant
details.
12. Date of Receipt and opening of Bids: The completed Bids must be submitted
through e tendering portal https://rvnl.euniwizarde.com/ before 11.00 hrs. on
31/07/2020 and the same shall be opened at 11.30 hrs on same day.
13. Address for Communication: Interested eligible Bidders may obtain further
information from the following address:
L For any Query regarding e tendering portal / Bid submission please contact
helpdesk Number 011-49606060, Email helpdeskeuniwizarde@gmail.com,
helpdeskeuniwizarde@gmail.com Mr
Abhinav Bharat - +91 9355030601 and Mr Satyam Kumar Rai +91
9355030633
VN
R
Preamble Introduction
02.05.2020 for e-tendering
Section 1
L
VN
Instructions to Bidders
(ITB)
R
Page Intentionally
L
VN
Left Blank
R
RVNL/KOL/New Garia-Airport/Metro/ANVS e 2020
Ta e o C a e
A. Ge era ............................................................................................................................................ 2
1 co e of Bi 2
2 ource of Fun s 2
3 Corru t Practices 2
ligi le Bi ers 3
5 ligi le aterials, ui ment an ervices 6
B. Co te t o Biddi Do e t ..................................................................................................... 6
9 Cost of Bi ing 8
10 anguage of Bi 8
11 Documents Com rising the Bi 8
12 etters of Bi an Price che ules 9
13 Alternative Bi s 9
1 Bi Prices an Discounts 9
L
15 Currencies of Bi an Pa ment 10
16 Documents Com rising the Technical Bi 10
17 ualifications of the Bi
Documents sta lishing the ualifications er 10
18 Perio of ali it of Bi s 10
19 Bii ecurit 11
VN
20 Format an igning of Bi 12
26 Confi entialit 1
R
27 Clarification of Bi s 1
28 Deviations, eservations, an missions 1
29 Determination of es onsiveness 15
30 Nonconformities, rrors, an missions 15
31 Pre- ualification of the Bi er 15
32 Correction of Arithmetical rrors 16
33 Conversion to ingle Currenc 16
3 Purchase Preference 16
35 valuation of Bi s 16
36 Com arison of Bi s 18
37 m lo er s ight to Acce t An Bi , an to eject An or All Bi s 18
L
c a means calen ar a
L
Attorney (Form given in Section 4) who shall have the
authority to conduct all business for and on behalf of any
and all the parties of the JV during the bidding process
and, in the event the JV is awarded the Contract, during
VN
contract execution.
(iv) Submit Power of Attorney by individual partners to lead
partners as per form given in Section 4.
(v) In case a Joint Venture is the successful bidder, the Joint
Venture Agreement should be entered by the Joint Venture
partners. The duly signed Joint Venture Agreement
should be submitted along with the Performance Security
to the employer after notification of the award of contract
within 28 days.
R
(c)
(d)
(e)
(f)
(g)
L
stage of the insolvency process
On the deadline of submission of bids or thereafter till
finalization of bids.
VN
e The bidder is found ineligible by the Employer, in
accordance with ITB-3.
OR
The bidder or its constituent(s) has been declared by
RVNL to be a poor performer at any time after the
R
B. Co te t o Biddi Do e t
L
ection 1 nstructions to Bi ers TB
Vo e-II
Bill of uantities B
63 The m lo er is not res onsi le for the com leteness of the Bi ing
Document an their A en a, if the were not o taine irectl from the
source state the m lo er in the nvitation for Bi s
L
visiting the
into a contract for construction of the orks The costs of vis
ite shall e at the Bi er s own ex ense
7 atten a re- i
The Bi er s esignate re resentative is invite to atte
meeting, if rovi e for in the BD either in erson or through vi eo
conferencing The ur ose of the meeting will e to clarif ississues
an to answer uestions on an matter that ma e raise at tha that
stage
R
76 inutes of the re- i meeting, inclu ing the text of the uestions
raise , without i entif ing the source, an the res onses given,
together with an res onses re are after the meeting, will e
transmitte rom tl to all Bi ers who have ac uire the Bi ing
Document in accor ance with TB 6 3 An mo ification to the
Bi ing Document that ma ecome necessar as a result of the
re- i meeting shall e ma e the m lo er exclusivel through
the issue of an a en um ursuant to TB 8 an not through the
minutes of the re- i meeting
Do e t
C. Preparatio o Bid
9. Co t o Biddi 91 The Bi er shall ear all costs associate with the re aration an
su mission of its Bi , an the m lo er shall not e res onsi le or
lia le for those costs, regar less of the con uct or outcome of the
i ing rocess
L
accom anie an accurate translation of the relevant assages in
nglish in which case, for ur oses of inter retation of the Bi , such
translation shall govern
12. Bid Letter a d 12 1 The Bi er shall su mit the Technical Bi an the Price Bi online
Pri e S ed e through e ten ering ortal using a ro riate letter formats
furnishe in ection Bi ing Forms These forms must e
com lete without an alterations to their format, an no
su stitutes shall e acce te All lank s aces shall e fille in
with the information re ueste
13. A ter ati e Bid 13 1 nless otherwise in icate in the BD , alternative i s shall
sh not e
consi ere
L
13 2 hen alternative erio s for com letion are ex licitl inv
invite , a
statement to that effect will e inclu e in the BD , as will tthe
metho of evaluating ifferent erio s for com letion
VN
14. Bid Pri e a d 1 1 The rices uote the Bi er online in the summar shee
sheet of Bill
Di o t of uantities shall conform to tthe
he re uirements s ecifie elow
1 2 n the B , uantit an unit rates an there the amount
against each item have een in icate From this, rice of each
sche ule ill has een worke out an in icate in the summar
sheet in B The Bi er shall uote rates as single ercentage
a ove elow at ar in figures as er format for each sche ule ill
sheet. T e rate
in the summar sheet oted t e idder i
ar eet wi o e o idered or e a atio o
id . Rate o ered t ro a ot er edi or at a
ot er o atio wi ot e o idered.
R
1 3 Delete
1 8 Bi ers shoul note that uring the rogress of the orks, the
foreign currenc re uirements of the outstan ing alance of the
Contract Price ma e a juste agreement etween the
m lo er an the Contractor in or er to reflect an changes in
foreign currenc re uirements for the Contract, in accor ance
with u -Clause 1 15 of the Con itions of Contract An such
a justment shall e effecte com aring the ercentages
uote in the i with the amounts alrea use in the orks
an the Contractor s future nee s for im orte items
1 9 Bi er shoul note that non-su mission of the etter of Price
Pr Bi
L
PB an or ummar sheet of B the i er shall result in
summar rejection of his i
Technical
16 3 The Bi er shall furnisha commitment in etter of Technica
R
18. Period o Va idit 18 1 Bi s shall remain vali for a erio of 120 a s after the i
o Bid su mission ea line ate rescri e the em lo er A i
ection 1 nstructions to Bi ers Page 10 of 19
(Based on SBD updated upto 02 05 2020 for e-ten ering)
RVNL/KOL/New Garia-Airport/Metro/ANVS e 2020
19. Bid Se rit 19 1 nless otherwise s ecifie in the BD , the Bi er shall furnish as
art of its i , a i securit for the sai amount of n ian
u ees as s ecifie in the BD
L
from a ank having minimum net worth of over N 500
million from the s ecifie anks as un er
i a che ule Bank in n ia, or
ii a Foreign Bank having their o erations in n ia, or
VN
iii a Foreign Bank which o not have o erations in
n ia is re uire to rovi e a counter-guarantee
tate Bank of n ia,
The i securit shall e vali u to the ate as mentione in
BD , or u to the ate mentione in the letter of re uest for
extension, if an un er TB 18 2
n case the i er has o te for Bi securit in the form of an
uncon itional Bank guarantee, the i er shoul u loa the
scanne co of Bank uarantee with the i The original
Bank Guarantee should be delive
delivered in person to the official
nominated as indicated in the bid data sheet within 5 working
R
days
day
da yss of deadline of submission of bids. Non submission of
scanned copy of Bank Guarantee with the bid on e-tenderin
e-tendering
portal and/or non submission of original Bank Guarantee
within the specified period shall lead to summary rejection of
bid. The details of the BG, physically submitted should match
with the details available in the scanned copy and the data
entered during bid submission time, failing which the bid will
be rejected
L
19 6 The Bi ecurit of a shall e in the name of the that
th
su mits the i f the has not een legall constitute at the
time of i ing, the Bi ecurit shall e in the names of all
future artners as name in the letter of intent mentione in TB
VN
1
20 3 D T D
D. S i io a d Ope i o Bid
R
21 2 D T D
21 3 D T D
21 D T D
21 5 D T D
23. Late Bid 23 1 The e-Ten ering ortal cannot acce t an i once the ea line
for the ten er su mission has la se
a D T D
D T D
L
2 2 D T D
etw
2 3 No i ma e with rawn, or mo ifie in the interval etween the
ea line for su mission of i s an the ex iration of the erio
of i vali it s ecifie the Bi er on the etter of Bi or an
VN
extension thereof
25. Bid Ope i 25 1 The m lo er shall con uct the o ening of Technical Bi sthrough
sth
e-ten ering ortal of N i e htt s rvnl euniwi ar e com
e
25 2 The Price Bi s will remain uno ene until the time of o ening of
the Price Bi s The ate, an time, of the o ening of Price Bi s
will e announce through e- ten ering ortal
25 3 D T D
25 D T D
R
25 5 D T D
25 6 D T D
25 7 D T D
25 11D T D
25 12D T D
L
officiall concerne with such rocess until information on
Contract awar is communicate to all Bi ers
en
26 3 Notwithstan ing TB u -Clause 26 2, from the time of o ening the
Technical Bi s to the time of Contract awar , if an Bi er
wishes to contact the m lo er on an matter relate to the
i ing rocess, it shoul o so in writing
27. C ari i atio o 27 1 To assist in the examination, evaluation & comparison and pre-
Bid qualification of the Bids, the Employer may, at its discretion, ask
R
L
29 3 The m lo er shall examine the technical as ects of th the i
su mitte in accor ance with TB 16, Technical Bi , in articular,
articul
to confirm that all re uirements of ection 5 orks
e uirements have een met without an material eviation or
VN
reservation
30 3 Delete
31. Pre- a i i atio o
31 1 The m lo er shall etermine to its satisfaction uring the
t e Bidder
evaluation of Technical Bi s whether Bi ers are ualifie to
erform the Contract satisfactoril
31 D T D
31 5 D T D
L
f D T D
g D T D
32 2 D T D
VN
33. Co er io to 33 1 For evaluation an com arison ur oses the currencies of tthe i
Si e C rre shall e converte into n ian
ian u ees as state in BD
L
securit e ual to the 0 9x engineer s estimate rice 1
rice or 0 95 x 2 rice 1 rice whichever is lower, on
this account xam le elow emonstrates the metho of
calculation to arrive at a itional erformance securit
VN
u ose overall rice uote the 1 i er is 17 elow
the estimate rice an the overall rice uote 2 i er
is 8 elow the estimate rice n this case the overall
rice uote the 1 i er is lower more than 10 of
the estimate rice an also the ifference etween overall
rice uote the 2 an 1 i er is more than 5 of the
estimate rice, hence the 1 i er shall e re uire to
furnish a itional erformance securit for an amount e ual
to
0 9 x engineer s estimate rice 1-17 100 x engineer s
estimate rice 0 07 x engineer s estimate rice 7
of engineer s estimate rice or 0 95 x 1-8 100 x
R
36. Co pari o o 36 1 The m lo er shall com are all su stantiall res onsive i s to
Bid etermine the lowest evaluate i , in accor ance with TB 3
an 35.
L
F. Award o Co tra t
38. Award Criteria 38 1 The m lo er shall awar the Contract to the Bi er whose i is
su stantiall res onsive to the Bi ing Document, rovi e
erfor
further that the Bi er is etermine to e ualifie to erform
VN
the Contract satisfactoril an whose offer has een etermine
to e the lowest evaluate su ject to TB 38 2 elow n case o of
more than one i s are evaluate to e lowest, Contract shall e
awar e to the i er having higher average annual construction
turnover calculate as total certifie a ments receive for
contracts in rogress or com lete in e uivalent N within th the
last three financial ears
39. Noti i atio o 39 1 Prior to the ex iration of the erio of i vali it , the m lo er
Award shall notif the successful Bi er, in writing, that its i has een
acce te the Com etent Authorit at N s Cor orate
ffice at Delhi or CP s ffice The notification letter
hereinafter an in the Con itions of Contract an Contract
Forms calle the etter of Acce tance shall s ecif the sum
that the m lo er will a the Contractor in consi eration of the
execution an com letion of the orks hereinafter an in the
Con itions of Contract an Contract Forms calle the Contract
Price an the re uirement for the Contractor to reme an
efects therein as rescri e the Contract
39 2 ntil a formal contract is re are an execute , the notification of
ection 1 nstructions to Bi ers Page 18 of 19
(Based on SBD updated upto 02 05 2020 for e-ten ering)
RVNL/KOL/New Garia-Airport/Metro/ANVS e 2020
L
Bi Data heet shall have exclusive juris iction over all the
connection
is utes issues arising un er, ursuant to an or in connectio
with the i ing rocess
VN
R
RVNL/KOL/New Garia-
Airport/Metro/ANVS Dated 15.06.2020
ITB 7.4 A Pre-Bid meeting takes place at the following date, time and place:
Date: 01/07/2020.
Time: 11.30 hrs
Section 2: Bid Data Sheet Page 1 of 9
02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
L
VN
R
The bid security shall be valid up to 09/01/2021. The original Bank
Guarantee should be submitted to Chief Project Manager/KOL-II, Rail Vikas
Nigam Limited, 24, Deshpran Shashmal Road (Besides Tollygunge Railway
Station), Kolkata-700033, West Bengal, India.
Tel: 033-24247330, Fax: 033-24247332
For bid submission purposes e-Tendering website address is:
https://www.rvnl.euniwizarde.com
The deadline for bid submission is:
Date: 31/07/2020.
Time: 11:00 hrs.
The online bid opening shall take place at e tendering portal of RVNL
rvnl.euniwizarde.com:
Bid Opening:
Date: 31/07/2020.
Time: 11:30 hrs.
L The Employer shall award the Contract to the Bidder whose bid is
substantially responsive to the Bidding Document, provided further that the
Bidder is determined to be qualified to perform the Contract satisfactorily
and whose offer has been determined to be the lowest evaluated subject to
VN
ITB 38.2 and ITB 43 below. In case of more than one bids are evaluated to
be lowest, Contract shall be awarded to the bidder having higher average
annual construction turnover (calculated as total certified payments
received for contracts in progress or completed) in equivalent INR within
the last three financial years
Preference to
Make in India (Preference to Make in India) Order 2017’ issued by
Department of Industrial Policy and Promotion under
Ministry of Commerce and Industry vide letter no. P-
45021/2/2017-PP (BE-II) dated 28.05.2018 shall be
applicable to the bidding process and award of the
contract shall be done accordingly. In this connection,
the minimum local content shall be 50% and the
margin of purchase preference shall be 20%. For award
of contract, para 3.c. of the revised ‘Public
Procurement (Preference to Make in India) Order
2017’ shall be applicable in addition to the other
provisions in the bidding documents in this regard.
ANNEX-1 to Section-
2(BDS)
L
VN
R
L
VN
R
L
VN
R
L
VN
R
L
VN
R
L
VN
R
L
aluation and ualification riteria
VN
( )
R
Page Intentionally
L
VN
Left Blank
R
RVNL/KOL/New Garia-Airport/Metro/ANVS e 2020
CONTENTS OF E C
10 valuation 2
12 ulti le Contracts 2
1 Technical Alternatives 2
15 argin of Preference 2
20 ualification 3
L
21 ligi ilit 3
22 Financial ituation 3
VN
23 x erience 5
2 Personnel 9
25 ui ment 9
26 ecialist su -contractor s 9
R
E a atio
na ition to the criteria liste in TB 3 2 a - e , the following criteria shall a l
1.1. Ade a o Te i a Propo a
valuation of the Bi er s commitment to mo ili e ke e ui ment an ersonnel for the contract
consistent with the re uirements sti ulate in ection 5 orks e uirements regar ing work
metho s, sche uling, an material sourcing
1.3. Co p etio Ti e
Alternative Com letion Time is not ermitte
L
1.5.1. P r a e Pre ere e to Ce tra P i Se tor
or E terpri e (CPSE )
2. a i i atio
2.1 E i i i it
Criteria Co p ia e Re ire e t Do e t
Si e oi t Ve t re S i io
E tit A Part er Ea Part er Lead Part er Re ire e t
Co i ed
2.1.1 Co i t o I tere t
No Conflict of interest in ust meet xisting or ust meet ust meet etter of
accor ance with TB u - re uirement inten e re uirement re uirement Technical Bi
Clause 3 must meet Form P 1
re uirement
L
o
The share of artners N A 100 25 50 or
shall not e less than the Agreement
s ecifie ercentage Form r
5
VN
2.1.3 Di a i i atio o Bidder
Not Dis ualifie un er ust eet xisting or ust meet ust meet etter of
Clause of TB e uirement inten e re uirement re uirement Technical Bi
must meet Form P 1
re uirement
Affi avit
Form P 3
2.2 Fi a ia Stat
R
Criteria Do e t
Co p ia e Re ire e t
oi t Ve t re S i io
Si e
Re ire e t A Part er Ea Lead Re ire e
E tit
Co i ed Part er Part er t
2.2.1 Hi tori a Fi a ia Per or a e
u mission of au ite alance
sheets for the last five financial ust meet Not ust meet ust meet Form F N 1
ears refer note elow the ta le re uirement a lica le re uirement re uirement with
to emonstrate the current attachments
soun ness of the Bi ers financial
osition As a minimum criteria,
Profit Before Tax PBT shoul e
ositive for two financial ears out
of last five financial ears
inimum average annual ust meet ust meet ust meet ust meet Form F N 2
inimum average Net- orth Total ust meet ust meet ust meet ust meet Form F N
Assets Total ia ilities shoul not e re uirement re uirement At least 25 At least 70 1
less than INR 105.32 Crore uring of the of the
the last three financial ears 2017-18, re uirement re uirement
2018-19, 2019-2020 refer note elow
the ta le
L
Availa le Bi ca acit A x N x 1 5 0 33
x N x B , shoul e more than the total ust meet ust meet ust meet ust meet Form F N
stimate rice where, re uirement re uirement At least 25 At least 70 2 3
of
of the of the
A aximum value of works execute in
re
re uirement re uirement
VN
an one ear uring the last 5 ears which
will take into account the com lete as well
as works in rogress total contract
recei ts
B Total value of existing commitments
irres ective of the com letion erio of
those works in case i er or artner of
has existing commitment through another
, then the commitment will e taken in
ro ortion to the share of the Bi er in the
an
N Num er of ears rescri e for
com letion of works in the resent i
R
Note n the event that the au ite accounts for the latest co conclu e Financial ear are not
availa le, the Bi er shall furnish information ertaining to tthe last five financial ears after
ignoring the latest conclu e financial ear n case the i er su mits au ite financial
information for the last six or more ears, onl the figures fo
for the latest five ears shall e
consi ere for evaluation
2.3. E perie e
Criteria Co p ia e Re ire e t
oi t Ve t re Do e t
Si e A S i io
Re ire e t Ea Lead Re ire e t
E tit Part er
Part er Part er
Co i ed
2.3.1 Spe i i Co tr tio E perie e
L
su mission of the i s, an that
is similar to the ro ose work
The similar work here shall e
that which inclu es atleast the
VN
uantit of one of the ke
activities mentione elow
i Construction an launching of
Precast P C gir ers la an or
Com osite ir ers of 22 or longer
s ans with total length of such
s ans eing 1600 or more in
ailwa oa etro ail Bri ges
inclu ing ia ucts
ii xecution of 20000 R of
installation of ile of ia of 1000 mm
or more in ailwa oa etro ail
R
OR
xecution as contractor, or
su contractor, at least Two
contracts, each with a value of at
least INR 184.32 Crore that
have een successfull or are
su stantiall com lete within
the last even ears efore the
ea line for the su mission of
the i s, an that are similar to
the ro ose work ach similar
work here shall e that which
inclu es at least the uantit of
one of the ke activities
mentione elow
i Construction an launching of
Precast P C gir ers la an or
Com osite ir ers of 22 or longer
s ans with total length of such
s ans eing 800 or more in
ailwa oa etro ail Bri ges
inclu ing ia ucts
ii xecution of 10000 R of
installation of ile of ia of 1000 mm
or more in ailwa oa etro ail
Bri ges inclu ing ia ucts
2.3.1 ( ) Co tr tio
E perie e i Ke A ti itie
xecute uring the last
even ears rior to the
a lications su mission
L
ea line
For the contracts as er 2 3 1 must must ust ust eet Form P-
a a ove an or other meet meet eet re uireme 2
contracts a minimum
VN
all all re uire nt of
construction ex erience in the ment of atleast
re uire re uirem
following ke activities atleast one of the
ments ents
one of Ke
i. Construction an launching of the activities
P C gir ers la an or Ke
Com osite gir ers of 22 M or activitie
longer s ans with total length s
of such s ans eing 640 M or
more in ailwa roa metro
rail ri ges inclu ing
via ucts in 1 ear
R
Note -
1 a For the ur ose of value of work for the ast ex erience of a firm in a in su clause 2 3 1 a cre it
shall e given in ro ortion of the ercentage share of the firm in that F For ast ex erience of ke
activities in su clause 2 3 1 a cre it shall e given for execution of the uantit of that s ecific
activit execute the firm as art of a , ul certifie the m lo er f the m lo er s Certificate
oes not in icate the s ecific uantit of ke activit activities
ies execute each artner, in such a case
cre it for uantit of each ke activit shall e given as er following rovisions iin or er of riorit
i As er etails given in agreement forming art of the relevant
relevant Contract Agreement
ii f agreement oes not rovi e such etails, then cre it shall e given in ro ortion of the
ercentage share of the firm in that
L
n case a uoting for the ten er has execute similar wo
work
rk s ecifie in 2 3 1 a an construction
ex erience in ke activities s ecifie
ifie un er 2 3 1 , with the same constitution of , the re uirement
s ecifie to e met un er su clause 2 3 1 a consi ere to have een met treating the
shall e consi
as a single entit for this ur ose
VN
2 Delete
3 For u -clause 2 2 2 Average Annual Construction Turnover, the Bi er shoul su mit actual
construction turnover figures for the s ecifie financial ears For valuation ur oses the figures of
revious ears shall e u ate 5 er ear com oun e annual
annuall ase on u ee value to ring
them to the level of the last Financial
Financial ear s ecifie in su -c-clause f the figure for turnover in an
in ivi ual ear is in a currenc other than N , then the same shall first e converte to N ase on
the exchange rates u lishe eserve Bank of n ia nternati
nternational onetar Fun in that or er as
on last a of that ear an then the figures in N shall e u ate as mentione a ove
For u -clause 2 3 1 ecific Construction x erience, the Bi er shoul su mit actual alue of ork
com lete su stantiall com lete lete valuation ur oses shall e u ate ase on
alue of ork for valuati
R
u ee value to ring them to the rice level of ate of ea line for su mission of i s as er formula
given elow -
A B 1+ 5 36500 x N
here
A u ate value of work on ea line for su mission of i s
B value of work on the ate of com letion su stantial com letion as in icate in the m lo er s
certificate
N Num er of a s etween ate of com letion an ea line for su mission of i s
The ase ate for u ating ur ose shall e consi ere as the ate of com letion of work as certifie
the ngineer-in Charge
n case value of the work is mentione in a currenc other than N , then the same shall first e
converte to N ase on the exchange rates u lishe eserve Bank of n ia nternational
onetar Fun in that or er as on the ate of com letion su stantial com letion of the work an then
the figures in N shall e u ate as mentione a ove
5 The hrase su stantial com letion use in clause 2 3 1 a shall mean where the em lo er has
certifie
(i) f the criteria is eing met through a single contract as er statement su mitte the i er as
re uire vi e Para vi elow , then the uantit execute shall e ivi e the num er of
months from start of execution of activit u to the en of execution of activit an multi lie 12
to arrive at the uantit execute in a ear if the erio of execution is less than 12 months, the
same will e taken as 12 months for calculation ur oses to esta lish whether the criteria is
eing met
(ii) f the criteria is eing met through multi le contracts as er
er statement su mitte the i er as
re uire vi e Para vi elow , then the uantities execute throughthrough these contracts will e a e
an the sum shall e ivi e num
um er of months for the erio starting from earliest month of
start of execution of the activit in an of the contracts an en ing with the latest month of
execution of the activit in an of the contracts, as er em lo er s certification n case the erio
etween the earliest start month an latest finish month is less than 12 months, it will e taken as
12 months for calculation ur ose This average will then e multi lie 12 to arrive at uantit
L
execute in a ear to esta lish whether the criteria is eing met
met
(iii) n case em lo er s certificate oes not in icate start en mon
month
th of execution of the ke activit
then start en month of contract shall e consi ere as the sta
start
rt en month of execution of the
ke activit
VN
(iv) Delete
(v) For the contracts starting more than seven ears rior to the ea line for su mission of i s an
where em lo er s certificate oes not clearl in icate uantit of a articular ke activit execute
uring last seven ears rior to the ea line for the su mission of i s, in such a case, uantit
consi ere to e execute uring the erio of the such contract
contrac falling within last seven ears
shall e worke out on ro orti onate asis i e
ortionate a l ing ratio
ra of erio of contract falling in last
seven ears to total erio of the contract or erio of execution
execut of ke activit falling in last seven
ears to total erio of execution of the ke activit as given in em lo er s certificate as the case
ma e Provisions of note i a ove shall also a l to case cases where erio falling within last
seven ears is less than 12 months
R
a n case of ailwa ri ges etro via uct, accommo ating multi le tracks, the length of s an for
each track shall e taken into consi eration n case of oa ri ges accommo ating multilanes,
the cre it for length of one s an shall e given for ever two lanes
The cre it for multi le tracks multilane shall e given onl if the num er of tracks or num er of
lanes is s ecificall mentione in the certificate of the em lo er, otherwise cre it shall e given for
single track lane onl
8 Delete
9 Delete
The Bi er must give an un ertaking to rovi e at least the ersonnel for the ke osition as given
in ection 5 orks e uirement, if he is awar e the contract
2.5. E ip e t
The Bi er must give an un ertaking to rovi e at least the ke e ui ment for execution of the
work as given in section 5 orks e uirement- co e of ork Ch-1, if he is awar e the contract
L
houl have com lete the Ke Activit for num er of
I elevate un ergroun station or
etro tations or Air ort or ailwa stat
ultistorie Commercial or Pu lic uil ing mentione elow whic
which
is are successfull commissione
a P Pu lic ealth 1 No
VN
ngineering
Architectural Finishing 1 No
works
c tation ignage orks 1 No
orks 1 No
B roofing one
Note f the contract is awar e to the i er an he himself oes not have re uisite ex erience as
a ove, he is re uire to enter into legall enforcea le agreement
agreeme with the s ecialist su -
contractor at least one month rior to sche ule starting of Ke activit as er rogram
su mitte him as contractor an agree the ngineer The agreement must s ecif
the s ecific role an res onsi ilit of the su contractor
This ection contains the forms which are to e com lete the Bi er an su mitte as art of his
Bi
Ta e o For
S ........................................................................................
ed e .............................................................................................................................................
For
PC/1.. .. .. .....................9
.......
Bid Se rit For :
L
BDF/1 .. .....................
.....................10
Letter o Bid
Bidder
a i i atio . .. . ........... 26
For ELI - 1: Bidder I or atio S eet ... .
......................27
For ELI - 2: V I or atio S eet ... ...................................28
........
For FIN - 1: Fi a ia Sit atio ... ........
...................................29
For FIN - 2: A a Co tr tio T r o er or t e a t 5 ear ............................31
For FIN - 3: C rre t Co tra t Co it e t . 32
For EXP 2(a): Spe i i Co tr tio E perie e . . ...33
For EXP 2( ): Spe i i Co tr tio E perie e .. . 34
E C For No.1 . .. .35
FORM NO. 2 CHECKLIST FOR CLAUSES PERTAINING TO SUMMARY RE ECTION OF BID.......36
For : PS 1
Letter o Te i a Bid
Date
nvitation for Bi No
To
L
g e, inclu ing an su contractorstors or su liers for an art of the contract, o not have an
conflict of interest in accor ance with TB 3
h e are not artici ating, as a Bi er or as a su contractor,
contractor, in more than one i in this i ing
rocess in accor ance with TB 3, other than alternative offers su mitte in accor ance with
TB 13
VN
i e eclare that we are not lia le to e is ualifie in Accor Accor ance with TB , an we are
enclosing the affi avit for the same as er the Performa given in the i ocument
j e un erstan that this i , together with our written acce acce tance thereof inclu e in our
notification of awar , shall constitute a in ing contract etween
etween us, until a formal contract is
re are an execute an
k e have not ma e an eviations from the re uirement of the i ing ocument an we have
also not ma e an tam ering or changes in the i ing ocuments ocumen on which the i is eing
su mitte an if an tam ering or changes are etecte at an stage, we un erstan the i
will invite summar rejection an forfeiture of i securit the th contract will e lia le to e
terminate along with forfeiture of erformance securit , even if A has een issue
l f our i is acce te , we o t to take a ment into the ank an account, nominate us
r
f our i is acce te , we o t to take a ment through etter o of Cre it C arrangement as er
R
CC clause 1 7 1 an we here affirm having rea over an agree agr to the terms an
con itions of the C o tion e also un erstan that the o tion of taking a ment through C
arrangement, shall e final an no change shall e ermitte , tthereafter, uring execution of
contract
[Delete whichever is not applicable. In case the bidder fails to delete one of the two options
above, the option of payment into the bank account, nominated by the contractor shall prevail]
Name
n the ca acit of
igne
Dul authori e to sign the Bi for an on ehalf of
Date
L
VN
R
For : PS 2
To
L
a titie ,
e un erstan that this i , together with our written acceacce tance thereof inclu e in
our notification of awar , shall constitute a in ing contract etween us, until a formal
VN
contract is re are an execute an
f evaluate
e un erstan that ou are not oun to acce t the lowest e i or an other i
that ou ma receive
R
Name
n the ca acit of
igne
Dul authori e to sign the Bi for an on ehalf of
Date
For : PS 3
L
De artments or inistr of ailwa s or N at an
time an or no such lacklisting is in force as on the ea line
for su mission of i s
VN
2 That none of the revious contracts of the i er or an of its
constituents ha een terminate rescin e for Contractor s
failure or art terminate for its failure as a artner with
forfeiture of its full Performance ecurit , ail ikas
Nigam t uring the erio of last 3 ears efore the
ea line for su mission of i s
L
conclu e financial ear has not een finali e till ate an
that is wh we are furnishing financial ata for last three
financial ears ignoring the latest conclu e financial ear
VN
(# - Delete whichever is not applicable)
13 ar
e also un erstan that if the contents of the affi avit are
foun to e false at an time after the awar of the contract it
will lea to termination of the contract, forfeiture of Bi or
Performance ecurit an Banning of Business ealings of
the Bi er an all its constituents for a erio of u to five
ears
L
A AND NAT FT B DD
erification
VN
erifie on a of at that the contents of
the a ove mentione affi avit are true an correct an nothing
material has een conceale there from
A AND NAT FT B DD
** The contents in Italics are only for guidance purpose and details
as appropriate, are to be filled in suitably by Bidder.
For : PS 4
DELETED
L
VN
R
For : PC/1
S ed e
S ed e o Pa e t C rre ie
efer u Clause 1 15
DELETED
L
VN
R
For : BDF/1
Bid Se rit
Ba G ara tee
(On non-judicial stamp paper of the appropriate value in accordance with Stamp Act.
The stamp paper should be in the name of the Executing Bank).
Fro :
Insert Bank’s Name, and Address of Issuing Branch or Office] ...........................
To:
The Chairman an anaging Director,
ail ikas Nigam imite ,
1st Floor, August Kranti Bhawan,
Bhikaji Cama Place, K Puram,
New Delhi-110 066
L
e have een informe that [I ert name of the Bidder] hereinafter calle the
Bi er inten s to su mit to ou its i hereinafter calle the Bi for the execution of
name of contract un er nvitation for Bi s No ate
ate the FB
VN
A , the Bi er is re uire to furnish Bi ecurit for the sum of [Insert
required], in the form of Bank uarantee, accor ing to
Value of Bid Security required],
our con itions of Bi
AND
A , Bank], with its Branch
[Insert Name of the Bank] [Insert
Address] having its ea uarters office at [Insert Address], hereinafter
calle the Ba , acting through [Insert Name and Designation of the
Bank], have, at the re uest of the Bi er, agree to
authorised persons of the Bank],
give guarantee for Bi securit as hereinafter containe , in fafavour of the m lo er
R
3 The Bank shall a the amount as eman e imme iatel on resentation of the
eman m lo er without an reference to the Bi er an without the m lo er
eing re uire to show groun s or give reasons for its eman of the amount so
eman e
The guarantee herein efore shall not e affecte an change in the constitution of
the Bank or in the constitution of the Bi er
5 The Bank agrees that no change, a ition, mo ifications to the terms of the Bi
ocument or to an ocuments, which have een or ma e ma e etween the
m lo er an the Bi er, will in an wa a solve the Bank from the lia ilit un er
this guarantee an the Bank, here , waives an re uirement for notice of an such
change, a ition or mo ification ma e m lo er at an time
L
8 The ex ressions Bank an m lo er herein efore use shall inclu e their
res ective successors an assigns
VN
9 The Bank here un ertakes not to revoke the guarantee uring iits currenc , exce t
with the revious consent in writing of the m lo er This guarantee
gua is su ject to the
niform ules for Deman uarantees, CC Pu lication No 758
10 The uarantee shall e vali in a ition to an without reju iice to an other securit
uarantee s of Bi er in favour of the m lo er The Bank, un er this uarantee,
shall e eeme as Princi al De tor of the m lo er
Date
Place signatur s
Bank s eal an authori e signature
[Name in Block letters
R
[Designation] …………
[P/Attorney] No
itness
1 ignature
Name A ress eal
Note: All italicized text is for guidance on how to prepare this bank guarantee and shall be deleted from the final
document.
For : V/1
No Date
From
To,
The Chairman an anaging Director,
ail ikas Nigam imite ,
L
entlemen,
1 e wish to confirm that our com an firm elete as a ro rriate has forme a oint
enture name of -------- with
with for the ur oses associate with
wi FB referre to a ove
(Members who are not the lead partner of the JV should add the following paragraph)*.
2 The is le whom we here authorise to act on our ehalf for the ur oses
of su mission of Bi for an authorise to incur lia ilitie
ilities an receive
instructions for an on ehalf of an an all the artners or cconstituents of the oint
R
enture
(Member(s) being the lead member of the group should add the following paragraph)*
2 n this grou we act as lea er an , for the ur oses of a l ing for ualification,
re resent the oint enture
3 n the event of our grou eing awar e the contract, we agree to e jointl with
names of other mem ers of our an severall lia le to the ail
ikas Nigam imite , its successors an assigns for all o ligations, uties an
res onsi ilities arising from or im ose the contract su se uentl entere into
etween ail ikas Nigam imite an our
e, further agree that entire execution of the contract shall e carrie out
exclusivel through the lea artner
ours faithfull ,
ignature
Name of ignator
Ca acit of ignator
eal Delete as a lica le
L
VN
R
For : V/2
L
matters in connection with our i for the sai roject
itness
R
itness 1 itness 2
Name Name
A ress A ress
ccu ation ccu ation
*Notes:
i To e execute all the artners in ivi uall , in case of a oint enture
ii The mo e of execution of the Power of Attorne shoul e in accor ance with the
roce ure, if an , lai own the a lica le law an the charter ocuments of
the executant s an when it is so re uire the same shoul e un er common
seal affixe in accor ance with the re uire roce ure
For : V/3
POWER OF ATTORNEY1
hereas ail ikas Nigam imite has invite Bi s for the work of
L
hereas, it is necessar for the mem ers of the oint enture tto
o esignate one of them
as the ea Partner, with all necessar ower an authorit to o, for an on ehalf of the
oint enture, all acts, ee s an things as ma e necessar inin connection with the oint
connection the oint enture s i
enture s i for the roject, as ma e necessar in connection
for the roject
VN
N T P F ATT N TN T T AT
e, s , here
here esignate s , eing one of
the artners of the oint enture, as the lea artner of the oint enture, to o on ehalf
of the oint enture, all or an of the acts, ee s or things n necessar or inci ental to the
oint enture s i for the contract, inclu ing su mission of i , artici ating in
conferences, res on ing to ueries, su mission of information ocuments an generall
to re resent the oint enture in all its ealings with the ailwa
ai or an other overnment
Agenc or an erson, in connection with the contract for the sai work until culmination
of the rocess of i ing till the contract agreement is entere into with the ail ikas
R
ignature
itness 1 itness 2
Name Name
A ress A ress
ccu ation ccu ation
Notes:
L
VN
R
For : V/4
DRAFT MEMORANDUM OF UNDERSTANDING (MOU2)
For
BETWEEN
L
successors-in-interest an assigns an
an inclu e their res ective legal re resentatives, successors-in-interest
shall collectivel e referre to as the Parties an in ivi uall as the Part
WHEREAS:
VN
ail ikas Nigam imite N hereinafter referre to as m lo er has invite i s
for [Insert name of work]
i Notice for Bi , an
ii Bi ing ocument
iii An A en um Corrigen um issue ail ikas Nigam imite
R
2 The Parties have stu ie the ocuments an have agree to artici ate in su mitting
a i jointl in the name of ------
3 s shall e the lea mem er of the for all intents an ur ose an shall
re resent the oint enture in its ealing with the m lo er For the ur ose of
su mission of i ro osals, the arties agree to nominate as the lea er ul
authori e to sign an su mit all ocuments an su se uent clarifications, if an , to
the m lo er owever s shall not su mit an such ro osals, clarifications
or commitments efore securing the written clearance of the other artner which shall
e ex e itiousl given s to s
The Parties have resolve that the istri ution of share an res onsi ilities etween
the artners (Bidder a e re t at t e a i ed re po i i itie are
o e rate wit t e E C re ire e t o e a ti itie ei et t e
re pe ti e V part er der C a e 2.3.1: Spe i i Co tr tio E perie e
2
In case of existing joint venture, the certified copy of JV Agreement be furnished.
d i di ati t e ed e/ i o . o BO or re po i i itie , ai i
w i t e id a e re e ted) is as un er -
a ea Partner share
Re po i i itie
Ke Activities
i
ii
iii
B che ule Bill No
i
ii
iii
L
Re po i i itie
Ke Activities
i
VN
ii
iii
B che ule Bill No
i
ii
iii
i
ii
iii
B che ule Bill No
i
ii
iii
Note n case an Bill or items of a Bill are ro ose to e execute more than
one artner then in icate the reaku of that tem Bill no for each artner
either irectl or in irectl with an other art or grou of arties on matters relating to
the Project exce t with rior written consent of the other art an the m lo er
7 EXECUTIVE AUTHORITY
The sai oint enture through its authori e re resentative shall receive instructions,
a ments from the m lo er The management structure for the roject shall e
re are mutual consultations to ena le com letion of roject to ualit
re uirements within ermitte cost an time
9 BID SUBMISSION
ach Part shall ear its own cost an ex enses for re aration an su mission of the
i an all costs until conclusion of a contract with the m lo er for the Project
Common ex enses shall e share oth the arties in the rati
ratio of their actual
artici ation
L
10 INDEMNITY
against its res ective arts in
ach art hereto agrees to in emnif the other art against
case of reach efault of the res ective art of the contract works of an lia ilities
sustaine the oint enture
VN
11 For the execution of the res ective ortions of works, the arties shall make their own
arrangements to ring the re uire uire finance, lants an e ui ment, men materials,
man ower an other resources
13 ARBITRATION
An is ute, controvers or claim arising out of or rela
relating to this shall e
R
settle in the first instance amica l etween the arties f an amica le settlement
cannot e reache as a ove, it will e settle ar itration iin accor ance with the
n ian Ar itration an Conciliation Act 1996 or an amen ments thereof The venue
of the ar itration shall e Delhi
1 VALIDITY
This shall remain in force till the occurrence of the earliest to occur of the
following, unless mutual consent, the Parties agree in writing to exten the vali it
for a further erio
Notices shall e given in writing fax confirme registere mail or commercial courier
to the following fax num ers an a resses
s s
L
eal eal
itness
VN
1 Name A ress
2 Name A ress
R
For : V/5
an
WHEREAS:
L
ail ikas Nigam imite N hereinafter referre to as m lo er has invite i s
for Insert name of work]…………………...” i e A No awar e contract
NOW, THEREFORE, THE PARTIES AGREE AS FOLLOWS:
3 s shall e the lea mem er of the for all intents an ur ose an shall
re resent the oint enture in its ealing with the m lo er F For the ur ose of execution,
the arties agree to nominate as the lea er ul authori e to sign an su mit all
ocuments an enter into corres on ence with the m lo er
The Parties have resolve that the istri ution of share an res onsi ilities etween
the artners (Bidder a e re t at t e a i ed re po i i itie are
o e rate wit t e E C re ire e t o e a ti itie ei et t e
re pe ti e V part er der C a e 2.3.1: Spe i i Co tr tio E perie e d
i di ati t e ed e/ i o . o BO or re po i i itie , ai i w i t e
id a e re e ted) is as un er -
a ea Partner share
Re po i i itie
Ke Activities
i
ii
iii
B che ule Bill No
i
ii
iii
L
c oint enture Partner share
Re po i i itie
VN
Ke Activities
i
ii
iii
B che ule Bill No
i
ii
iii
ex
Note n case an Bill or items of a Bill are ro ose to e execute more than
one artner then in icate the reaku of that tem Bill no for each artner
R
7 EXECUTIVE AUTHORITY
The sai oint enture through its authori e re resentative shall receive instructions,
a ments from the m lo er The management structure for the roject shall e re are
mutual consultations to ena le com letion of roject to ualit re uirements within
ermitte cost an time
9 BID SUBMISSION
ach Part shall ear its own cost an ex enses for re aration an su mission of the
i an all costs until conclusion of a contract with the m lo er for the Project Common
ex enses shall e share oth the arties in the ratio of their actual artici ation
10 INDEMNITY
ach art hereto agrees to in emnif the other art against its res ective arts in case
of reach efault of the res ective art of the contract works of an lia ilities sustaine
the oint enture
11 For the execution of the res ective ortions of works, the arties shall make their own
arrangements to ring the re uirere finance, lants an e ui ment,
ment, materials, man ower
an other resources
L
12 DOCUMENTS & CONFIDENTIALITY
ach Part shall maintain in confi ence an not use for an ur ose relate to the Project
all commercial an technical information receive or generate in the course of
re aration an su mission of the i
VN
13 ARBITRATION
An is ute, controvers or claim arising out of or relating to this agreement shall e
settle in the first instance amica l etween the arties f an amica le settlement cannot
e reache as a ove, it will e settle ar itration in accor ance with the n ian
Ar itration an Conciliation Act 1996 or an amen ments thereof The venue of the
ar itration shall e Delhi
1 VALIDITY
This Agreement shall remain in force till the efect lia ilit erio is over an ecurities
R
are release
Notices shall e given in writing fax confirme registere mail or commercial courier
to the following fax num ers an a resses
s s
eal eal
itness
1 Name A ress
2 Name A ress
L
VN
R
Bi o a titie (BO )
L
VN
R
Bidder a i i atio
To esta lish its ualifications to erform the contract in accor ance with ection 3 valuation
an ualification Criteria the Bi er shall rovi e the information re ueste in the corres on ing
nformation heets inclu e hereun er
L
VN
R
Bidder I or atio
Bidder e a a e
Bidder o tr o
o tit tio
Bidder ear o
o tit tio
Bidder e a addre
L
i o tr o
o tit tio
Bidder a t ori ed
repre e tati e
VN
name, a ress,
tele hone num ers, fax
num ers, e-mail
a ress
Bidder e a a e
V Part er or
S o tra tor e a
a e
V Part er or
L
S o tra tor o tr o
o tit tio
VN
V Part er or
S o tra tor ear o
o tit tio
V Part er or
S o tra tor e a
addre i o tr o
o tit tio
V Part er or
R
1 Articles of incor oration or constitution of the legal entit name a ove, in accor ance with TB 1
an 2
2 Authori ation to re resent the firm name a ove, in accor ance with TB 20 2
2 Current Assets
Not A lica le
3 Total ia ilities
Current
ia ilities
5 Net orth
L
1 3
6 orking
Ca ital 2
-
VN
7 Profit Before
Tax
PBT
(Signature of CA/Auditor)
Re i tratio No:
(Seal)
3. n the event that the au ite accounts for the latest conclu e Financial ear are not
availa le, the Bi er shall furnish information ertaining to tthe
he last five financial ears
L
after ignoring the latest conclu e financial ear n case, thethe i er su mits au ite
financial information for the last six or more ears, onl the figures for the latest five
ears shall e consi ere for evaluation
VN
R
L
VN
A era e A a Co tr tio T r o er or a t 3 ear
3 n the event that the au ite accounts for the latest Financ
Financial ear are not availa le, the
finan
Bi er shall furnish information ertaining to last three financial ears after ignoring the
latest financial ear n case the i er su mits au ite financial information for the last
figu
four or more ears, onl the figures for the latest three ears shall e consi ere for
evaluation
Bi ers an each artner to a shoul rovi e information on their current commitments on all
contract that have een awar e , or which a letter of intent or acce tance has een receive , or for
contracts a roaching com letion, ut for which an un ualifie , full com letion certificate has et to
e issue
Co tra t Co it e t
L
1
2
VN
Tota
R
"Certified that current commitments on all the contracts that have been awarded or for
which a letter of intent or acceptance has been received or for the works in progress or the
works approaching completion, value of outstanding work has been indicated in the above
table correctly. It is further certified that if later on the employer discovers that information
provided in the table is incorrect then the employer will treat our bid invalid and it will be
liable for rejection"
Co tra t o Si i ar Si e a d Nat re
Co tra t
Co tra t No.
Ide ti i atio
I part er i a V or
o tra tor, pe i
L
Per e t o Tota : A o t: INR
parti ipatio i tota
o tra t a o t
E p o er Na e,
VN
C rre t Addre a d
C rre t Te ep o e/Fa
N er, E- ai
De riptio o t e i i arit i a orda e wit Criteria 2.3.1 (a) o Se tio 3
R
or f o r o r
r o o
o o r o r or o r or
o o r o
f r r or
o r or f
r of o o
L
r o o
o r o
o r rr
VN
r rr
o r
r o r o of o of or r r of
o
R
o of r f o r or of for o f r o
r for r r r o
o of o f of r o r
of r o r or o r o r of ro o
o r or
E C FORM NO.1
Clause No Clause hea ing Details of value of work uantit of
activit an eferences Folio No
of Documents through which criteria
against each item is eing met
2 ualification
2 1 1 Conflict of nterest
2 1 2 hare of artners
2 1 3 Dis ualification of Bi er
2 2 Financial tatus
221 istorical Financial Performance
2 2 2 A era e Annual Construction Turnover
2 2 3 Net orth
2 2 Bi Ca acit
23 x erience
2 3 1 ecific Construction x erience
a Contracts of imilar i e an Nature
ingle Contract
L
Two Contracts
Construction x erience in Ke Activities
i Construction and launching of PSC girders/Slab
and/or Composite girders of 22 M or longer spans
with total length of such spans being 600 M or
VN
more in Railway/ road/ metro rail bridges
(including viaducts) in 1 year
ii Execution of 7200 M of installation of pile of
diameter of 1000 MM or more in
Railway/road/metro rail bridges (including
viaducts) in 1 year
iii Civil Enginnering works of at least one
Underground / or one Elevated Metro Station of
any size or Civil work of Single Multistoried
building (Airport building or Railway station
building or Multistoried Commercial building / or
other Multistoried Public Building etc) of
R
building of
minimum Area 10000 sqm or 2 buildings
minimum area 5000 sqm each.
(iv) Construction of Diaphragm wall mm wide or
more for underground construction work of
sqm or more and underground RCC Box pushing
work for a length of m or more in
Railway/Road/Metro Rail Projects or other
underground construction work.
2 Personnel
n ertaking su mitte
25 ui ment
n ertaking su mitte
2 6 ecialist su -contractor un ertaking su mitte
I(a) P E(Public ealth Engineering)
(b) Architectural Finishing works
(c) Station Signage orks
(d) E&M orks
(e) Fire Detection & Fire Suppression System
II ater Proofing of Underground RCC Box
Underground RCCBox Pushing
RE ECTION OF BID
L
1 2 uoting more than one ercentage for an sche ule
L
VN
eneral onditions of ontract
( )
R
L
Page Intentionally
VN
Left Blank
R
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
Ta e o C a e
L
21 ight of Access to the ite ...................................................................................
................................................................................... 14
22 Permits, icences or A rovals .......................................................................
.............................................................. 14
23 m lo er s Personnel ..............................................................
........................................................................................ 15
2 m lo er s Financial Arrangements ..............................................................
............................................................... 15
VN
25 m lo er s Claims .............................................................................................
.............................................................. 15
3. T e E i eer ..................................................................................................................
31 ngineer s Duties an Authorit .......................................................................
.............................................................. 15
32 Delegation the ngineer ..............................................................................
.............................................................. 17
33 nstructions of the ngineer ..............................................................................
.............................................................. 17
3 e lacement of the ngineer ...........................................................................
.............................................................. 17
35 Determinations ....................................................................................................
.............................................................. 18
6. Sta a d La o r ........................................................................................................... 4
61 ngagement of taff an a our ..................................................................... 34
62 ates of ages an Con itions of a our .................................................... 34
6.3 Persons in the Service of
Employer .............34
6 a our aws ........................................................................................................
........................................................................................................ 35
65 orking ours .............................................................. ...................................... 35
....................................................................................................
66 Facilities for taff an a our...........................................................................
.............................................................. 36
67 ealth an afet ...............................................................................................
............................................................................................... 36
L
68 Contractor s u erinten ence ..............................................................
.......................................................................... 37
69 Contractor s Personnel .............................................................. ........................ 37
......................................................................................
6 10 ecor s of Contractor s Personnel an ui ment...................................... 38
6 11 Disor erl Con uct.............................................................................................
............................................................................................. 38
VN
6 12 Foreign Personnel ..............................................................................................
.............................................................. 38
6 13 u l of Foo stuffs ..........................................................................................
.............................................................. 38
61 u l of ater ..................................................................................................
.............................................................. 38
6 15 easures against nsect an Pest Nuisance................................................. 38
6 16 Alcoholic i uor or Drugs ..............................................................
.................................................................................. 3
6 17 Arms an Ammunition ..............................................................
....................................................................................... 3
6 18 Festivals an eligious Customs..............................................................
..................................................................... 3
6 19 Funeral Arrangements ..............................................................
....................................................................................... 3
6 20 Prohi ition of Force or Com ulsor a our ............................................. 38
6 21 Prohi ition of armful Chil a our ................................................................ 38
6 22 m lo ment ecor s of orkers .................................................................... 38
R
8. Co e e e t, De a a d S pe io ............................................................. 4
81 Commencement of orks ................................................................................ 42
82 Time for Com letion........................................................................................... 43
83 Programme .......................................................................................................... 43
8 xtension of Time for Com letion ................................................................... 44
85 Dela s Cause Authorities .......................................................................... 44
86 ate of Progress................................................................................................. 45
87 Dela Damages .................................................................................................. 45
9. Te t o Co p etio .................................................................................................... 4
91 Contractor s ligations .................................................................................... 47
92 Dela e Tests ..................................................................................................... 47
93 etesting.............................................................................................................. 47
9 Failure to Pass Tests on Com letion .............................................................. 47
.5 Contractor s obligation ... 48
10. E p o er Ta i O er ..............................................................
............................................................................................. 4
10 1 Taking ver of the orks an ections ......................................................... 48
10 2 Taking ver of Parts of the orks ..................................................................
.............................................................. 4
10 3 nterference with Tests on Com letion ........................................................... 50
10.4 Surfaces requiring Reinstatement ..50
L
11. De e t Lia i it ............................................................................................................
11 1 Com letion of utstan ing ork an eme ing Defects ......................... 50
11 2 Cost of eme ing Defects ..............................................................
.............................................................................. 51
11 3 xtension of Defects Notification Perio ........................................................ 51
VN
11 Failure to eme Defects ...............................................................................
.............................................................. 51
11 5 emoval of Defective ork ..............................................................
.............................................................................. 52
11 6 Further Tests ..............................................................
....................................................................................................... 52
11 7 ight of Access ...................................................................................................
.............................................................. 52
11 8 Contractor to earch ..............................................................
.......................................................................................... 52
11 9 Performance Certificate..............................................................
..................................................................................... 52
11 10 nfulfille ligations ..............................................................
........................................................................................ 52
11 11 Clearance of ite ................................................................................................
.............................................................. 52
...................................................................................... 52
12 2 etho of easurement ................................................................................... 53
12 3 valuation ..............................................................
............................................................................................................ 53
12 missions ..............................................................
............................................................................................................ 56
L
16. S pe io a d Ter i atio Co tra tor .........................................................
16 1 Contractor s ntitlement to us en ork .................................................... 1
16 2 Termination Contractor ..............................................................................
.............................................................. 21
16 3 Cessation of ork an emoval of Contractor s ui ment ...................... 2
VN
16 Pa ment on Termination ...................................................................................
.............................................................. 2
17. Ri a d Re po i i it ..............................................................................................
..............................................................
17 1 n emnities ..............................................................
.......................................................................................................... 3
17 2 Contractor s Care of the orks ........................................................................
.............................................................. 3
17 3 m lo er s isks ................................................................................................
.............................................................. 4
17 Conse uences of m lo er s isks ................................................................ 4
17 5 ntellectual an n ustrial Pro ert ights ...................................................... 4
17 6 imitation of ia ilit ...........................................................................................
.............................................................. 5
17 7 se of m lo er s Accomo ation Facilities ................................................... 5
R
18. I ra e ........................................................................................................................
18 1 eneral e uirements for nsurances ............................................................ 6
18 2 nsurance for orks an Contractor s ui ment ........................................ 6
18 3 nsurance against njur to Persons an Damage to
Pro ert 100
18 nsurance for Contractor s Personnel ........................................................... 100
19. For e Ma e re ................................................................................................................
1 .1 Payment and release in case of Optional Termination .100
20. C ai , Di p te a d Ar itratio ...........................................................................
20 1 Contractor s Claims .......................................................................................... 101
20 2 Amica le ettlement ........................................................................................ 101
20 3 Ar itration . . 102
. urisdiction of ourts .. ..104
Appe di 1 .............105
Ge era Co ditio
1. Ge era Pro i io
1.1 De i itio n the Con itions of Contract these Con itions , which inclu e ecial
Con itions of Contract, Parts A an B, an these eneral Con itions, the
following wor s an ex ressions shall have the meanings state or s
in icating ersons or arties inclu e cor orations an other legal entities,
exce t where the context re uires otherwise
1.1.1 T e Co tra t 1111 Co tra t means the Contract Agreement, the etter of
cce tance, the etter of Bi , these Con itions, the
Acce ecificati
ecification,
the Drawings, the che ules, an the further ocuments if an
which are liste in the Contract Agreement or in the etter of
Acce tance
L
1112 Co tra t A ree e t” means the contract agreement if any
re erred to in u -Clause 1 6 Contract Agreement
VN
1113 “Letter o A epta e means the letter of formal acce tance,
signe the m lo er, of the etter of Bi , inclu ing an
annexe memoran a com rising agreements etween an
signe oth Parties f there is no such letter of acce tanc
tance,
the ex ression etter of Acce tance means the Contract
Agreement
A greement an the ate of issuing or receiving the etter of
Acce tance means the ate of signing the Contract Agreement
111 “Letter o Bid” means the ocument entitle letter of i , which
was com lete the Contractor an inclu es the signe offer to
t
the m lo er for the orks
1115 “Spe i i atio means the ocument entitle s ecification, as
R
1.1.2 Partie a d 1121 “Part ” means the m lo er or the Contractor, as the context
Per o re uires
1122 “E p o er” means the erson name as em lo er in the
Contract Data an the legal successors in title to this erson
1123 “Co tra tor” means the erson s name as contractor in the
etter of Bi acce te the m lo er an the legal successors
in title to this erson s
112 “E i eer” means the erson nominate the m lo er to act
L
as the ngineer for the ur oses of the Contract an name in
the Contract Data, or other erson a ointe from time to time
the m lo er an notifie to the Contractor un er u -Clause 3
e lacement of the ngineer TheTh erson nominate to act as
VN
an engineer ma e an em lo ee of ail ikas Nigam t
N or an em lo ee of a Project anagement Consultanc
firm engage N for roject management as er the
iscretion of the m lo er
1125 “Contractor s Repre e tati e” means the erson name
“Contractor the
Contractor in the Contract or a ointe from time to time the
th
Contractor un er u -Clause 3 Contractor s e resentative ,
who acts on ehalf of the Contractor
1126 m lo er s Repre e tati e” means the erson name the
m lo er in the Contract or a ointe from time to time the
m lo er who acts on ehalf of the m lo er
R
1.1.3 Date , Te t , 1131 “Ba e Date” means the ate 28 a s rior to the ea line for
Period a d su mission of i s
Co p etio
1132 “Commencement Date means the ate notifie un er u -
Section 6 –General Conditions of Contract Page 6 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
L
efects in the orks or a ection as the case ma e un er
u -Clause 11 1 Com letion of utstan ing ork an
eme ing Defects , as state in the Contract Data with an
extension un er u -Clause 11 3 xtension of Defects
VN
Notification Perio , calculate from the ate on which the oorks
or ection is com lete as certifie un er u -Clause 10 1
Taking ver of the orks an ections
1138 “Per or a e Certi i ate” means the certificate issue un er
u -Clause 11 9 Performance Certificate
L
Clause 1 Contract Price an Pa ment
11 10 “Pro i io a S ” means a sum if an which is s ecifie in
the Contract as a rovisional sum, for the execution of an art of
the orks or for the su l of Plant, aterials or services un er
VN
u -Clause 13 5 Provisional ums
11 11 “Rete tio Mo e ” means the accumulate retention mone s
which the m lo er retains un er u -Clause 1 3 A lication
for nterim Pa ment Certificates an a s un er u -Clause 1 9
Pa ment of etention one
11 12 “State e t” means a statement su mitte the Contractor as
art of an a lication, un er Clause 1 Contract Price an
Pa ment , for a a ment certificate
1.1.5 Wor a d 1151 “Co tra tor E ip e t means all a aratus, machiner ,
R
1157 “Te porar Wor ” means all tem orar works of ever kin
other than Contractor s ui ment re uire on ite for the
execution an com letion of the Permanent orks an the
reme ing of an efects
1158 “Wor ” mean the Permanent orks an the Tem orar orks,
or either of them as a ro riate
1.1.6 Ot er De i itio 1161 “Co tra tor Documents means the calculations, com uter
rograms an other software, rawings, manuals, mo els an
other ocuments of a technical nature if an su lie the
Contractor un er the Contract
1162 “Co tr means n ia, the countr in which the ite or most of
it is locate , where the Permanent orks are to e execute
1163 “E p o er E ip e t means the a aratus, machiner an
vehicles if an ma e availa le le the m lo er for the use of
the Contractor in the execution of the orks, as state in the
ecification ut oes not inclu e Plant which has not een
taken over the m lo er
L
116 “For e Ma e re is efine in Clause 19 Force ajeure
1165 “Law ” means all national or state legislation, statutes,
or inances an other laws, an regulations an -laws of an
legall constitute u lic authorit
VN
1166 “Per or a e Se rit means the securit or securities, if an
un er u -Clause 2 Performance ecurit
1167 “Site” means the laces where the Permanent orks are to e
execute an to which Plant an aterials are to e elivere ,
an an other laces as ma e s ecifie in the Contract as
forming art of the ite
1168 “U ore eea e means not reasona l foreseea le an against
which a e uate reventive recautions coul not reasona l e
taken an ex erience contractor the ate for su mission of
the Bi
R
1.2 I terpreta- n the Contract, exce t where the context re uires otherwise
tio a wor s in icating one gen er inclu e all gen ers
wor s in icating the singular also inclu e the lural an wor s in icating
the lural also inclu e the singular
c rovisions inclu ing the wor agree, agree or agreement re uire the
agreement to e recor e in writing
written or in writing means han -written, t e-written, rinte or
electronicall ma e, an resulting in a ermanent recor an
1.3 Co i atio herever these Con itions rovi e for the giving or issuing of a rovals,
certificates, consents, eterminations, notices, re uests an ischarges, these
communications shall e
a in writing an elivere han against recei t , sent mail or courier,
or transmitte using an of the agree s stems of electronic tr
transmission
as state in the Contract Data an
elivere , sent or transmitte to the a ress for the reci ient s
communications as state in the Contract Data owever
i if the reci ient gives notice of another a ress, communica
communications
shall thereafter e elivere accor ingl an
L
ii if the reci ient has not state otherwise when re uesting an
a roval or consent, it ma e sent to the a ress from which tthe
re uest was issue
VN
A rovals, certificates, consents an eterminations shall not e unreasona l
withhel or ela e hen a certificate is issue to a Part , the certifier shall
sen a co to the other Part Pa ,
hen a notice is issue to a Part the other
Part or the ngineer, a co shall e sent to the ngineer or the other Part ,
as the case ma e
1.4 Law a d The Contract shall e governe the law of the countr or oth
other juris iction
La a e state in the Contract Data
The ruling language of the Contract shall e that state in the Contract Data
The language for communications shall e that state in the Con
Contract Data f
no language is state there, the language for communications shall e the
R
1.5 Priorit o The ocuments forming the Contract are to e taken as mutuall
Do e t ex lanator of one another For the ur oses of inter retation, the
following
riorit of the ocuments shall e in accor ance with the follo
se uence
a the Contract Agreement if an ,
the etter of Acce tance,
c the etter of i ,
the che ules inclu ing Price Bill of uantities ,
e ecial Con itions of Contract
i Part A Contract Data
ii Part B - ecific Provisions
f the eneral Con itions of Contract
g orks m lo er s e uirements,
h the Drawings,
i an other ocuments forming art of the Contract
f an am iguit or iscre anc is foun in the ocuments, the ngineer shall
issue an necessar clarification or instruction
1.6 Co tra t The Parties shall enter into a Contract Agreement within 28 a s after the
A ree e t Contractor receives the etter of Acce tance, unless the agree otherwise The
Contract Agreement shall e ase u on the form annexe to the ecial
Con itions of Contract The costs of stam uties an similar charges if an
im ose law in connection with entr into the Contract Agreement shall e
orne the m lo er
1.7 A i e t Neither Part shall assign the whole or an art of the Contrac
Contract or an enefit
or interest in or un er the Contract owever, either Part
a ma assign the whole or an art with the rior agreement o
of the other
Part , at the sole iscretion of such other Part , an
L
ma , as securit in favour of a ank or financial instituti
institution, assign its right
to an mone s ue, or to ecome ue, un er the Contract
1.8 Care a d S pp The ecification an Drawings shall e in the custo an care of the
VN
o Do e t m lo er nless otherwise state
state in the Contract, two co ies of
o the Contract
an of each su se uent Drawing shall e su lie to the ContracContractor, who ma
make or re uest further co ies at the cost of the Contractor
ach of the Contractor s Documents shall e in the custo an care of the
Contractor, unless an until taken over the m lo er nless otherwise
state in the Contract, the Contractor shall su l to the ngineer
ngi six co ies of
each of the Contractor s Documents
The Contractor shall kee , on the ite, a co of the Contract, u lications
name in the ecification, the Contractor s Documents if an , the Drawings
an ariations an other communications given un er the Contract Contrac The
R
1.9 De a ed Drawi The Contractor shall give notice to the ngineer whenever the orks are likel
or I tr tio to e ela e or isru te if an necessar rawing or instruction is not issue
to the Contractor within a articular time, which shall e reasona le The notice
shall inclu e etails of the necessar rawing or instruction, etails of wh an
when it shoul e issue , an etails of the nature an amount of the ela
or isru tion likel to e suffere if it is late
f the Contractor suffers ela an or incurs Cost as a result of a failure of the
ngineer to issue the notifie rawing or instruction within a time which is
reasona le an is s ecifie in the notice with su orting etails, the Contractor
shall give a further notice to the ngineer an shall e entitle su ject to u -
Clause 20 1 Contractor s Claims to
a an extension of time for an such ela , if com letion is or will e
1.10 E p o er U e As etween the Parties, the Contractor shall retain the co right an other
o Co tra tor intellectual ro ert rights in the Contractor s Documents an other esign
Do e t ocuments ma e or on ehalf of the Contractor
The Contractor shall e eeme give to the
signing the Contract to giv
-fr
m lo er a non-termina le transfera le non-exclusive ro alt -free licence to
co , use an communicate the Contractor s Documents, inclu ing making an
using mo ifications of them This licence shall
a a l throughout the actual or inten e working life which
whichever is longer
of the relevant arts of the orks,
L
art of the orks
entitle an erson in ro er ossession of the relevant ar
to co , use an communicate the Contractor s Documents for the
justing,
ur oses of com leting, o erating, maintaining, altering, a jus
re airing an emolishing the orks, an
VN
c in the case of Contractor s Documents which are in the form of com uter
rograms an other software, ermit their use on an com uter o on the
ite an other laces as envisage the Contract, inclu ing
re lacements of an com uters su lie the Contractor
The Contractor s Documents an other esign ocuments ma e or on
ehalf of the Contractor shall not, without the Contractor s consent, e use ,
co ie or communicate to a thir art or on ehalf of the m lo er for
ur oses other than those ermitte un er this u -Clause
1.12 Co ide tia The Contractor shall isclose all such confi ential an other information as the
Detai ngineer ma reasona l re uire in or er to verif the Contractor s com liance
with the Contract
The Contractor shall treat the etails of the Contract as rivate an
confi ential, exce t to the extent necessar to carr out the Contractor s
o ligations un er the Contract or to com l with a lica le aws The
Contractor shall not u lish or isclose an articulars of the orks without the
revious agreement of the m lo er owever, the Contractor shall e
ermitte to isclose an u licl availa le information, or information
otherwise re uire to esta lish his ualifications to com ete for other rojects
1.13 Co p ia e wit The Contractor shall, in erforming the Contract, com l with a lica le aws
L
who shall have authorit to in the Contractor an
each of these ersons an
c the Contractor shall not alter its com osition or legal
status without the rior consent of the m lo er
VN
n the event of efault an artner of joint venture, oon or
after achieving 25 of the financial rogress exclu ing
a vance if an the lea artner or remaining artner s , in
case the efaulting artner is the lea artner, shall notif
the m lo er within twent eight 28 a s of the
occurrence an within Fift six 56 a s of the sai
notification, the lea artner or remaining artner s , who
are not the efaulting artner, shall assign the works of the
efaulting artner, to e uall com etent art with rior
consent of the m lo er For this ur ose the term e uall
com etent art shall mean as un er
R
L
issue of notice of efault
1.15I pe tio t e The Contractor shall ermit the m lo er an or ersons a ointe the
E p o er m lo er to ins ect the ite an or the Contractor s recor s re
relating to the
erformance of the Contract
VN
2. T e E p o er
2.1 Ri t o A e The m lo er shall give the Contractor right of access to, an ossession of,
to t e Site all arts of the ite within the time or times state in the Contract Data The
right an ossession ma not e exclusive to the Contractor f, f un er the
Contract, the m lo er is re uire to give to the Contractor ossession of an
foun ation, structure, lant or means of access, the m lo er shall
s o so in the
time an manner state in the ecification owever, the m lo er ma
withhol an such right or ossession until the Performance ecurit
ec has een
receive
R
f no such time is state in the Contract Data, the m lo er sh shall give the
Contractor right of access to, an ossession of, the ite within such times as
ma e re uire to ena le the Contractor to rocee in accor an ance with the
rogramme su mitte un er u -Clause 8 3 Programme
f the Contractor suffers ela as a result of a failure the m lo er to give
th
an such right or ossession within such time, the Contractor shall give notice
to the ngineer an shall e entitle to
a an extension of time for an such ela , if com letion is or will e
ela e , un er u -Clause 8 xtension of Time for Com letion ,
an
new rates in terms of clause 12 3 1 c
After receiving this notice, the ngineer shall rocee in accor ance with u -
Clause 3 5 Determinations to agree or etermine these matters
owever, if an to the extent that the m lo er s failure was cause an
error or ela the Contractor, inclu ing an error in, or ela in the
su mission of, an of the Contractor s Documents, the Contractor shall not e
entitle to such extension of time or new rates
2.3 E p o er The m lo er shall e res onsi le for ensuring that the m lo er s Personnel
Per o e an the m lo er s other contractors on the ite
a co-o erate with the Contractor s efforts un er u -Clause 6 Co-
o eration , an
L
take actions similar to those which the Contractor is re uire
ui to take
un er su - aragra hs a , an c of u -Clause 8 afet
nviro
Proce ures an un er u -Clause 18 Protection of the nvironment
The notice shall e given as soon as ractica le after the m llo er ecame
aware, or shoul have ecome aware, of the event or circumstances
circumstanc giving rise
to the claim A notice relating to an extension of the Defects Notification
Perio shall e given efore the ex ir of such erio
The articulars shall s ecif the Clause or other asis of the claim, an shall
inclu e su stantiation of the amount an or extension to which the m lo er
consi ers himself to e entitle in connection with the Contract The ngineer
shall then rocee in accor ance with u -Clause 3 5 Determinations to
agree or etermine i the amount if an which the m lo er is entitle to e
ai the Contractor, an or ii the extension if an of the Defects
Notification Perio in accor ance with u -Clause 11 3 xtension of Defects
Notification Perio
This amount ma e inclu e as a e uction in the Contract Price an
Pa ment Certificates The m lo er shall onl e entitle to set off against or
make an e uction from an amount certifie in a Pa ment Certificate, or to
otherwise claim against the Contractor, in accor ance with this u -Clause
3. T eE i eer
3.1 E i eer The m lo er shall a oint the ngineer who shall carr out the uties
D tie a d assigne to him in the Contract The ngineer s staff shall inclu e suita l
A t orit ualifie engineers an other rofessionals who are com etent to carr out
these uties
The ngineer shall have no authorit to amen the Contract
The ngineer ma exercise the authorit attri uta le to the ngineer as
s ecifie in or necessaril to e im lie from the Contract
owever, the ngineer shall o tain the s ecific a roval of the m lo er
efore taking action un er the-following u -Clauses of these Con itions
a u -Clause 12- nforeseea le Ph sical Con itions Agreeing o
etermining an extension of time an or a itional cost
u -Clause 8 - xtension of Time for Com letion Agreeing o
etermining extension of time
c u -Clause 11 9-Performance Certificate ssue of Performance
L
Certificate
u -Clause 13 1- nstructing a ariation xce t,
i in an emergenc situation as etermine the ngineer an as
am lifie in su - aras h an i elow, or
VN
ii for other situations, if the variation in uantit of an iitem oes not
excee 25 of the sti ulate uantit in the agreement, the
variation in uantit in such item oes not result in increase in
excess of 0 1 of contract rice an variation in uantit in ssuch
item oes not result in cumulative variation in contract rice in
excess of 2
e u -Clause 13 3- ariation Proc
Proce ure A roving a ro osal for ariation
su mitte the Contractor in accor ance with u Clause 13 1 or 13 2
f u -Clause 13 -Pa ment in a lica le Currencies ecif ing tthe
amount a a le in each of the a lica le currencies for a ariation
aria
R
3.2 De e atio The ngineer ma from time to time assign uties an elegate authorit to
t e E i eer assistants, an ma also revoke such assignment or elegation These
assistants ma inclu e a resi ent engineer, an or in e en ent ins ectors
a ointe to ins ect an or test items of Plant an or aterials The
assignment, elegation or revocation shall e in writing an shall not take
effect until co ies have een receive oth Parties
owever, unless otherwise agree oth Parties, the ngineer shall not
elegate the authorit to etermine an matter in accor ance with u -Clause
3 5 Determinations
ssistants shall e suita l ualifie ersons, who are com eten
Assistants etent to carr out
these uties an exercise this authorit , an who are fluent in the language for
communications efine in u -Clause 1 aw an anguage
ach assistant, to whom uties have een assigne or authorit has een
elegate , shall onl e authorise to issue instructions to the Contractor to the
extent efine certific
the elegation An a roval, check, certificate, consent,
L
examination, ins ection, instruction, notice, ro osal, re uest, test, or similar
act an assistant, in accor ance with the elegation, shall have
h the same
owev
effect as though the act ha een an act of the ngineer owever
a an failure to isa rove an work, Plant or aterials shall
shal not constitute
VN
a roval, an shall therefore not reju ice the right of the ngineer
n to
reject the work, Plant or aterials
if the Contractor uestions an instruction of an
etermination or instructio
assistant, the Contractor ma refer the matter to the ngineer, who shall
rom tl confirm, reverse or var the etermination or instruction
3.3 I tr tio o The ngineer ma issue to the Cont Contractor at an time instructions an
t eE i eer a itional or mo ifie Drawings which ma e necessar for the execution of
the orks an the reme ing of an efects, all in accor ance with the
Contract The Contractor shall onl take instructions from the ngineer, or from
an assistant to whom the a ro riate authorit has een elegatelegate un er this
R
E i eer re lacement, give notice to the Contractor of the name, a ress an relevant
ex erience of the re lacement ngineer
3.5 Deter i a-tio henever these Con itions rovi e that the ngineer shall rocee in
accor ance with this u -Clause 3 5 to agree or etermine an matter, the
ngineer shall consult with each Part in an en eavour to reach agreement f
agreement is not achieve , the ngineer shall make a fair etermination in
accor ance with the Contract, taking ue regar of all relevant circumstances
The ngineer shall give notice to oth Parties of each agreement or
etermination, with su orting articulars ach Part shall give effect to each
agreement or etermination unless an until revise un er Clause 20 Claims,
Dis utes an Ar itration
4. T e Co tra tor
4.1 Co tra tor The Contractor shall esign to the extent s ecifie in the Con Contract , execute
Ge era an com lete the orks in accor ance with the Contract an with the
L
O i atio ngineer s instructions, an shall reme an efects in the orks o
The Contractor shall rovi e the Plant an Contractor s Documen
Documents s ecifie in
the Contract, an all Contractor s Personnel, oo s, consuma les le an other
things an services, whether of a tem orar or ermanent nature, nature re uire in
an for this esign, execution, com letion an reme ing of efects ef
VN
Allll e ui ment, an material, to e incor orate in or re uire ffor the orks
shall e rocure from a rove sources as sti ulate in the ContractCo
The Contractor shall e res onsi le for the a e uac , sta ilit an safet of all
ite o erations an of all metho s of construction xce t to thet extent
s ecifie in the Contract, the Contractor i shall e res onsi le for all
Contractor s Documents, Tem orar orks, an such esign of each eac item of
Plant an aterials as is re uire for the item to e in accor ance with the
Contract, an ii shall not otherwise e res onsi le for the esign or
s ecification of the Permanent orks
The Contractor shall, whenever re uire the ngineer, su mit etails of the
arrangements an metho s which the Contractor ro oses to a o t for the
R
c the Contractor shall e res onsi le for this art an it shall, when the
orks are com lete , e fit for such ur oses for which the art is
inten e as are s ecifie in the Contract an
4.2 Per or a e
The Contractor shall obtain (at his cost) a Performance Securit
Security and an
Se rit additional Performance Security, if any in terms of ITB 35.5, ffor proper
performance of the contract, for the amount, currencies and validity
val period for
Performance Security stated in the Contract Data. If an amount is not stated in
L
the Contract Data, this Sub-Clause shall not apply.
The Contractor shall deliver the Performance Security and addit additional
after receiving the
Performance Security, if any, to the Employer within 28 days af
The Performance
Letter of Acceptance, and shall send a copy to the Engineer. Th
VN
Security/additional Performance Security shall be issued by an entity and from
within a country (or other jurisdiction) approved by the Employ
Employer, and shall be
in the form as given in Section 8 (Contract Forms) or in another anothe form
specifically approved by the Employer.
The Performance Security/additional Performance Security shall be, at the
Contractor’s option, in any of the following forms:
(i) An unconditional Bank guarantee in the prescribed format
(ii) A Pay Order / Demand Draft drawn on a Scheduled / Nationalized
New
Bank in India in favour of “Rail Vikas Nigam Ltd” payable at Ne
R
Delhi
(iii) FDR in favour of “Rail Vikas Nigam Ltd.” (free from any
encumbrance).
(iv) A deposit of cash or online bank transfer to RVNL account
The bank guarantee shall be from a bank having minimum net-worth of over
INR 500 million from the specified banks as under:
(i) a Schedule Bank in India, or
(ii) a Foreign Bank having their operations in India, or
(iii) a Foreign Bank which does not have operations in India is required to
provide a counter-guarantee by State Bank of India,
In case the contractor is a JV;”the Performance Security/additional Performance
Security, if any in terms of ITB 35.5, shall be submitted by each JV Partner
separately on behalf of the JV in favour of RVNL in proportion of their
respective percentage share specified in the JV Agreement. The additional
Performance Security shall be submitted by the partner(s) responsible for
execution of schedule(s) (as per JV agreement) against which additional
Section 6 –General Conditions of Contract Page 19 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
L
a copy of the Performance Certificate or passing of the Final Payment P
Certificate whichever is later. owever, on completion of specified
speci section(s)
and successful passage of defect liability period for such section(s)
sect along with
execution of any leftover works at the time of completion of such
su section(s), the
contractor shall be entitled for release of 0% of the proportionate
proporti Performance
VN
Security calculated as specified in Contract Data subject to the
th condition that
Engineer certifies that no recoveries are pending in the contracontract. In case
Engineer points out amount to be recovered then the contractor shall be entitled
for release of 0% of the proportionate Performance Security calculated
ca as
specified in Contract Data minus the amount to be recovered.
submitted in terms
The Employer shall return additional Performance Security submi
of ITB 35.5 as per the following;
(a) If the contractor submits an application stating that all the works
w against
the particular schedule(s)/bill(s) for which additional Performance
Perform
R
Security was submitted in terms of ITB 35.5 have been completed in all
respect, then the Employer, on being satisfied with the claim oof the
contractor, shall return the full additional Performance Security
Securi against
the particular schedule(s). Decision of the Employer regarding
completion of works against a particular schedule/bill shall be final and
binding on the contractor.
(b) If the contractor submits an application stating that majority of the
works (physical progress being not less than 0%) against the particular
schedule(s)/bill(s) for which additional Performance Security was
submitted in terms of ITB 35.5 have been completed and execution of
balance works is held up for reasons not attributable to the Contractor,
then the Employer, on being satisfied with the claim of the contractor,
shall return 75% of the amount of additional Performance Security
against the particular schedule(s). The balance amount of additional
Performance Security shall however be returned only after completion
of the works against the particular schedule(s)/bill(s) for which
additional Performance Security was submitted in terms of ITB 35.5, in
all respects to the satisfaction of the Employer. Decision of the
Section 6 –General Conditions of Contract Page 20 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
L
termination letter in terms of this clause, in case of terminat
termination of the
contract as a whole; Or
ii) at the discretion of the Employer it may be encashed in part/parts
par
proportionate to the Contract price
price of the bill/schedule to which
whi the
VN
terminated part of work belongs i.e P (A x B) C where
P Proportionate Bank Guarantee Amount.
A Contract price of the particular bill/schedule to which the terminated
t
part of work belongs.
B Performance Guarantee amount in terms of GCC sub clause 4.2.
C Total Contract price.
Plus additional performance Guarantee amount, if any, taken in terms of sub
clause 35.5 of ITB and not due for release on the date of issue of termination
R
4.3 Co tra tor The Contractor shall a oint the Contractor s e resentative an shall give
Repre e tati e him all authorit necessar , inclu ing financial owers, to act on the
Contractor s ehalf un er the Contract
nless the Contractor s e resentative is name in the Contract, the
Contractor shall, rior to the Commencement Date, su mit to the ngineer for
consent the name an articulars of the erson the Contractor ro oses to
a oint as Contractor s e resentative f consent is withhel or su se uentl
revoke , or if the a ointe erson fails to act as Contractor s e resentative,
the Contractor shall similarl su mit the name an articulars of another
suita le erson for such a ointment
The Contractor shall not, without the rior consent of the ngi
ngineer, revoke the
a ointment of the Contractor s e resentative or a oint a re lacement
The whole time of the Contractor s e resentative shall e give
given to irecting
L
the Contractor s erformance of the Contract f the Contractor s
e resentative is to e tem oraril
oraril a sent from the ite uring the execution of
the orks, a suita le re lacement erson shall e a ointe , su ject to the
accor ingl
ngineer s rior consent, an the ngineer shall e notifie ac
VN
Contractor, receive
The Contractor s e resentative shall, on ehalf of the Contrac
instructions un er u -Clause 3 3 nstructions of the ngineer
The Contractor s e resentative ma elegate an functions an
owers, functi
authorit to an com etent erson, an ma at an time revoke the t elegation
An
A n elegation or revocation shall not take effect until the ng ngineer has
receive rior notice signe resentative naming the
the Contractor s e resentative,
erson an s ecif ing the owers, functions an authorit eing elegate or
revoke
The Contractor s e resentative shall e fluent in the language for
communications efine in u -Clause 1 aw an anguage f the
R
Contractor s e resentative s elegates are not fluent in the sai language, the
Contractor shall make com etent inter reters availa le uring all
a working hours
in a num er eeme sufficient the ngineer
4.4 S - o tra tor The Contractor shall not subcontract the whole of the orks. The Contractor
shall be responsible for the acts or defaults of any Subcontractor, his agents or
employees, as if they were the acts or defaults of the Contractor.
Unless otherwise stated in the Special Conditions of Contract:
(a) the Contractor shall not be required to obtain consent to suppliers
solely of Materials, or to a subcontract for which the Subcontractor is
named in the Contract or as specifically provided in the Contract data
or value of any sub-contract for orks, or the aggregate value of such
sub-contracts with any Subcontractor, does not exceed 5% (five per
cent) of the Contract Price provided that such works are not for the key
activities in terms of clause 2.6 of section 3 (Evaluation and
Section 6 –General Conditions of Contract Page 22 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
L
grant of consent by the Engineer);
(v) the Contractor shall submit the proposal for subcontracting wit
with the
name, particulars and the relevant experience of the proposed
subcontractor;
VN
n
(c) the Contractor shall give the Engineer not less than 28 days’ notice of
the intended date of the commencement of each Subcontractor’s
work, and of the commencement of such work on the Site;
(d) each subcontract shall include provisions which would entitle tthe
Employer to require the subcontract to be assigned to the Emplo
Employer
under Sub-Clause 4.5 Assignment of Benefit of Subcontract (if or
when applicable) or in the event of termination under Sub-Clause
Sub-Claus
15.2 Termination by Employer ; and
(e) On getting consent from the Engineer, the Contractor shall provide
prov to
R
L
Engineer. The Employer shall adjust the amount paid directly to the Sub-
contractor/Supplier from any amount due by it to the Contractor Contractor. The
Contractor shall repay the amount, in case no amount is found due d by the
Employer to the Contractor.
VN
That the payment by Employer, on behalf of the Contractor to its it Sub-
contractor/Supplier, shall not alter any terms of agreement bet between the
Employer and the Contractor and nor the same shall result in any
an privity of
contract between the Employer and the Sub-contractor/Supplier.
4. ssignment of If a Subcontractor’s obligations extend beyond the expiry date of the relevant
Benefit of Defects Notification Period and the
th Engineer, prior to this date, instructs the
Subcontract Contractor to assign the benefit of such obligations to the Employer,
Emp then the
Contractor shall do so. Unless otherwise stated in the assignment,
assignme the
Contractor shall have no liability to the Employer for the work carried out by
R
4.7 Setti O t The Contractor shall set out the orks in relation to original oints, lines an
levels ofreference s ecifie in the Contract or notifie the ngineer The
Contractor shall e res onsi le for the correct ositioning of all arts of the
orks, an shall rectif an error in the ositions, levels, imensions or
alignment of the works, notif ing the ngineer within 28 a s of the ate of
commencement
n the event of such iscre anc arising uring the course of the work, for
which m lo er s ocuments are han e over after the ate of
commencement, the contractor shall seek clarifications within 1 a s of
recei t of such ocuments
The m lo er shall e res onsi le for an errors in these s eci ecifie or notifie
items of reference, ut the Contractor shall use reasona le eff
efforts to verif their
accurac efore the are use
Contractor shall rom tl notif the m lo er an the ngineer of an error,
omission, fault, or an other efect in the esign, rawing or s ecifications for
L
the works, which he iscovers when reviewing the Contract Docum Documents, an in
the rocess of execution of the orks The contractor shall e res onsi le to
ensure correlation in various rawings an ill of uantities, efore
commencement an execution of work n case of an iscre anc the
clarification within 28 a s
contractor shall ring it to notice of the ngineer for clarifi
VN
of the issue of etter of Acce tance n the event of such isc iscre anc arising
uring the course of the work, for which rawings are given after the ate of
clarifications within 1
issue of etter of Acce tance, the contractor shall seek clarif
a s of recei t of such rawings
4.8 Sa et The Contractor shall follow the rovisions lai Annexure 1 to ection 7
own in Annexur
Pro ed re ecial Con itions of Contract , Cha ter 1 afet an ecuri of ection 5
ecurit
orks m lo ers e uirements an shall
(a) com l with all a lica le safet regulations,
(b) take care for the safet of all ersons entitle to e on the ite,
R
(c) use reasona le efforts to kee the ite an orks clear of unne
unnecessar
o struction so as to avoi anger to these ersons,
(d) rovi e fencing, lighting, guar ing an watching of the orks u
until
com letion an taking over un er Clause 10 m lo er s Taking ver ,
an
(e) rovi e an Tem orar orks inclu ing roa wa s, footwa s, guar s an
fences which ma e necessar , ecause of the execution of the orks,
for the use an rotection of the u lic an of owners an occu iers of
a jacent lan
4.8.1 Notwithstan ing with an other rovision, the Contractor shall have to a
enalt for amage to ailwa ca le in terms of clause C 15 of the P as
given in ara 1 2 of Cha ter 1 afet an ecurit of ection 5
orks m lo ers e uirements an shall also in emnif the m lo er
against an losses, amages to ro ert or life in terms of ara 1 11 an 1 12
of the cha ter 1 afet an ecurit of ection 5 orks m lo ers
e uirements
Section 6 –General Conditions of Contract Page 25 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
4.10 Site Data The m lo er shall have ma e availa le to the Contractor for hi his information,
rior to the Base Date, all relevant ata in the m lo er s os ossession on su -
surface an h rological con itions at the ite, inclu ing envi environmental
as ects The m lo er shall similarl make availa le to the Contractor all such
ata which come into the m lo er s ossession after the Base Date D The
Contractor shall e res onsi le for inter reting all such ata
L
To the extent which was ractica le taking account of cost an time , the
Contractor shall e eeme to have o taine all necessar infor information as to
risks, contingencies an other circumstances which ma influenc
influence or affect the
Bi or orks To the same extent, the Contractor shall e eeme to have
ins ecte an examine the ite, its surroun ings, the a ove a ata an other
VN
availa le information, an to have een satisfie efore su mitmitting the Bi as
to all relevant matters, inclu ing without limitation
(a) the form an nature of the ite, inclu ing su -surface con itio
itions,
(b) the h rological an climatic con itions,
(c) the extent an nature of the work an oo s necessar for the e
execution
an com letion of the orks an the reme ing of an efects,
(d) the aws, roce ures an la our ractices of the Countr , an
(e) the Contractor s re uirements for access, accommo ation, facili
facilities,
R
4.12 U ore eea e n this u -Clause, h sical con itions means natural h sical con itions an
P i a Co ditio man-ma e an other h sical o structions an ollutants, which the Contractor
Section 6 –General Conditions of Contract Page 26 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
encounters at the ite when executing the orks, inclu ing su -surface an
h rological con itions ut exclu ing climatic con itions
f the Contractor encounters a verse h sical con itions which he consi ers to
have een nforeseea le, the Contractor shall give notice to the ngineer as
soon as ractica le
This notice shall escri e the h sical con itions, so that the can e ins ecte
the ngineer, an shall set out the reasons wh the Contractor consi ers
them to e nforeseea le The Contractor shall continue executing the orks,
using such ro er an reasona le measures as are a ro riate for the
h sical con itions, an shall com l with an instructions which the ngineer
ma give f an instruction constitutes a ariation, Clause 13 ariations an
A justments shall a l
f an to the extent that the Contractor encounters h sical conco itions which
are nforeseea le, gives such a notice, an suffers ela an or o incurs Cost
je to u -Clause
ue to these con itions, the Contractor shall e entitle su ject
20 1 Contractor s Claims to
(a) an extension of time for an such ela , if com letion is or wi will e
ela e , un er u -Clause 8 xtension of Time for Com letion , an
L
(b) a ment of an such Cost, which shall e inclu e in the Contra
Contract Price
After receiving such notice an ins ecting an or investigating these h sical
con itions, the ngineer shall rocee in accor ance with u -Clause-C 35
VN
Determinations to agree or etermine
etermine i whether an if so to what extent
matt
these h sical con itions were nforeseea le, an ii the matters escri e in
su - aragra hs a an a ove relate to this extent
owever, efore a itional Cost is finall agree or etermine un er su -
aragra h ii , the ngineer ma also review whether other h sical s con itions
in similar arts of the orks if an were more favoura le than tha coul
reasona l have een foreseen when the Contractor su mitte the Bi f an
to the extent that these more favoura le con itions were encountere
encoun , the
ngineer ma rocee in accor ance with u -Clause 3 5 Determinations
Determi to
agree or etermine the re uctions in Cost which were ue to these con itions,
which ma e inclu e as e uctions in the Contract Price an Pa ment
R
4.13 Ri t o Wa a d The Contractor shall ear all costs an charges for s ecial an or tem orar
Fa i itie rights-of-wa which he ma re uire, inclu ing those for access to the ite The
Contractor shall also o tain, at his risk an cost, an a itional facilities outsi e
the ite which he ma re uire for the ur oses of the orks
which such oversi e an overweight items that are not normall to e move ,
the contractor shall o tain rior ermission from the concerne authorities
Pa ments for com l ing with the re uirements, if an , for rotection or
strengthening of the roa s, highwa s or ri ges shall e ma e the
contractor an such ex enses shall e eeme to e inclu e in his uote
contract rice
4.14 A oida eo The Contractor shall not interfere unnecessaril or im ro erl with
I ter ere e
(a) the convenience of the u lic, or
(b) the access to an use an occu ation of all roa s an foot aths,
irres ective of whether the are u lic or in the ossession of the
m lo er or of others or
(c) Passenger amenities at stations an station latforms
a
The Contractor shall in emnif an hol the m lo er harmless against an
from all amages, losses an ex enses inclu ing legal fees an ex enses
resulting from an such unnecessar or im ro er interference
L
4.15 A e Ro te The Contractor shall e eeme to have een satisfie as to the suita ilit an
availa ilit of access routes to the ite The Contractor shall use reasona le
efforts to revent an roa or ri ge from eing amage the Contractor s
traffic or the Contractor s Personnel These efforts shall iinclu e the ro er
VN
use of a ro riate vehicles an routes
xce t as otherwise state in these Con itions
(a) the Contractor shall as etween the Parties e res onsi le fo for an
maintenance which ma e re uire for his use of access routes
(b) the Contractor shall rovi e all necessar signs or irections along
access routes, an shall o tain an ermission which ma e re uire
from the relevant authorities for his use of routes, signs an irections
(c) the m lo er shall not e res onsi le for an claims which ma arise
from the use or otherwise of an access route
R
(d) the m lo er oes not guarantee the suita ilit or availa ilit of articular
access routes an
(e) Costs ue to non-suita ilit or non-availa ilit , for the use rre uire the
Contractor, of access routes shall e orne the Contractor
4.16 Tra port o nless otherwise state in the ecial Con itions of Contract
Good
(a) the Contractor shall give the ngineer not less than 21 a s notice of the
ate on which an Plant or a major item of other oo s will e elivere
to the ite
(b) the Contractor shall e res onsi le for acking, loa ing, trans orting,
receiving, unloa ing, storing an rotecting all oo s an other things
re uire for the orks an
(c) the Contractor shall in emnif an hol the m lo er harmless against
an from all amages, losses an ex enses inclu ing legal fees an
ex enses resulting from the trans ort of oo s, an shall negotiate an
a all claims arising from their trans ort
4.17 Co tra tor The Contractor shall e res onsi le for all Contractors ui ment hen
E ip e t rought on to the ite, Contractor s ui ment shall e eeme to e
exclusivel inten e for the execution of the orks The Contractor shall not
remove from the ite an major items of Contractor s ui ment without the
consent of the ngineer owever, consent shall not e re uire for vehicles
trans orting oo s or Contractor s Personnel off ite
n the event of Contractor im orts an e ui ment the following shall a l
(a) C to C eara e: The m lo er will assist the contractor, when
re uire furnishing letters of recommen ation for o taining ex e itious
clearance through customs of constructional lants, material an other
things re uire for the works an then for re-ex ort, if an The following
u lications, ma e referre to the contractor for gui ance a out
custom regulations etc
i m ort ex ort olic , together with amen ments, if an ,
u lishe ovt of n ia, inistr of Commerce
j an Book of Proce ures, together with amen ments, if an ,
olume 1 an 2 u lishe inistr of Commerce
L
iii Customs Tariff, together with amen ments, if an l
u lishe
Central Customs
The Contractor shall e res onsi le to follow the latest
lates rules an
regulations without an lia ilit of the m lo er
VN
( ) Re-e port o o tra tor e ip e t: The contractor shall o tain all the
relevant information regar ing roce ure for the im ort an su se uent
Control
re-ex ort of his e ui ment an materials from the Chief Controller of
m orts an x orts, New Delhi, an shall inform himself an kee ke
himself informe on the etails of custom charges an raw- ack
regulations as a lica le to the items of Constructional lant The
th
contractor shall rovi e the necessar guarantee on s where these are
re uire the customs notwithstan ing that im ort licenses ma e
grante in the name of m lo er
c Contracto s
Notwithstan ing the rovisions mentione a ove, Contractor ui ment,
inclu ing essential s are arts therefore, im orte Cont
the Contractor for
R
the sole ur ose of executing the Contract shall e tem oraril exem t
from the a ment of im ort uties an taxes u on initial im ortation,
ort
rovi e the Contractor shall ost with the customs authorities at the
ort of entr an a rove ex ort on or ank guarantee, vali until the
Time for Com letion lus six months, in an amount e ual to the full
im ort uties an taxeswhich woul e a a le on the assesse
im orte value of such Contractor s ui ment an s are arts, an
a a e in the event the Contractor s ui ment is not ex orte from
the Countr on com letion of the Contract A co of the o d or ank
guarantee en orse the custom authorities shall e rovi e the
Contractor to the m lo er u on the im ortation of in ivi ual items of
Contractor s ui ment an s are arts on ex ort of in ivi ual
items of Contractor s ui ment or s are arts, or u on the com letion
of the Contract, Contractor shall re are for a roval the customs
authorit the authorities, an assessment of the resi ual value of the
Contractor s ui ment an s are arts to e ex orte ase on the
e reciation scale s an other criteria use the customs authorities
for such ur oses un er the rovisions of the a lica le aws m ort
uties an taxes shall e ue an a a le to the customs authorities
the Contractor on a the ifference etween the initial im orte value
Section 6 –General Conditions of Contract Page 29 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
4.18 Prote tio o t e The Contractor shall take all reasona le ste s to rotect the environment oth
E iro e t on an off the ite an to limit amage an nuisance to eo le an ro ert
resulting from ollution, noise an other results of his o erat
erations
The Contractor shall ensure that emissions, surface ischarges an effluent
from the Contractor s activities shall not excee the values st
state in the
ecification or rescri e a lica le aws
L
fo the rovision
4.19 E e tri it , Water The Contractor shall, exce t as state elow, e res onsi le for
a d Ga of all ower, water an other services he ma re uire
The Contractor shall e entitle to use for the ur oses of the orks such
VN
su lies of electricit , water, gas an other services as ma e availa le on the
ite an of which etails an rices are given in the ecifica
ecification The
n
Contractor shall, at his risk an cost, rovi e an a aratus necessar for his
use of these services an for measuring the uantities consume
The uantities consume an the amounts ue at these rices ffor such
services shall e agree or etermine the ngineer in accor ance with
u -Clause 2 5 m lo er s Claims an u -Clause 3 5 Determinations
Determin The
Contractor shall a these amounts to the m lo er
R
4.20 E p o er The m lo er shall make the m lo er s ui ment if an availa le for the use
E ip e t a d of theContractor in the execution of the orks in accor ance with the etails,
Free-I e arrangements an rices state in the ecification nless otherwise state in
Materia the ecification
(a) the m lo er shall e res onsi le for the m lo er s ui ment, exce t
that
(b) the Contractor shall e res onsi le for each item of m lo er s
ui ment whilst an of the Contractor s Personnel is o erating it, riving
it, irecting it or in ossession or control of it
The a ro riate uantities an the amounts ue at such state rices for the
use of m lo er s ui ment shall e agree or etermine the ngineer in
accor ance with u -Clause 2 5 m lo er s Claims an u -Clause
-Clau 35
Determinations The Contractor shall a these amounts to the m lo er
The m lo er shall su l , free of charge, the free-issue mate
materials if an in
accor ance with the etails state in the Contract ata The m lo er shall, at
lace s ecifie in the
his risk an cost, rovi e these materials at the time an lac
Contract The Contractor shall then visuall ins ect them, an shall rom tl
L
give notice to the ngineer of an shortage, efect or efault in these
materials nless otherwise agree oth Parties, the m lo e er shall
imme iatel rectif the notifie shortage, efect or efault
n case materials are han e over, in accor ance with the roc roce ure
VN
rescri e accounte for, the
the ngineer, after ro er measurement an accoun
contractor shall e solel lia le for an shortage, amage, ef efect or efault in
such material, an shall in emnif the m lo er until the final accountal of
materials is ma e the Contractor on com letion of the work
4.21 Pro re nless otherwise state in the ecial Con itions of Contract, monthl
Report rogress re orts shall e re are the Contractor an su mitte to the
ngineer in six co ies The first re ort shall cover the erio u to the en of
the first calen ar month following the Commencement Date orts shall e
e o
su mitte monthl thereafter, each within 7 a s after the last a of the erio
to which it relates
R
e orting shall continue until the Contractor has com lete all work which is
known to e outstan ing at the com letion ate state in the Ta Taking- ver
Certificate for the orks
ach re ort shall inclu e
charts an etaile escri tions of rogress, inclu ing each stage of
esign if an , Contractor s Documents, rocurement, manufacture,
eliver to ite, construction, erection an testing an inclu ing these
stages for work each nominate u contractor as efine in Clause 5
Nominate u contractors ,
hotogra hs showing the status of manufacture an of rogress on the
ite
for the manufacture of each main item of Plant an aterials, the name of
the manufacturer, manufacture location, ercentage rogress, an the
actual or ex ecte ates of
(i) commencement of manufacture,
(ii) Contractor s ins ections,
(iii) tests, an
(iv) shi ment an arrival at the ite
the etails escri e in u -Clause 6 10 ecor s of Contractor s
Personnel an ui ment
co ies of ualit assurance ocuments, test results an certificates of
aterials
list of notices given un er u -Clause 2 5 m lo er s Claims an
notices given un er u -Clause 20 1 Contractor s Claims
safet statistics, inclu ing etails of an ha ar ous inci ents an activities
relating to environmental as ects an u lic relations an
com arisons of actual an lanne rogress of all activities, w
with etails
of an events or circumstances which ma jeo ar ise the com letletion in
accor ance with the Contract, an the measures eing or to e a o te
to overcome ela s
L
4.22 Se rit o t e (a) the Contractor shall e res onsi le for kee ing unauthorise e
ersons off
Site the ite, an
(b) authorise ersons shall e limite to the Contractor s Personn
Personnel an the
m lo er s Personnel an to an other ersonnel notifie to the
VN
Contractor, the m lo er or the ngineer, as authorise ers ersonnel of
the m lo er s other contractors on the ite
4.23Co tra tor The Contractor shall confine his o erations to the ite, an to an a itional
Operatio o Site areaswhich ma e o taine the Contractor an agree the ngineer as
working areas The Contractor shall take all necessar recauti
recautions to kee
Contractor s ui ment an Contractor s Personnel within the iite an these
a itional areas, an to kee them off a jacent lan
During the execution of the orks, the Contractor shall kee th
the ite free from
R
4.24 Fo i All fossils, coins, articles of value or anti uit , an structures an other remains
or items of geological or archaeological interest foun on the ite shall e
lace un er the care an authorit of the m lo er The Contractor shall take
reasona le recautions to revent Contractor s Personnel or other ersons
from removing or amaging an of these fin ings
The Contractor shall, u on iscover of an such fin ing, rom tl give notice
Section 6 –General Conditions of Contract Page 32 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
to the ngineer, who shall issue instructions for ealing with it f the Contractor
suffers ela an or incurs Cost from com l ing with the instructions, the
Contractor shall give a further notice to the ngineer an shall e entitle
su ject to u -Clause 20 1 Contractor s Claims to
(a) an extension of time for an such ela , if com letion is or will e
ela e , un er u -Clause 8 xtension of Time for Com letion , an
(b) a ment of an such Cost, which shall e inclu e in the Contract Price
After receiving this further notice, the ngineer shall rocee in accor ance
with u -Clause 3 5 Determinations to agree or etermine these matters
L
5.2 O e tio to no
The Contractor shall not e un er an o ligation to em lo a nominate
No i atio j
u contractor against whom the Contractor raises reasona le o jection
notice to the ngineer as soon as ractica le, with su orting articulars An
o jection shall e eeme reasona le if it arises from among other
o things an
of the following matters, unless the m lo er agrees to in emnif emni the
VN
Contractor against an from the conse uences of the matter
(a) there are reasons to elieve that the u contractor oes not ha
have
sufficient com etence, resources or financial strength
(b) the su contract oes not s ecif that the nominate u contract
contractor shall
in emnif the Contractor against an from an negligence or mis
misuse of
oo s the nominate u contractor, his agents an em lo ees or
(c) the su contract oes not s ecif that, for the su contracte work
wo
inclu ing esign, if an , the nominate u contractor shall
(i) un ertake to the Contractor such o ligations an lia ilities a
as will
R
5.3 Pa e t to The Contractor shall a to the nominate u contractor the amounts which
o i ated the ngineer certifies to e ue in accor ance with the su contract These
S o tra tor amounts lus other charges shall e inclu e in the Contract Price in
accor ance with su - aragra h of u -Clause 13 5 Provisional ums ,
exce t as state in u -Clause 5 vi ence of Pa ments
6. Sta a d La o r
6.1 E a e e to xce t as otherwise state in the ecification, the Contractor shall make
Sta a d La o r arrangements for the engagement of all staff an la our, local or otherwise,
an for their a ment, housing, fee ing an trans ort
L
rea
The Contractor is encourage , to the extent ractica le an reasona le, to
em lo staff an la or with a ro riate ualifications an ex e erience from
sources within the Countr
VN
6.2 Rate o Wa e The Contractor shall a rates of wages, an o serve con itions of la our,
a d Co ditio which are not lower than those esta lishe for the tra e or in ustr where the
o La o r work is carrie out f no esta lishe rates or con itions are a lica le, the
Contractor shall a rates of wages an o serve con itions which
whic are not lower
than the general level of wages an con itions o serve locall em lo ers
whose tra e or in ustr is similar to that of the Contractor
f the m lo er is o lige to rovi e amenities or arrange a m ment of wages to
contract la our em lo e the contractor either irectl or through su
art the contractor
contractor un er the contract on account of failures on the ar
to rovi e the amenities an or arrange a ment of wages to the contract
la our as re uire of him un er the rovision of the sai act rules ma e there
R
un er, the ngineer m lo er shall e at li ert without reju ice to the rights
of ngineer m lo er un er ection 20 2 an 21 contract la our
of the contr
egulation an A olition Act 1970 to recover the whole or ar art of the
ex en iture so incurre on the wages so ai the
ngineer m lo er ailwa from the securit e osit an or from an sum or
sums ue to the contractor whether un er this contract or an other contract
The Contractor shall inform the Contractor s Personnel a out their lia ilit to
a ersonal income taxes in the Countr in res ect of such of their salaries,
wages, allowances, an an enefits as are su ject to taxes un er the aws of
the Countr for the time eing in force, an the Contractor shall erform such
uties in regar to such e uctions thereof as ma e im ose on him such
aws
L
chil ren in Construction Cam sites
The Contractors shall not ifferentiate wages etween men an w
women for
work of e ual value
6.3 Per o i t e The Contractor shall not recruit, or attem t to recruit, staff an la our from
VN
Ser i e o amongst ersons in the service of the m lo er or the ngineer
E p o er
6.5 Wor i Ho r No work shall e carrie out on the ite on locall recognise a s of rest, or
outsi e the normal working hours state in the Contract Data, unless
(a) otherwise state in the Contract,
(b) the ngineer gives consent, or
Section 6 –General Conditions of Contract Page 35 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
(c) the work is unavoi a le, or necessar for the rotection of life or ro ert
or for the safet of the orks, in which case the Contractor shall
imme iatel a vise the ngineer
6.6 Fa i itie or xce t as otherwise state in the ecification, the Contractor shall rovi e
Sta a d La o r an maintain all necessar accommo ation an welfare facilities for the
Contractor s Personnel The Contractor shall also rovi e facilities for the
m lo er s Personnel as state in the ecification
The Contractor shall not ermit an of the Contractor s Personnel to maintain
an tem orar or ermanent living uarters within the structures forming art of
the Permanent orks
6.7 Hea t a d The Contractor shall at all times take all reasona le recautions to maintain the
Sa et health an safet of the Contractor s Personnel n colla orati oration with local
health authorities, the Contractor shall ensure that me ical st staff, first ai
facilities, sick a an a stan ing arrangement for am ulance service s are
availa le at a hone call at all times at the ite an at an accommo
a ation for
Contractor s an m lo er s Personnel, an that suita le arrang
arrangements are
ma e for all necessar welfare an h giene re uirements an for the
L
revention of e i emics
n the event of an out reak of illness of an e i emic nature, the Contractor
shall com l with an carr out such regulations, or ers an re uirements as
ma e ma e the overnment or the local me ical or sanitar authorities,
for the ur ose of ealing with an overcoming the same The Co Contractor shall
VN
a oint an acci ent revention officer at the ite, res onsi le for maintaining
safet an rotection against acci ents This erson shall e ualifie for this
res onsi ilit , an shall have the authorit to issue instructi
instructions an take
rotective measures to revent acci ents Throughout the execution
execut of the
orks, the Contractor shall rovi e whatever is re uire thi
this erson to
exercise this res onsi ilit an authorit
The Contractor shall sen , to the ngineer, etails of an acci ent as soon as
ractica le after its occurrence
-A D Prevention The Contractor shall con uct an --A D awareness
rogramme via an a rove service rovi er, an shall un ertake such other
R
L
Contractor lans to satisf the re uirements of this u -Clause an the relate
s ecification For each com onent, the rogram shall etail th the resources to
e rovi e or utili e an an relate su -contracting ro ose The rogram
shall also inclu e rovision of a etaile cost estimate with s su orting
ocumentation Pa ment to the Contractor for re aration an im lementation
VN
this rogram shall not excee the Provisional um e icate for this ur ose
6.8Co tra tor Throughout the execution of the orks, an as long thereafter a as is necessar
S peri te de e to fulfil the Contractor s o ligations, the Contractor shall rrovi e all necessar
su erinten ence to lan, arrange, irect, manage, ins ect an test t the work
u erinten ence shall e given a sufficient num er of erson
ersons having
a e uate knowle ge of the language for communications efine in u -
Clause 1 aw an anguage an of the o erations to e carrcarrie out
inclu ing the metho s an techni ues re uire , the ha ar s likel to e
satisfactor an
encountere an metho s of reventing acci ents , for the satis
R
6.9Co tra tor The Contractor s Personnel shall e a ro riatel ualifie , skille an
Per o e ex erience intheir res ective tra es or occu ations The ngineer ma
re uire the Contractor to remove or cause to e remove an erson
em lo e on the ite or orks, inclu ing the Contractor s e resentative if
a lica le, who
(a) ersists in an miscon uct or lack of care,
6.10 Re ord o The Contractor shall su mit, to the ngineer, etails showing tthe num er of
Co tra tor each class of Contractor s Personnel an of each t e of Contra Contractor s
L
Per o e a d ui ment on the ite Details shall e su mitte each calen ar month, in a
E ip e t
form a rove the ngineer, until the Contractor has com let
lete all work
which is known to e outstan ing at the com letion ate state in the Taking-
ver Certificate for the orks
VN
6.11 Di order recautio to revent an
The Contractor shall at all times take all reasona le recautions
Co d t unlawful, riotous or isor erl con uct or amongst the Contractor s
Personnel, an to reserve eace an rotection of ersons an ro ert on
an near the ite
6.13 S pp o The Contractor shall arrange for the rovision of a sufficient su l of suita le
Food t foo as ma e state in the ecification at reasona le rices for the
Contractor s Personnel for the ur oses of or in connection with the Contract
6.14 S pp o Water The Contractor shall, having regar to local con itions, rovi e on the ite an
a e uate su l of rinking an other water for the use of the Contractor s
Personnel
6.15 Mea re The Contractor shall at all times take the necessar recautions to rotect the
a ai tI e t Contractor s Personnel em lo e on the ite from insect an est nuisance,
Section 6 –General Conditions of Contract Page 38 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
a d Pe t an to re uce their anger to health The Contractor shall com l with all the
N i a e regulations of the local health authorities, inclu ing use of a ro riate
insectici e
The Contractor shall rovi e his staff an la our with suita le ro h lactics for
the revention of malaria, an take ste s to revent the formation of stagnant
ools of water e shall com l with all the regulations of the local health
authorities in these res ects an shall in articular arrange to s ra thoroughl
with a rove insectici es all uil ings erecte on the site such treatment shall
e carrie out at least once a ear or as instructe the ngineer The
Contractor shall warn his staff an la our of the angers of iseases like
alaria, Filaria an other contagious iseases etc an also cor ions,
nakes, il animals etc an reventive actions re uire to e taken the
la our an staff
6.16 A o o i Li or The Contractor shall not, otherwise than in accor ance with the aws of the
or Dr Countr , im ort, sell, give arter or otherwise is ose of an alcoholic li uor or
rugs, or ermit or allow im or ortation,
tation, sale, gift arter or is osal thereto
Contractor s Personnel
L
6.17 Ar a d The Contractor shall not give, arter, or otherwise is ose of, to an erson,
A itio an arms or ammunition of an kin , or allow Contractor s Personnel to o so
VN
6.18 Fe ti a a d The Contractor shall res ect the Countr s recogni e festivals,
festivals a s of rest
Re i io an religious or other customs
C to
6.19 F era Arra e- The Contractor shall e res onsi le, to the extent re uire local regulations,
e t for making an funeral arrangements for an of his local em lo ees who ma
ie while engage u on the orks
6.20 Pro i itio o The contractor shall not em lo force or com ulsor la our iin an form
For ed or Force or com ulsor la our consists of all work or service, not voluntaril
Co p or La o r erforme , that is extracte from an in ivi ual un er threat of force or enalt
R
6.21 Pro i itio o The Contractor shall not em lo an chil to erform an work that is
Har C id economicall ex loitative, or is likel to e ha ar ous to, or to interfere with, the
La o r chil s e ucation, or to e harmful to the chil s health or h sical, mental,
s iritual, moral, or social evelo ment
6.22 E p o e t The Contractor shall keep complete and accurate records of the employment of
Re ord o labour at the Site. The records shall include the names, ages, genders, hours
Wor er
worked and wages paid to all workers. These records shall be summarized on a
monthly basis and shall be available for inspection by the Engineer during
normal working hours. These records shall be included in the details to be
submitted by the Contractor under Sub-Clause 6.10 Records of Contractor’s
Personnel and Equipment .
(i) In addition to the above, the Contractor shall register his firm/company etc.
on website www.shramikkalyan.indianrailways.gov.in’ and upload requisite
details of labour and their payment in this portal. These details shall be
available in public domain. The Registration/ updation on Portal shall be
Section 6 –General Conditions of Contract Page 39 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
done as under:
(a) Contractor shall apply for onetime registration of his company/firm
etc. in the Shramikkalyan portal with requisite details subsequent to
issue of Letter of Acceptance. Employer/Engineer shall approve the
contractor’s registration in the portal within 7 days of receipt of such
request.
(b) Contractor once approved by any Employer/Engineer, can create
password with login ID (PAN No.) for subsequent use of portal for all
LoAs issued in his favour.
(c) The contractor once registered on the portal, shall provide details of his
Letter of Acceptances (LoA) / Contract Agreements on shramikkalyan
shramikkal
portal within 15 days of issue of any LoA for approval of concerned
conce
Employer/Engineer. Employer/Engineer shall update (if required) and
approve the details of LoA filled by contractor within 7 days of receipt
of such request.
(d) After approval of LoA by Employer/Engineer, contractor shall fill fi the
L
salient details of contract labours engaged in the contract and ensure
updating of each wage payment to them on shramikkalyan portal oon
monthly basis.
VN
(e) It shall be mandatory upon the contractor to ensure correct and prompt
uploading of all salient details of engaged contractual labour &
payments made thereof after each wage period.
7. P a t, Materia a d Wor a ip
7.1 Ma er o The Contractor shall carr out the manufacture of Plant, the rro uction
E e tio an manufacture of aterials, an all other execution of the orks
(a) in the manner if an s ecifie in the Contract,
(b) in a ro er workmanlike an careful manner, in accor ance with
recognise goo ractice, an
(c) with ro erl e ui e facilities an non-ha ar ous aterials, exce t as
otherwise s ecifie in the Contract
7.2 Sa p e The Contractor shall su mit the following sam les of aterials, an relevant
information, to the ngineer for consent rior to using the aterials in or for the
orks
(a) manufacturer s stan ar sam les of aterials an sam les s ecifie in
the Contract, all at the Contractor s cost, an
L
measurement or testing without unreasona le ela , or rom tl give notice to
the Contractor that the ngineer oes not re uire to o so f the Contractor
fails to give the notice, he shall, if an when re uire the ngineer, uncover
Con
the work an thereafter reinstate an make goo , all at the Contractor s cost
VN
7.4 Te ti This u -Clause shall a l to all tests s ecifie in the Contract, other than the
Tests after Com letion if an
The Contractor shall rovi e all a aratus, assistance, ocuments
ocumen an other
instrum
information, electricit , e ui ment, fuel, consuma les, instruments, la our,
materials, an suita l ualifie an ex erience staff, as are necessar to
carr out the s ecifie tests efficientl The Contractor shall agree, with the
ngineer, the time an P
lace for the s ecifie testing of an Plant, aterials
an other arts of the orks
The ngineer ma , un er Clause 13 ariations an A justments , var the
Contractor to carr out
location or etails of s ecifie tests, or instruct the Contrac
R
a itional tests f these varie or a itional tests show that the teste Plant,
Contract, the cost of
aterials or workmanshi is not in accor ance with the Contract
carr ing out this ariation shall e orne notwithstan ing
the Contractor, n
other rovisions of the Contract
The ngineer shall give the Contractor not less than 2 hours notice of the
ngineer s intention to atten the tests f the ngineer oes not atten at the
time an lace agree , the Contractor ma rocee with the tests, unless
otherwise instructe the ngineer, an the tests shall then e eeme to
have een ma e in the ngineer s resence
f the Contractor suffers ela an or incurs Cost from com l ing with these
instructions or as a result of a ela for which the m lo er is res onsi le, the
Contractor shall give notice to the ngineer an shall e entitle su ject to
u -Clause 20 1 Contractor s Claims to
(a) an extension of time for an such ela , if com letion is or will e
ela e , un er u -Clause 8 xtension of Time for Com letion , an
(b) a ment of an such Cost , which shall e inclu e in the Contract Price
After receiving this notice, the ngineer shall rocee in accor ance with u -
L
7.6 Re edia Wor Notwithstan ing an revious test or certification, the nginee
ngineer ma instruct the
Contractor to
(a) remove from the ite an re lace an Plant or aterials which iis not in
accor ance with the Contract,
VN
(b) remove an re-execute an other work which is not in accor ance with
the Contract, an
(c) execute an work which is urgentl re uire for the safet of tthe orks,
whether ecause of an acci ent, unforeseea le event or otherwis
otherwise
reaso
The Contractor shall com l with the instruction within a reasona le time,
which shall e the time if an s ecifie in the instruction, or imme iatel if
urgenc is s ecifie un er su - aragra h c
f the Contractor fails to com l with the instruction, the m lo er shall e
entitle to em lo an a other ersons to carr out the work xce t to the
R
extent that the Contractor woul have een entitle to a ment for the work,
the Contractor shall su ject to u -Clause 2 5 m lo er s Claims
Clai a to the
m lo er all costs arising
ari from this failure
7.8 Ro a tie nless otherwise state in the ecification, the Contractor shall a all
ro alties, rents an other a ments for
(a) natural aterials o taine from outsi e the ite, an
(b) the is osal of material from emolitions an excavations an of other
sur lus material whether natural or man-ma e , exce t to the extent that
is osal areas within the ite are s ecifie in the Contract
8. Co e e e t, De a a dS pe io
8.1 Co e e e to The ngineer shall give the Contractor not less than 7 a s notice of the
Wor Commencement Date nless otherwise state in the ecial Con itions of
Contract, the Commencement Date shall e within the num er of a s after
the Contractor receives the etter of Acce tance as s ecifie in Contract Data
The Contractor shall commence the execution of the orks as soon as is
reasona l ractica le after the Commencement Date, an shall then rocee
with the orks with ue ex e ition an without ela
8.2 Ti e or The Contractor shall com lete the whole of the orks, an each ection if
Co p etio an , within the Time for Com letion for the orks or ection as the case ma
e , inclu ing
a achieving the assing of the Tests on Com letion, an
com leting all work which is state in the Contract as eing re uire for
whole of the orks or ection s to e consi ere to e com let lete for the
ur oses of taking-over un er u -Clause 10 1 Taking ver of tthe
orks an ections
L
c The ate of com letion for works escri e in this su -clau
-clause, shall e the
earliest of the following
i The ate C recommen s o ening of the ection s for u llic
carriage of assengers to Central overnment, for s ee s of not
VN
less than 75 of the esigne o erating s ee s or,
ii The ate C authorises the ailwa A ministration for o e
ening of
ection s , su ject to sanction of the Central overnment for
s ee s of not less than 75 of the esigne o erating s ee s, or,
o
iii The ate C authori es sanctions o eningof wi
ection s without
ins ection
8.3 Pro ra e The Contractor shall su mit a etaile time rogramme to the ngineer within
28 a s after receiving the notice un er u -Clause 8 1 [Commencement of
Works]. The rogram shall inclu e the h sical an Financial Progress vis- -
R
L
f, at an time, the ngineer gives notice to the Contractor th
that a rogramme
fails to the extent state to com l with the Contract or to e consistent with
actual rogress an the Contractor s state intentions, the Con Contractor shall
su mit a revise rogramme to the ngineer within 15 a s in ac accor ance with
this u -Clause
VN
8.4 E te io o Ti e The Contractor shall e entitle su ject to u -Clause 20 1 Contractor
Co s
or Co p etio th extent that
Claims to an extension of the Time for Com letion if an to the
com letion for the ur oses of u -Clause 10 1 Taking- ver of the orks an
ections is or will e ela e an of the following causes
(a) a ariation unless an a justment to the Time for Com letion ha has een
agree un er u -Clause 13 3 aria ariation Proce ure or other su stantial
change in the uantit of an item of work inclu e in the Contract,
(b) a cause of ela giving an entitlement to extension of time un er a u -
Clause of these Con itions,
R
then this ela or isru tion will e consi ere as a cause of ela un er su -
aragra h of u -Clause 8 xtension of Time for Com letion
L
Clause 8 7 elow
8.7 E te io o Ti e f the Contractor fails to com l with u -Clause 8 2 Time for Com letion for
VN
or Co p etio entire work or for s ecifie section wise com letion erio , an he is not
wit De a entitle to an extension of time un er su clause 8 then the em lo er ma
Da a e Con
grant extension of time with ela amage in such case, the Contractor shall
su ject to u -Clause 2 5 m lo er s Claims a ela amages to the
m lo er for this efault These ela amages shall e the sum state in the
Contract Data, which shall e ai for ever a which shall elael se etween
the relevant Time for Com letion an the ate state in the Taking-
Tak ver
Certificate owever, the total amount ue un er this u -Claus
-Clause shall not
excee the maximum amount of ela amages if an state in the t Contract
Data
Further, if the contractor fails to achieve h sical financial targets as er the
R
8.9Co e e e o f the Contractor suffers ela an or incurs Cost from com l ing with the
S pe io ngineer s instructions un er u -Clause 8 8 us ension of ork an or
from resuming the work, the Contractor shall give notice to the ngineer an
shall e entitle su ject to u -Clause 20 1 Contractor s Claims to
(a) an extension of time for an such ela , if com letion is or wi will e
ela e , un er u -Clause 8 xtension of Time for Com letion , an
(b) a ment of an such Cost, which shall e inclu e in the Contra
Contract Price
After receiving this notice, the ngineer shall rocee in accor
acco ance with u -
Clause 3 5 Determinations to agree or etermine these matters
L
The Contractor shall not e entitle to an extension of time for, or to a ment of
the Cost incurre in, making goo the conse uences of the Contr Contractor s fault
esign, workmanshi or materials, or of the Contractor s failure
failur to rotect, store
or secure in accor ance with u -Clause 8 8 us ension of ork
VN
8.10 Pa e t or P a t The Contractor shall e entitle to a ment of the value as at the ate of
a d Materia i sus ension of Plant an or aterials, if
E e to
S pe io (a) the work on Plant or eliver of Plant an or aterials has ee een
sus en e for more than 28 a s,
(b) the Contractor has marke the Plant an or aterials as the m lo er s
ro ert in accor ance with the ngineer s instructions, an
(c) uch materials or lant is receive at site
8.11 Pro o ed f the sus ension un er u -Clause 8 8 us ension of ork has continue
R
8.12 Re ptio o After the ermission or instruction to rocee is given, the Contractor an the
Wor ngineer shall jointl examine the orks an the Plant an aterials affecte
the sus ension The Contractor shall make goo an eterioration or efect
in or loss of the orks or Plant or aterials, which has occurre uring the
sus ension
8.13 Bo or ear If the Contractor achieves completion of the whole of the orks or any
o p etio section(s) prior to the intended Completion Date prescribed in Contract data
(Extension of time pursuant to Clause 8.4 or any other clause of these
conditions will not be considered), the Employer shall pay to the Contractor a
sum stated in the Contract data as bonus for early completion, for every
calendar month which shall elapse between the date of completion of all items
Section 6 –General Conditions of Contract Page 6 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
9. Te t o Co p etio
9.1Co tra tor The Contractor shall carr out the Tests on Com letion in accor ance with this
O i atio Clause an u -Clause 7 Testing , after rovi ing the ocuments in
accor ance with su - aragra h of u -Clause 1 Contractor s eneral
ligations
The Contractor shall give to the ngineer not less than 21 a s notice of the
ate after which the Contractor will e rea to carr out each of the Tests on
Com letion nless otherwise agree , Tests on Com letion shall e carrie out
L
within 1 a s after this ate, on such a or a s as the ngineer shall
instruct
n consi ering the results of the Tests on Com letion, the ngi
ngineer shall make
allowances for the effect of an use of the orks the m lo er on the
VN
erformance or other characteristics of the orks As soon as tthe orks, or a
ection, have asse an Tests on Com letion, the Contractor shall su mit a
certifie re ort of the results of these Tests to the ngineer
9.2 De a ed Te t f the Tests on Com letion are eing un ul ela e the m lo er, u -
Clause 7 Testing fifth aragra h an or u -Clause 10 3 nterference with
Tests on Com letion shall e a lica le
f the Tests on Com letion are eing un ul ela e the Contractor,
Cont the
ngineer ma notice re uire the Contractor to carr out the Tests within 21
a s after receiving the notice The Contractor shall carr out the Tests on
such a or a s within that erio as the Contractor ma fix a an of which he
R
9.3 Rete ti f the orks, or a ection, fail to ass the Tests on Com letion, u -Clause 7 5
ejection shall a l , an the ngineer or the Contractor ma re uire the
faile Tests, an Tests on Com letion on an relate work, to e re eate
un er the same terms an con itions
9.4 Fai re to Pa f the orks, or a ection, fail to ass the Tests on Com letion re eate un er
Te t o u -Clause 9 3 etesting , the ngineer shall e entitle to
Co p etio
(a) or er further re etition of Tests on Com letion un er u -Clause 9 3
(b) if the failure e rives the m lo er of su stantiall the whole enefit of
the orks or ection, reject the orks or ection as the case ma e ,
in which event the m lo er shall have the same reme ies as are
rovi e in su - aragra h c of u -Clause 11 Failure to eme
Section 6 –General Conditions of Contract Page 7 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
Defects or
(c) issue a Taking- ver Certificate, if the m lo er so re uests
n the event of su - aragra h c , the Contractor shall rocee in accor ance
with all other o ligations un er the Contract, an the Contract Price shall e
re uce such amount as shall e a ro riate to cover the re uce value to
the m lo er as a result of this failure nless the relevant re uction for this
failure is state or its metho of calculation is efine in the Contract, the
m lo er ma re uire the re uction to e i agree oth Parties in full
satisfaction of this failure onl an ai efore this Taking- ver Certificate is
issue , or ii etermine an ai un er u -Clause 2 5 m lo er s Claims
an u -Clause 3 5 Determinations
9.5 Co tra tor Notwithstan ing the rovisions of su -clauses 1, 9 1 to 9 tthe rovisions in
o i atio su se uent su -clauses shall a l for works of Permanent a , signaling
an telecommunication an railwa electrification exclu ing eneneral lectrical
ervices
a The Contractor shall e res onsi le for the execution of tem or
orar an or
ermanent works which ma re uire the rior sanction a roval o of
L
Commissioner of ailwa afet C in accor ance with extant rules for
The ailwa s o ening for Pu lic Carriage of Passengers was a amen e
from time to time An a lica le as an when the works are un ertaken
The Contractor shall initiate the rocess for a roval at least 63 sixt
three a s rior to un ertaking such works which re uire the a roval of
VN
Commissioner of ailwa afet C ocumentation to
an furnish raft ocument
the ngineer
The Contractor shall ensure that existing services an o eratio
erations for
u lic carriage of assengers or goo s, are not affecte exce t those,
which are essentiall re uire to e regulate for execution of works uch
items of works shall e lanne an coor inate through the ng ngineer
c Prior to the commencement of commercial o erations of assenger traffic
10. E p o er Ta i O er
10.1 Ta i O er o xce t as state in u -Clause 9 Failure to Pass Tests on Com letion , the
t e Wor a d orks shall e taken over the m lo er ailwa when i the orks have
Se tio een com lete in accor ance with the Contract, inclu ing the matters
escri e in u -Clause 8 2 Time for Com letion an exce t as allowe in
su - aragra h a elow, an ii a Taking- ver Certificate for the orks has
een issue , or is eeme to have een issue in accor ance with this u -
Clause
The Contractor ma a l notice to the ngineer for a Taking- ver
Section 6 –General Conditions of Contract Page 8 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
Certificate not earlier than 1 a s efore the orks will, in the Contractor s
o inion, e com lete an rea for taking over f the orks are ivi e into
ections, the Contractor ma similarl a l for a Taking- ver Certificate for
each ection
n case the works are to e taken over in accor ance with su -clause 9 5, the
com lete works shall e taken over the onal ailwa with the roce ure
s ecifie the ngineer
The ngineer shall, within 28 a s after receiving the Contractor s a lication
(a) issue the Taking- ver Certificate to the Contractor, stating the ate on
which the orks or ection were com lete in accor ance with the
Contract, exce t for an minor outstan ing work an efects which will
not su stantiall affect the use of the orks or ection for their inten e
ur ose either until or whilst this work is com lete an thes
these efects
are reme ie or
(b) reject the a lication, giving reasons an s ecif ing the work re uire to
e one the Contractor to ena le the Taking- ver Certificate to e
issue The Contractor shall then com lete this work efore issuing iss a
further notice un er this u -Clause
L
f the ngineer fails either to issue the Taking- ver Certifica
Certificate or to reject the
Contractor s a lication within the erio of 28 a s, an if tthe orks or
ection as the case ma e are su stantiall in accor ance wi with the Contract,
the Taking- ver Certificate shall e eeme to have een issue on the last
VN
a of that erio
10.2 Ta i O er o The ngineer ma , at the sole iscretion of the m lo er, issue a Taking-
Part o t e verCertificate for an art of the Permanent orks
Wor
The m lo er shall not use an art of the orks other than as a tem orar
measure which is either s ecifie in the Contract or agree oth Parties
Certificate for this art
unless an until the ngineer has issue a Taking- ver Certific
owever, if the m lo er oes use an art of the orks efore the Taking-
ver Certificate is issue
(a) the art which is use shall e eeme to have een taken over as from
R
a ection , the ela amages thereafter for com letion of the remain er of the
orks shall e re uce imilarl , the ela amages for the remain er of the
ection if an in which this art is inclu e shall also e re uce For an
erio of ela after the ate state in this Taking- ver Certificate, the
ro ortional re uction in these ela amages shall e calculate as the
ro ortion which the value of the art so certifie ears to the value of the
orks or ection as the case ma e as a whole The ngineer shall rocee
in accor ance with u -Clause 3 5 Determinations to agree or etermine
these ro ortions The rovisions of this aragra h shall onl a l to the ail
rate of ela amages un er u -Clause 8 7 Dela Damages , an shall not
affect the maximum amount of these amages
10.3 I ter ere e wit f the Contractor is revente , for more than 1 a s, from carr ing out the
Te t o Tests onCom letion o
a cause for which the m lo er ngineer other
Co p etio Contractors of the m lo er,
are res onsi le, the m lo er shall e eeme to have taken ove
over the orks
or ection as the case ma e on the ate when the Tests on Com C letion
woul otherwise have een com lete
The ngineer shall then issue a Taking- ver Certificate accor iingl , an the
L
Contractor shall carr out the Tests on Com letion as soon as ractica le,
efore the ex ir ate of the Defects Notification Perio The ngineer shall
re uire the Tests on Com letion to e carrie out giving 1 a s notice an
in accor ance with the relevant rovisions of the Contract
VN
f the Contractor suffers ela an or incurs Cost as a result of this ela in
carr ing out the Tests on Com letion, the Contractor shall give notice to the
Cont
ngineer an shall e entitle su ject to u -Clause 20 1 Contractor s Claims
to
(a) an extension of time for an such ela , if com letion is or wi will e
ela e , un er u -Clause 8 xtension of Time for Com letion , an
(b) a ment of an such Cost, which shall e inclu e in the Contra
Contract Price
After receiving this notice, the ngineer shall rocee in accor ance with u -
Clause 3 5 Determinations to agree or etermine these matters
R
10.4 S ra e cert
xce t as otherwise state in a Taking- ver Certificate, a certificate for a
Re iri ection or art of the orks shall not e eeme to certif com letion of an
Rei tate e t groun or other surfaces re uiring reinstatement
11. De e t Lia i it
11.1 Co p etio o n or er that the orks an Contractor s Documents, an each ection, shall
O t ta di Wor e in the con ition re uire the Contract fair wear an tear exce te
a d Re ed i the ex ir ate of the relevant Defects Notification Perio or as soon as
De e t
ractica le thereafter, the Contractor shall
(a) com lete an work which is outstan ing on the ate state in a Taking-
ver Certificate, within such reasona le time as is instructe the
ngineer, an
(b) execute all work re uire to reme efects or amage, as ma e
notifie or on ehalf of the m lo er on or efore the ex ir ate of
the Defects Notification Perio for the orks or ection as the case ma
Section 6 –General Conditions of Contract Page 50 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
e
f a efect a ears or amage occurs, the Contractor shall e notifie
accor ingl , or on ehalf of the m lo er
L
Noti i atio an to the extent that the orks, ection or a major item of Plant
Pl as the case
Period ma e, an after taking over cannot e use for the ur oses for which the
are inten e reason of a efect or amage owever, a Defects
Defect Notification
Perio shall not e exten e more than two ears
f eliver an or erection of Plant an or aterials was sus en e e un er u -
VN
Clause 8 8 us ension of ork or u -Clause 16 1 Contractor s ntitlement
to us en ork , the Contractor s o ligations un er this Claus
Clause shall not
a l to an efects or amage occurring more than two ears after af the
Defects Notification Perio for the Plant an or aterials woul otherwise have
ex ire
11.4 Fai re to f the Contractor fails to reme an efect or amage within a reasona le
Re ed De e t time, a ate ma e fixe or on ehalf of the m lo er, on or which the
efect or amage is to e reme ie The Contractor shall e givgiven reasona le
notice of this ate
R
f the Contractor fails to reme the efect or amage this notifie ate an
Contractor un er u -
this reme ial work was to e execute at the cost of the Contra
Clause 11 2 Cost of eme ing Defects , the m lo er ma at h his o tion
(a) Carr out the work himself or others, in a reasona le manner an at
the Contractor s cost, ut the Contractor shall have no res onsi ilit for
this work an the Contractor shall su ject to u -Clause 2 5 m lo er s
Claims a to the m lo er the costs reasona l incurre the
m lo er in reme ing the efect or amage
(b) re uire the ngineer to agree or etermine a reasona le re uction in the
Contract Price in accor ance with u -Clause 3 5 Determinations or
(c) if the efect or amage e rives the m lo er of su stantiall the whole
enefit of the orks or an major art of the orks, terminate the
Contract as a whole, or in res ect of such major art which cannot e ut
to the inten e use ithout reju ice to an other rights, un er the
Contract or otherwise, the m lo er shall then e entitle to recover all
sums ai for the orks or for such art as the case ma e , lus
financing costs an the cost of ismantling the same, clearing the ite
an returning Plant an aterials to the Contractor
11.6 F rt er Te t f the work of reme ing of an efect or amage ma affect the erformance
of the orks, the ngineer ma re uire the re etition of an of the tests
escri e in the Contract The re uirement shall e ma e notice within 28
a s after the efect or amage is reme ie
These tests shall e carrie out in accor ance with the terms a lica le to the
revious tests, exce t that the shall e carrie out at the ri
risk an cost of the
Part lia le, un er u -Clause 11 2 Cost of eme ing Defects , for the cost
of the reme ial work
11.7 Ri to A e ntil the Performance Certificate has een issue , the Contract
Contractor shall have
such right of access to the orks as is reasona l re uire in or er to com l
with this Clause, exce t as ma e inconsistent with the m lo er s reasona le
L
securit restrictions
11.8 Co tra tor to The Contractor shall, if re uire the ngineer, search for tthe cause of an
Sear efect, un er the irection of the ngineer nless the efect is to e reme ie
at the cost of the Contractor un er u -Clause 11 2 Cost of e eme ing
VN
Defects , the Cost of the search shall e agree or etermine the ngineer
in accor ance with u -Clause 3 5 Determinations an shall e inclu e in
the Contract Price
11.9 Per or a e Performance of the Contractor s o ligations shall not e consi ere to have
Certi i ate Ce
een com lete until the m lo er has issue the Performance Certificate to
the Contractor, stating the ate on which the Contractor com lete le his
o ligations un er the Contract
The m lo er shall issue the Performance Certificate within 28 a s after the
latest of the ex ir ates of the Defects Notification Perio s, or as soon
thereafter as the Contractor has su lie all the Contractor s Documents an
R
com lete an teste all the orks, inclu ing reme ing an ef efects
nl the Performance Certificate shall e eeme to constitute acce tance of
the orks
11.10 U i ed After the Performance Certificate has een issue , each Part shall remain
O i atio lia le for the fulfilment of an o ligation which remains un erforme at that
time For the ur oses of etermining the nature an extent of un erforme
o ligations, the Contract shall e eeme to remain in force
11.11 C eara e o Site on receiving the Performance Certificate, the Contractor shall remove an
remaining Contractor s ui ment, sur lus material, wreckage, ru ish an
Tem orar orks from the ite
f all these items have not een remove within 28 a s after the m lo er
receives a co of the Performance Certificate, the m lo er ma sell or
otherwise is ose of an remaining items The m lo er shall e entitle to e
ai the costs incurre in connection with, or attri uta le to, such sale or
is osal an restoring the ite
An alance of the mone s from the sale shall e ai to the Contractor f
these mone s are less than the m lo er s costs, the Contractor shall a the
outstan ing alance to the m lo er
12.1 Wor to e The orks shall e measure , an value for a ment, in accor ance with
Mea red this Clause
henever the ngineer re uires an art of the orks to e measure ,
reasona le notice shall e given to the Contractor s e resentative, who
shall
(a) rom tl either atten or sen another ualifie re resentative to assist
the ngineer in making the measurement, an
(b) su l an articulars re ueste the ngineer
f the Contractor fails to atten or sen a re resentative, the measurement
ma e or on ehalf of the ngineer shall e acce te as accurate
xce t as otherwise state in the Contract, wherever an Perman
Permanent orks
are to e measure from recor s, these shall e re are the ngineer
The Contractor shall, as an when re ueste , atten to examine an agree
L
the recor s with the ngineer, an shall sign the same when agragree f the
accurate
Contractor oes not atten , the recor s shall e acce te as ac
f the Contractor examines an isagrees the recor s, an or oes
o not sign
them as agree , then the Contractor shall give notice to the nngineer of the
VN
res ects in which the recor s are asserte to e inaccurate Af After receiving
this notice, the ngineer shall review the recor s an either confirm
c or var
them f the Contractor oes not so give notice to the ngineer within 1 a s
after eing re ueste to examine the recor s, the shall e acce acc te as
accurate
12.2 Met od o xce t as otherwise state in the Contract an notwithstan ing local ractice
Mea re e t
(a) measurement shall e ma e of the net actual uantit of each it
item of
the Permanent orks, an
(b) the metho of measurement shall e in accor ance with the Bill of
R
12.3 E a atio xce t as otherwise state in the contract, the ngineer shall rocee
in accor ance with su clause 3 5 Determinations to agree or
etermine the contract rice evaluating each item of work, a l ing
the measurement agree or etermine in accor ance with the a ove
su clause 12 1 an 12 2 an the a ro riate rate or rice for the item
For each item of work, the a ro riate rate or rice for the item shall e
the rate or rice s ecifie for such item in the contract or, if there is no
such item, s ecifie for similar work
12.3.1 owever, a new rate or price shall be appropriate for an item of work if :
(a) all the following conditions are met for existing item of the contract:
(i) the measured quantity of the item is increased by more than 50%
from the quantity of this item in the Bill of uantities or the
Section 6 –General Conditions of Contract Page 53 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
Schedule,
(ii) this increase in quantity multiplied by specified rate for this item
in the Bill of uantities or the Schedule, exceeds 0.25% of the
Accepted Contract Amount,
(iii) this item is not specified in the contract as a “fixed rate item”.
OR
specified
(ii) no rate or price is specifi ed in the contract for this item,
ite and
L
item of work is
(iii) no specified rate or price is appropriate because the it
conditions,
not of similar character, or is not executed under similar cond
as any item in the contract.
VN
OR
(c) contract, if
On passage of original completion period stipulated in the cont
site in some stretches has not been handed over for execution oof the
work due to any of the reasons mentioned below:
and the contractor otherwise has been executing the works satis
satisfactorily
on other sites, as certified by the Engineer, the contractor shall be
entitled for new rates for the items and quantities of work which could
not be executed in the stretches still to be handed over. In case the
progress is not satisfactory, the contractor shall not be entitled for new
rates and the Employer shall have the option either to continue the work
in these stretches through the same agency or get it executed through
other means.
shall get the remaining works on these stretches executed through other
means.
(i) Each new rate or price for item(s) as described in sub paragraph 12.3.1
12.3.2 (a) & (c) above shall be derived from an assessment of the reasonable
cost of executing the work with an additional element of 15% towards
overheads and profit of the Contractor.
(ii) Each new rate or price for item(s) as described in sub paragraph 12.3.1
(b) above shall be derived from an assessment of the reasonable cost
of executing the work with an additional element of 15% towards
overheads and profit of the Contractor, subject to the condition
conditio that
is/
such item(s) as described in sub paragraph 12.3.1 (b) above is/are not
available in the “Standard Bill of uantities of RVNL”.
(iii) In case item(s) as described in sub paragraph 12.3.1 (b) above is/are
available in the “Standard Bill of uantities of RVNL (updated upto
28 days prior to deadline for submission of bids)”, new rate or price
L
for such items shall be the rate as available in the “Standard Bill of
uantities of RVNL (updated upto 28 days prior to deadline for
submission of bids)”, modified by the percentage above/below
accepted in this contract for the respective schedule and also price
VN
variation shall be applicable in the same manner as applicable to items
specified in the contract.
(iv) The assessment of reasonable cost of executing the work (except over
heads and profit which shall be 15%) shall be arrived at based on the
prevailing rates and by taking guidance from the following documents.
docu
The priority of the documents shall be in accordance with the
following sequence:
a) Analysis of Unified SOR of Indian Railway;
b) Analysis issued by MORT ;
R
12.4 O i io henever the omission of an work forms art or all of a ariation, the value
of which has not een agree , if
a the Contractor will incur or has incurre cost which, if the work ha not
een omitte , woul have een eeme to e covere a sum forming
art of the Acce te Contract Amount
the omission of the work will result or has resulte in this sum not
forming art of the Contract Price an
c this cost is not eeme to e inclu e in the evaluation of an
su stitute work
then the Contractor shall give notice to the ngineer accor ingl ing , with
su orting articulars on receiving this notice, the nginee
ngineer shall rocee
in accor ance with u -Clause 3 5 Determinations to agree or etermine
this cost, which shall e inclu e in the Contract Price
13. Variatio a d Ad t e t
L
13.1 Ri t to Var ariations ma e initiate the m lo er at an time rior tto issuing the
Taking- ver Certificate for the orks, either an instruction or making a
re uest to the Contractor to su mit a ro osal
The Contractor shall execute an e oun each ariation til
till the rice oes
VN
not excee 50 of the agreemental value as s ecifie in letter of acce tance
original agreement For variation e on the a ove the contrac contractor shall e
oun to execute, unless the Contractor rom tl gives notice tto the ngineer
stating with su orting articulars that the Contractor canno cannot rea il o tain
the oo s re uire for the ariation on receiving this notice, the ngineer
shall cancel, confirm or var the instruction
ach ariation ma inclu e
a changes to the uantities of an item of work inclu e in the C
Contract,
changes to the ualit an other characteristics of an item of work,
R
13.2 Va e E i eeri The Contractor ma , at an time, su mit to the ngineer a written ro osal
which in the Contractor s o inion will, if a o te , i accelerate com letion, ii
re uce the cost to the m lo er of executing, maintaining or o erating the
orks, iii im rove the efficienc or value to the m lo er of the com lete
orks, or iv otherwise e of enefit to the m lo er
The ro osal shall e re are at the cost of the Contractor an shall inclu e
L
works, taking account of an re uctions in ualit , antici ate life or
o erational efficiencies
not e a fee
owever, if amount i is less than amount ii , there shall no
VN
13.3 Variatio f the ngineer re uests a ro osal, rior to instructing a ariation, the
Pro ed re Contractor shall res on in writing as soon as ractica le, eit
either giving
reasons wh he cannot com l if this is the case or su mitting
mit
(a) a escri tion of the ro ose work to e erforme an a rogra
rogramme for
its execution,
(b) the Contractor s ro osal for an necessar mo ifications to th
the
rogramme accor ing to u -Clause 8 3 Programme an to the TiTime
for Com letion, an
(c) the evaluation of the ariation shall e as s ecifie in Clause 12 3
valuation
R
13.4 Pa e t i f the Contract rovi es for a ment of the Contract Price in more than one
App i a e currenc , then whenever an a justment is agree , a rove or etermine as
C rre ie state a ove, the amount a a le in each of the a lica le currencies shall e
s ecifie For this ur ose, reference shall e ma e to the actual or ex ecte
currenc ro ortions of the Cost of the varie work, an to the ro ortions of
various currencies s ecifie for a ment of the Contract Price
13.5 Pro i io a S ach Provisional um shall onl e use , in whole or in art, in accor ance
with the ngineer s instructions, an the Contract Price shall e a juste
accor ingl The total sum ai to the Contractor shall inclu e onl such
amounts, for the work, su lies or services to which the Provisional um
relates, as the ngineer shall have instructe For each Provisional um, the
ngineer ma instruct
(a) work to e execute inclu ing Plant, aterials or services to e su lie
the Contractor an value un er u -Clause 13 3 ariation
Proce ure an or
(b) Plant, aterials or services to e urchase the Contractor, from a
nominate u contractor as efine in Clause 5 Nominate
u contractors or otherwise an for which these shall e inclu e in
the Contract Price
(i) the actual amounts ai or ue to e ai the Contractor, an
(ii) a sum for overhea charges an rofit, calculate as a ercenta
ercentage
of these actual amounts a l ing the relevant ercentage rate if
an state in the a ro riate che ule f there is no such rate, the
L
ercentage rate state in the Contract Data shall e a lie
The Contractor shall, when re uire the ngineer, ro uce u
uotations,
invoices, vouchers an accounts or recei ts in su stantiation
VN
13.6 Da wor For work of a minor or inci ental nature, the ngineer ma instruct that a
ariation shall e execute on a a work asis The work shall then e value
in accor ance with the Da work che ule inclu e in the Contract,
Contrac an the
following roce ure shall a l f a Da work che ule is not inclu
i e in the
Contract, this u -Clause shall not a l
Before or ering oo s for the work, the Contractor shall su mit uotations to
the ngineer hen a l ing for a ment, the Contractor shall su
s mit invoices,
vouchers an accounts or recei ts for an oo s
xce t for an items for which the Da work che ule s ecifies tthat a ment is
not ue, the Contractor shall eliver each a to the ngineer accurate
statements in u licate which shall inclu e the following etails of the
R
L
after the Base Date, the ngineer shall rocee in accor ance w with u Clause
3 5 etermination to agree or etermine these matters without waiting for
Contractor s m lo er s Notice
Notwithstan ing the foregoing, the Contractor shall not e entitle
enti to such an
VN
extension of time if the same shall alrea have een taken into int account in
etermining an extension an such Cost shall not e se aratel ai if the
same shall alrea have een taken into account in the in exing of an in uts
to the ta le of a justment ata in accor ance with the rovisio
rovisions of u -Clause
13 8
13.8Ad t e t or
R
a Price a justment shall a l onl for work carrie out within the
sti ulate time or extensions grante the m lo er an shall
not a l to work carrie out e on the sti ulate time rice
a justment for extensions for reasons attri uta le to the
Contractor, shall e ai in accor ance with su -clause 13 8
Price a justment shall e calculate for the local an foreign
com onents of the a ment for the work one as er formulae
given elow an
c Following ex ressions an meanings are assigne to the work
one uring each month
Total value of work one uring the month t woul inclu e
the value of materials on which secure a vance has een
grante , if an uring the month less the value of materials
in res ect of which the secure a vance has een
L
recovere , if an , uring the month This exclu es the cost
of work on items for which rates were fixe un er variations
clause 12 an 13 for which the escalation will e regulate
as mutuall agree at the time of fixation of rate
VN
Portion of as a a le in n ian u ees
f Portion of as a a le in Foreign currenc at fixe
exchange rates
RI R F
(i) Ad t e t or La o r Co po e t
Pri e ad t e t or i rea e or de rea e i t e o t
d e to a o r a e paid i a orda e wit t e
o owi or a:
R
Pl 100 l 1- 0 0
ncrease or ecrease in the cost of work uring the
month un er consi eration ue to changes in la our
cost
0 Consumer rice in ex Num er for in ustrial workers All
n ia u lishe in B eserve Bank of n ia Bulletin
in the month on the a 28 a s rior to the closing ate
of su mission of Bi s
1 Consumer rice in ex Num er for in ustrial workers All
in ia- Pu lishe in B eserve Bank of in ia Bulletin in
the month on the a 28 a s rior to the last a of the
erio to which a articular interim a ment certificate is
relate
Pl Percentage of a our com onent of the work
(ii) Ad t e t or Ce e t Co po e t
Vc Pc / 100 X RI X (C1-C0) / C0
Vc Increase or decrease in the cost of work during the month
under consideration due to changes in the rates for cement.
C0 The index Number of holesale Prices in India by Groups and
Sub Groups (Averages) for Manufacture of cement, lime and
plaster’ published in RBI (Reserve Bank of India ) Bulletin
in the month on the day 28 days prior to the closing date of
submission of Bids.
C1 The index Number of holesale Prices in India by Groups and
Sub Groups (Averages) for Manufacture of cement, lime and
plaster’ published in RBI (Reserve Bank of India ) Bulletin in i
the month on the day 28 days prior to the last day of the period
perio
to which a particular interim payment certificate is related.
L
Pc Percentage of Cement component of the work.
VN
(iii) Ad t e t or Stee Co po e t
Vs Ps / 100 X RI X (S1-S0) / S0
R
L
Vs Ps / 100 X RI X (S1-S0) / S0
Vs Increase or decrease in the cost of work on the date under
consideration due to changes in the rates for Steel.
VN
S0 The index Number of holesale Prices in India by Groups an and
Sub Groups (Averages) for Mild Steel - Flat products sub-
group’ published in RBI (Reserve Bank of India) Bulletin /
website of the office of the Economic Adviser in the month on the
day 28 days prior to the closing date of submission of Bids.
S1 The index Number of holesale Prices in India by Groups an and
Sub Groups (Averages) for Mild Steel - Flat products sub-
group’ published in RBI (Reserve Bank of India) Bulletin /
website of the office of the Economic Adviser in the month on the
R
particular
day 28 days prior to the last day of the period to which a part
interim payment certificate is related.
Ps Percentage of Steel component of the work.
submission of Bids.
S1 The index Number of holesale Prices in India by Groups and
Sub Groups (Averages) for MS Bright Bars under Mild Steel -
Long Products sub-group’ published in RBI (Reserve Bank of
India) Bulletin/ website of the office of the Economic Adviser in
the month on the day 28 days prior to the last day of the period to
which a particular interim payment certificate is related.
Ps Percentage of Steel component of the work.
i ) Ad t e t or P a t a d Ma i er a d Spare
Co po e t
Price adjustment for increase or decrease in the cost of Plant and
Machinery spares procured by the contractor shall be paid in
accordance with the following formula:
L
Vp Pp / 100 X RIX (P1-P0) / P0
Vp Increase or decrease in the cost of work during the month under
consideration due to changes in the rates for Plant and Machinery
Machine
VN
spares.
P0 The index Number of holesale Prices in India by Groups and
Sub Groups (Averages) for Manufacture of machinery for
mining, quarrying and construction’ published in RBI
da
(Reserve Bank of India ) Bulletin in the month on the day 28 days
prior to the closing date of submission of Bids.
P1 The index Number of holesale Prices in India by Groups aand
Sub Groups (Averages) for Manufacture of machinery for
mining, quarrying and construction’ published in RBI
R
da
(Reserve Bank of India ) Bulletin in the month on the day 28 days
inter
prior to the last day of the period to which a particular interim
payment certificate is related.
( ) Ad t e t or F e a d L ri a t
Price adjustment for increase or decrease in the cost of POL(fuel and
lubricants) shall be paid in accordance with the following formula:
Vf Pf / 100 X R IX (F1-F0) / F0
Vf Increase or decrease in the cost of work on the date under
consideration due to changes in the rates for Fuel and lubricants.
F0 The average of official prices of Diesel available on
the official website of Indian Oil Corporation Ltd for Delhi,
Section 6 –General Conditions of Contract Page 63 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
( i) Ad t e t or Ot er No Ferro Co po e t
Price a justment for increase or ecrease in the cost of
ther Non Ferrousmetal rocure the contractor shall
e ai in accor ance with the following formula
L
NF PNF 100 NF1-NF0 NF0
N
( ii) Ad t e t or Ot er o a Materia
m Pm 100 i 1- 0 0
L
u lishe in B eserve Bank of n ia Bulletin in the
month on the a 28 a s rior to the last a of the
erio to which a articular interim a ment certificate is
relate
VN
Pm Percentage of local material com onent other than
cement, steel, lant, s ares an P of the work
Notes:
L
P Po 11 + 57 B + 09 n + 23
100 B o no o
VN
P Price a a le as a juste in accor ance with the a ove
formula
Po Price uote
B o Price of teel Blooms - etail refer notes
This rice is as a lica le on the 1st working a of the
month, one month rior to the ea line for su mission of
i s
no Price of electrol tic high gra e inc refer notes
R
L
applicable prices of steel bloom – Retail (SBLR) and Zinc (Zn)
should be for the month of October 2014 and all India average
consumer price index number (W) should be for the month o of
August 2014.
VN
The date of delivery is the date on which transmission line towers
are notified as being ready for inspection/dispatch (in the absence
of such notification, the date of manufacturer’s dispatch note is to
be considered as the date of delivery) or the contracted delivery
date (including any agreed extension thereto), whichever is earlier.)
Notes
(a) All prices of raw materials are exclusive of GST and any other
taxes, duties, levies etc
All rices are as on first working a of the month
R
P Po 10 2 C 27ES 7 IS 5IM 7 TO 15
100 CoESo ISo IMo TOo o
Po Price quoted/Confirmed
L
This price is as applicable on the 1st working day of the
month,ONE month prior to the dead line for submission of bids.
L
month, T O months prior to the date of delivery.
Notes:
(a) All prices of raw materials are exclusive of GST and any other
taxes, duties, leviesetc. Transformers manufacturers import major
raw materials like copper, CRGO steel sheets and Plates etc. The
Section 6 –General Conditions of Contract Page 69 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
1 The LME price of Copper ire Bars (in Rs/MT) is the LME
average settlement price of Copper ire Bars converted into
Indian Rupees with applicable average exchange rate of SBI of
the month. This price is the landed cost, inclusive of applicable
customs duty only but exclusive of countervailing duty.
L
3 The price of steel is the average retail price of steel plates 10 mm
thick as published by Joint Plant Committee (JPC) in Rs./MT as
on 1st working day of the month.
VN
material (in Rs./ g) of pre-compressed
The price of Insulating materials
pressboards of size 10 mm thick, 3200 mm x 4100 mm is the
average C&F price in free currency per MT converted into
Indian Rupees with applicable exchange rates prevailing as on
1st working day of the month as quoted by primary suppliers.
This price is the landed cost, inclusive of applicable customs
duty only but exclusive of countervailing duty.
5 The price of Transformer Oil (in Rs./ .Ltr.) is the average price
on ex-refinery basis as quoted by primary producers for supply
R
in drums.
or luminum Po er ables
P Po l l- lo l - o e e- eo
here,
P Price payable per M as adjusted in accordance with Price
variation clause.
L
FeF Variation factor for Steel
Feo Price of Steel for Armour (Flat strip 4 mm. x 0.8mm/ Round
Roun
VN
1.4mm dia) in Rs. Per MT
Rou
Fe Price of Steel for Armouring (Flat strip 4mm x 0.8 mm/ Round
1.4mm dia) in Rs. Per MT.
The value of variation factors for copper, steel and PVC Compound are
different for different sizes of signaling cables. Accordingly, the PVC
formula for some of the types of signaling cable is as given under:-
L
taken into consideration.
L
VN
( ii) Ad t e t or Forei C rre Co po e t
Fc 0 85 x f Fe1-Fe0 Fe0
L
imme iatel notif the ngineer who shall mo if the
rice a justment rovisions su se uent to such change
to reflect the relevant cost in ex from the actual countr
of origin of the in ut
VN
f the currenc in which the Contract rice is ex resse is
ifferent from the currencies of the sources of the relevant
in ices, the ngineer shall etermine the correction to e
a lie in calculating the Price A justment Factor formula
viii a in or er to avoi istortions in the amount of rice
a justment uch correction shall e a lie to the
increment of rice fluctuation in the ase costs of the
res ective in uts an shall corres on to the ratio of the
exchange rates etween the res ective currencies of the
R
A N T A A AB , P NA ND C A D T N DB
T N N B D, B CT T B NT
C CT N F T A NT PA D T T C NT ACT
N T C NT ND C B C A A AB T ND
N B F A P AND B P A
P B D B BANK F ND A N T B B TN
B C N D DF T P P
L
favoura le to the m lo er, rovi e that if an extension of
time is grante ursuant to u -Clause 8 , the a ove
osition shall a l to the a justments ma e after ex ir of
such extension of time
VN
(I) Per e ta e o er i ad t e t or a ei o t
The ercentages governing the rice a justment for the
local currenc ortion i of the contract for various works
is given in A e re 2.
( ) I di e to e ed i a e o I teri Pa e t Certi i ate
or a period ore t a a o t
As er rovisions of contract Clause 1 3 of CC interim
a ments certificates are to e su mitte the contractor
on monthl asis for the works su l of items ertaining to
R
14.1 T e Co tra t nless otherwise state in the ecial Con itions of Contract
Pri e (a) the Contract Price shall e agree or etermine un er u -
Clause 12 3 valuation an e su ject to a justments in
accor ance with the Contract
(b) the Contractor shall a all taxes, uties an fees re uire to e
ai him un er the Contract, an the Contract Price shall not
Section 6 –General Conditions of Contract Page 75 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
L
m lo er ngineer ma make such a ments an e uct the
same from the sums ue to the Contractor
VN
14.2 Ad a e
Pa e t
14.2.1 Mo i i atio The m lo er shall make a ment, as an nterest earing a vance for
Ad a e mo ili ation, when the Contractor su mits a guarantee in accor ance
with this u -Clause The total a vance a ment, the num er an
timing of instalments if more than one , an the a lica le currencies
cu
an ro ortions, shall e as state in the Contract Data
th total
nless an until the m lo er receives this guarantee, or if the
-Cl
a vance a ment is not state in the Contract Data, this u -Clause
R
shall not a l
The ngineer shall issue an interim a ment certificate for the first
installment of mo ilisation a vance after receiving an a lication
licat for
a vance a ment un er su clause 1 3 A lication for nterim
Pa ment Certificates an after the m lo er receives i the
Performance ecurit in accor ance with u -Clause 2
Performance ecurit an ii a guarantee in amounts an currencies
e ual to the a vance a ment lus 10 The next installment shall e
release onl when the contractor su mits statement of having utili e
the revious installment of mo ili ation a vance an the m lo er is
satisfie that the utili ation has een one in ur oseful manner
.
4. . dvance against nterest earing a vance against lant an machiner , is a a le for
Plant and rocurement of lant, e ui ment an machiner to e utili e
achinery s ecificall for the su ject works, rovi e the same have reache the
site along with urchase or er an the invoices against a guarantee in
amounts an currencies e ual to the a vance a ment lus 10 The
Section 6 –General Conditions of Contract Page 76 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
L
4. . uarantees
A vances as mentione in su -clauses 1 2 1 1 2 2 a ove, sha shall e
a a le against acce ta le Bank uarantees from anks as s ecifieecif
in clause 2 The guarantees shall e in the form as given in ection 8
VN
Contract Forms or in another form a rove the m lo er The
Contractor shall ensure that the guarantees are vali an enforcea
enfor le
until the a vance amount ai as has een re ai , ut its amount
amoun ma
e rogressivel re uce the amount re ai theContractor as
in icate in the Pa ment Certificates f the terms of the guarantee
s ecif its ex ir ate, an the a vance a ment has not een rre ai
the ate 28 a s rior to the ex ir ate, the Contractor sh
shall exten
the vali it of the guarantee until the a vance a ment has een ee
re ai
R
4. .4 ecovery of nless state otherwise in the Contract Data, the a vance a ment
me
dvances shall e re ai through ercentage e uctions from the interim
a ments etermine the ngineer in accor ance with u -Clause
-Clau
1 6 ssue of nterim Pa ment Certificates , as follows
(a) e uctions shall commence in the next interim Pa ment
Certificate following that in which the total of all certifie interim
a ments exclu ing the a vance a ment excee s 5 ercent of
the Acce te Contract Amount less Provisional ums or assage
of six months from the ate of release of first a vance a ment,
whichever is earlier an
(b) e uctions shall e ma e for accrue interest on the a vance u
to the month an a vance at the rate state in the Contract Data
of the amount of each nterim Pa ment Certificate exclu ing the
a vance a ment an e uctions an re a ments of retention in
the currencies an ro ortions of the a vance a ment until such
time as the a vance a ment an accrue interest has een
re ai rovi e that the a vance a ment an accrue interest
Section 6 –General Conditions of Contract Page 77 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
L
4. . dvances to be The a vances shall e use the Contractor strictl for the ur ose
sed only for of the Contract, an for the ur ose for which the are ai n er no
This or
VN
circumstances, shall the a vances e iverte for other ur oses ose An
such iversion shall e construe as a reach of the Contract an a the
Contractor shall e aske to return the a vance at once an a
interest at 15 er annum till the a vance is recovere ack from fr him
The Contractor shall return the a vance an a the interest in one go
without emur
m lo er retains the right for an other reme rescri e for reach
of Contract in this regar
The Contractor, if re uire the ngineer shall rovi e the etails of
utilisation of o ilisation a vance
R
14.3 App i atio or The Contractor shall su mit a tatement in six co ies to the n ngineer
I teri Pa e t in accor ance with the a ment roce ure s ecifie ngin
the ngineer,
Certi i ate
after the en of each month, in a form a rove the ngineer,
showing in etail the amounts to which the Contractor consi ers
himself to e entitle , together with su orting ocuments which shall
inclu e the re ort on the rogress uring this month in accor ance with
u -Clause 21 Progress e orts an ecor easurement
heets
The tatement shall inclu e the following items, as a lica le, which
shall e ex resse in the various currencies in which the Contract
Price is a a le, in the se uence liste
a the estimate contract value of the orks execute an the
Contractor s Documents ro uce u to the en of the month
inclu ing ariations ut exclu ing items escri e in su -
aragra hs to g elow
Section 6 –General Conditions of Contract Page 78 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
L
Claims, Dis utes an Ar itration an
g the e uction of amounts certifie in all revious Pa ment
Certificates
VN
h for invoicing as er T aws, the estimate contract value of the
orks execute in terms of a a ove an an amounts a e or
e ucte as er , e to g a ove is to e roken u in two
com onents i e i the ase amount exclu ing T ii T
com onent calculate at the rate for works contract service as
er T aws
i tatement of interim a ments ce
certificates shoul e su mitte
the Contractor to the ngineer the 7th a of each month for
the work execute u to the en of the revious month
R
14.4 S ed e o f the Contract inclu es a sche ule of a ments s ecif ing the instalments in
Pa e t which the Contract Price will e ai , then unless otherwise state in this
sche ule
(a) the instalments uote in this sche ule of a ments shall e the
estimate contract values for the ur oses of su - aragra h a of
u -Clause 1 3 A lication for nterim Pa ment Certificates
(b) u -Clause 1 5 Plant an aterials inten e for the orks shall not
a l an
(c) if these instalments are not efine reference to the actual rogress
achieve in executing the orks, an if actual rogress is foun to e
less than that on which this sche ule of a ments was ase , then the
ngineer ma rocee in accor ance with u -Clause 3 5
Determinations to agree or etermine revise instalments, whiwhich shall
take account of the extent to which rogress is less than that on which
the instalments were reviousl ase
f the Contract oes not inclu e a sche ule of a ments, the Contractor
Co
shall su mit non- in ing estimates of the a ments which he ex ects to
L
ecome ue uring each uarterl sha
erio The first estimate shall e
su mitte within 2 a s after the Commencement Date evise estimatese
ve Certificate has
shall e su mitte at uarterl intervals, until the Taking- ver
een issue for the orks
VN
14.5 P a t a d f this u -Clause a lies, nterim Pa ment Certificates shall inclu e, un er
Materia su - aragra h e of u -Clause 1 3
i te ded or t e
k an amount for Plant an aterials which have een sent to the
t ite for
Wor
incor oration in the Permanent orks, an
ii a re uction when the contract value of such Plant an aterials
a is
inclu e as art of the Permanent orks un er su - aragra h a of
u -Clause 1 3 A lication for nterim Pa ment Certificates
f the lists referre to in su - aragra hs i or c i elow
el are not inclu e
in the Contract Data, this u -Clause shall not a l
R
L
certified shall be the equivalent of
The additional amount to be certified o
eighty percent of the Engineer’s determination of the cost of the t
Plant and Materials (including delivery
delivery to Site), taking account
accoun of the
valu of
documents mentioned in this Sub-Clause and of the contract value
VN
the Plant and Materials. The amount shall be certified on receipt
recei of
an Indemnity Bond for the stated amount in the Form approved by
the Employer.
The currencies for this additional amount shall be the same as those
in which payment will become due when the contract value is
included under sub-paragraph (a) (a of Sub-Clause 14.3 Application
for Interim Payment Certificates . At that time, the Payment
Certificate shall include the applicable
a reduction which shall be
equivalent to, and in the same currencies and proportions as, this
t
relevant Plant and Materials.
additional amount for the relev
R
14.6 I e o I teri No amount will be certified or paid until the employer has rece received and
Pa e t approved the performance security. Thereafter, the Engineer shallsha within two
Certi i ate
days after receiving a statement and supporting documents (incl (including
Contractor’s certificate in terms of Sub-Clause 6.22 (ii)), issue to the Employer
a provisional interim payment certificate which shall state the amount which
the Engineer determines to be due after preliminary check as per RVNL’s
procedure order. After this the Engineer shall, within 28 days after receiving a
statement and supporting documents, issue to the employer an Interim Payment
Certificate which shall state the amount which the Engineer fairly determines to
be due, with supporting particulars.
owever, prior to issuing the Taking-Over Certificate for the orks, the
Engineer shall not be bound to issue the Interim Payment Certificate in an
amount which would (after retention and other deductions) be less than the
minimum amount of Interim Payment Certificates (if any) stated in the Contract
Data. In this event, the Engineer shall give notice to the Contractor accordingly.
An Interim Payment Certificate shall not be withheld for any other reason,
Section 6 –General Conditions of Contract Page 81 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
although:
(a) if anything supplied or work done by the Contractor is not in accordance
with the Contract, the cost of rectification or replacement may be withheld
until rectification or replacement has been completed; and/or
(b) if the Contractor was or is failing to perform any work or obligation in
accordance with the Contract, and had been so notified by the Engineer,
the value of this work or obligation may be withheld until the work or
obligation has been performed.
The Engineer may in any Payment Certificate make any correction or
modification that should properly be made to any previous Payment Certificate.
A Payment Certificate shall not be deemed to indicate the Engineer’s
acceptance, approval, consent or satisfaction.
L
Clause 14.2 Advance Payment , whichever is later;
(i) After preliminary scrutiny and certifications by the Engineer,
Engine payment
of 70% of the certified net payment due (after recoveries and deductions),
d
VN
shall be made by the Employer within 10 days of receiving a sta statement
conditi that
and supporting documents by the Engineer subject to the condition
last interim payment certificate has been settled after detailed
detaile check. In
the event of the contractor submitting bills based on false measurements,
mea
Project Director should issue a written warning to him to the effect
e that
the facility of 70% payment without detailed check will be withdrawn
with in
future. If the contractor repeats the misconduct this facility should be
withdrawn.
days after the Engineer receives the Statement and supporting documents.
d
Any discrepancy shall be rectified in the next payment to the C
Contractor;
and
c the amount certified in the Final Payment Certificate within 56 days after
the Employer receives this Payment Certificate or, the undisputed amount
shown in the Final Statement, within 56 days after the date of notification
of the suspension in accordance with Sub-Clause 16.2.
Payment of the amount due, unless specified in the Contract Data, shall
be made in INR into the bank account, nominated by the Contractor
except for the Contract where the Contractor has opted for payment
through Letter of Credit (LC) arrangement. In such a case, the procedure
for payment shall be as prescribed in clause 14.7.1 below.
owever, in case of JV, direct payment to individual JV partners shall be
made on joint certification (about the net amounts payable to individual
partners) by the authorized representative of the JV and concerned
respective authorized representative of individual JV partners, after
L
Procedure for payment through
14.7.1
(i) The LC shall be a sight LC.
(ii) The contractor shall select his Advising/Negotiating bank for LC. The
VN
incidental cost towards issue of LC and its operation thereof sshall be
borne by the contractor.
(iii) The Employer’s Bank and its nodal branch for issue of LCs basebased on
indicated
requests received from Employer Accounts Units shall be as indi
in the Contract Data. The Branch office of the Employer’s B Bank,
indicated in
where the Employer Accounts Office has its Account, as indicate
the Contract Data, will be the issuance/reimbursing branch for LC
issued under this arrangement. The Bank shall remain same for this
R
(iv) The LC shall be opened initially for duration of 180 to 365 days in
consultation with contractor. The LC shall be extended time to time as
per the progress of the contract, on the request of the contractor. The
value of LC to be opened initially as well as extended thereafter shall
be finalized by the engineer in consultation with the contractor on the
basis of expected progress of work.
(v) The LC terms and conditions shall inter-alia indemnify and save
harmless the Employer from and against all losses, claims and
demands of every nature and description brought or recovered against
the Employer by reason of any act or omission of the contractor, his
agents or employees, in relation to the Letter of Credit (LC). All sums
Section 6 –General Conditions of Contract Page 83 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
(vi) The LC terms and conditions shall inter-alia provide that Employer
will issue a Document of Authorisation (in the format decided in
consultation with the Employer’s Bank) after passing the Interim
Payment Certificate for completed work, to enable contractor to claim
the authorized amount from their bank.
L
Authorisation shall also be sent by Employer Accounts Office to
Employer’s bank.
(x) p
On receipt of Document of Authorization, the contractor shall present
VN
his claim to his bank (advising Bank) for necessary payments as per
LC terms and conditions. The claim shall comprise of copy of
Document of Authorization, Bill of Exchange and Payment Certifi
Certificate.
(xii) The contractor’s bank (advising bank) shall submit the documents
document to
the Employer’s Bank .
R
(xiii) The Employer’s bank (Issuing Bank) shall, after verifying the claim
c so
received w.r.t. the Document of Authorisation received from Employer
Emp
Accounts Office release the payment to contractor’s bank (advising
bank) for crediting the same to contractor’s account.
(xiv) Any number of Interim Payment Certificates can be dealt within one
LC, provided the sum total of payments to contractor is within the
amount for which LC has been opened.
(xv) The LC shall be closed after the release of Final Payment certificate
including PVC amount, if any, to the contractor.
14.8 De a ed f the Contractor oes not receive a ment in accor ance with u -Clause
Pa e t 1 7 Pa ment , the Contractor shall e entitle to receive interest
com oun e monthl on the amount un ai uring the erio of ela This
erio shall e eeme to commence on the ate for a ment s ecifie in
u -Clause 1 7 Pa ment , irres ective in the case of its su - aragra h
of the ate onwhich an nterim Pa ment Certificate is issue
nless otherwise state in the ecial Con itions of Contract, the interest
amount e calculate at the annual rate of seven ercent
The Contractor shall e entitle to this a ment without formal notice or
certification, an without reju ice to an other right or reme
14.9 Pa e t o The Retention Money shall be certified and paid with the final payment
Rete tio Mo e certificate or bank guarantee against retention money shall be released, after
making required adjustments for recovery for shortage/excess ma
materials, if any
e cept those quantities hich become surplus due to change in
planning scheme by ail ay N in case the recovery for
surplus e cess materials is still balance after adjusting the aamount
L
payable in the final payment certificate.
Rete
herever the contract is terminated under Clause 15.2, the Retention Money
separately.
shall be forfeited and the balance work should be got done sepa
14.10 State e t at ithin 8 a s after receiving the Taking- ver Certificate for the orks, the
Co p etio Contractor shall su mit to the ngineer six co ies of a tatement tateme at
R
14.11App i atio or ithin 56 days after receiving the Performance Certificate, the Contractor
Fi a Pa e t shall submit, to the Engineer, six copies of a draft final statement as per
Certi i ate
procedure prescribed by the Engineer, with supporting documents (including
Contractor’s certificate in terms of Sub-Clause 6.22 (ii)) showing in detail in
a form approved by the Engineer:
(a) the value of all work done in accordance with the Contract, and
(b) any further sums which the Contractor considers to be due to him under
the Contract or otherwise.
If the Engineer disagrees with or cannot verify any part of the draft final
statement, as per procedure prescribed by the Engineer the Cont
Contractor shall
submit such further information as the Engineer may reasonably require and
shall make such changes in the draft as may be agreed between tthem. The
final statement
Contractor shall then prepare and submit to the Engineer the fi
Conditions as the
as agreed. This agreed statement is referred to in these Condit
“Final Statement”.
L
owever if, following discussions between the Engineer and the Contractor and
any changes to the draft final statement which are agreed, it becomes
b evident
Employer (with a copy to
that a dispute exists, the Engineer shall deliver to the Employ
the Contractor) an Interim Payment Certificate for the agreed pparts of the draft
VN
resolved under Sub-Clause
final statement. Thereafter, if the dispute is finally resolve
20.3 Obtaining Dispute Board’s Decision or Sub-Clause 20.2 A Amicable
Settlement , the Contractor shall then prepare and submit to ththe Employer (with
a copy to the Engineer) a Final Statement.
14.12Di ar e hen su mitting the Final tatement, the Contractor shall su mit mi a
ischarge which confirms that the total of the Final tatement re resents full
an final settlement of all mone s ue to the Contractor un er or in
connection with the Contract This ischarge ma state that it ecomes
effective when the Contractor has receive the Performance ecurit ecu an
the outstan ing alance of this total, in which event the ischarge shall e
R
14.14 Ce atio o The m lo er shall not e lia le to the Contractor for an matter or thing un er
E p o er or inconnection with the Contract or execution of the orks, exce t to the
Lia i it extent that the Contractor shall have inclu e an amount ex ressl for it
(a) in the Final tatement an also
(b) exce t for matters or things arising after the issue of the Taking- ver
Certificate for the orks in the tatement at com letion escri e in
u -Clause 1 10 tatement at Com letion
owever, this u -Clause shall not limit the m lo er s lia ilit un er his
in emnification o ligations, or the m lo er s lia ilit in an case of frau ,
eli erate efault or reckless miscon uct the m lo er
L
15.1 Noti e to Corre t If the Contractor fails to carry out any obligation under the C
Contract as
mentioned below, but not limited to, the Engineer/ Employer may serve the
contractor with a 14 days notice in writing calling upon the co
contractor to make
VN
good the failure and to remedy it. If the contractor;
(a) fails to comply with Sub-Clause 4.2 Performance Security ,
(b) pl
abandons the orks or otherwise plainly demonstrates the intention not to
continue performance of his obligations under the Contract,
(c) without reasonable excuse fails to:
(i) proceed with the orks in accordance with Clause 8
Commencement, Delays and Suspension , or
(ii) comply with a notice issued under Sub-Clause 7.5 Rejection
Rejectio or
R
L
encashment of these additional Bank Guarantee(s) shall be linked
linke with
the non achievement of agreed physical/financial targets agreed upon by
the Contractor and the Employer.
15 1 2 In case the contractor’s failure is limited to only some of the works, and
VN
in response to Notice to Correct under Clause 15.1 of GCC, the
contractor approaches the Employer that such works may be offlo offloaded
from him and got executed through another agency and additional cost
incurred, if any, should be recovered from his dues, the EmplEmployer, on
being convinced that the anticipated additional cost for such w works will
not be substantial and can be recovered from the dues of the co contractor
and that such offloading will help in improving the overall proprogress of
repercussion on
the project, may agree to such offloading without any repercuss
the performance security and/or additional bank guarantees, if any,
submitted by the contractor. owever, the Employer will not be under
R
In case the contractor does not approach the employer for offloading but
the Employer is convinced that:
15.2Ter i atio The Employer shall be entitled to terminate the Contract as a whole or any part or
E p o er parts (as may be specified in the Notice of Termination under any of the above
Sub-Clause issue) if the Contractor:
(a) fails to comply with the directions contained in the notice und
under Sub-Clause
15.1 Notice to Correct ,
(b) becomes
ecomes bankrupt or insolvent, goes into liquidation, has a rece receiving or
administration order made against it by Court or Statutory AuthAuthority him,
L
compounds with his creditors, or carries on business under a re
receiver, trustee
d
or manager for the benefit of his creditors, or if any act is done or event
occurs which (under applicable Laws) has a similar effect to any of these acts
or events, or
VN
(c) gives or offers to give (directly or indirectly) to any person any bribe, gift,
gratuity, commission or other thing of value, as an inducement or reward:
(i) for doing or forbearing to do any action in relation to the Con
Contract, or
(ii) for showing or forbearing to show favour or disfavour to any pe
person in
relation to the Contract,
Subcontracto gives or offers to
or if any of the Contractor’s Personnel, agents or Subcontractors
give (directly or indirectly) to any person any such inducement or reward as is
sub-paragraph
sub-p
described in this sub-paragraph
aragraph (c). owever, lawful inducements and rewards to
Contractor’s Personnel shall not entitle termination
R
N
In any of these events or circumstances, the Employer may, by Notice Terminate
the contract with immediate effect.
pre
The Employer’s election to terminate the Contract shall not prejudice any other
rights of the Employer, under the Contract or otherwise.
The Contractor shall remove all his plants and machinery from the site then leave
the Site and deliver any required Goods, all Contractors’ Documents, and other
design documents made by or for him, to the Engineer within 7 days from the issue
of Notice of Termination, failing which Delay Damages as prescribed for delay in
completion of works shall be imposed as per provision of clause 8.7. owever, the
Contractor shall use his best efforts to comply immediately with any reasonable
instructions included in the notice of Termination (i) for the assignment of any
subcontract, and (ii) for the protection of life or property or for the safety of the
orks.
After termination, the Employer may complete the orks and/or arrange for any
other entities to do so. The Employer and these entities may then use any Goods,
Contractor’s Documents and other design documents made by or on behalf of the
Contractor for completing the work.
. aluation at ate As soon as practicable after a notice of termination under Sub-Clause 15.2
of Termination Termination by Employer has taken effect, the Engineer shall proceed in
accordance with Sub-Clause 3.5 Determinations to agree or determine the
value of the orks, Goods and Contractor’s Documents, and any other sums
due to the Contractor for work executed in accordance with the Contract. For
this purpose, the contractor shall be notified the date for witnessing of
measurements and handing over of the materials for which contractor has
already been paid. In case the contractor fails to attend or send a representative
even after such notice, the Engineer shall ex parte proceed with measurements
of the works executed and taking over of plants and materials etc. for which
payment has already been made to the contractor, which shall be treated as
final.
L
ecurit
i n full inclu ing a itional Performance uarantee amount iif an taken in
terms of su clause 35 5 of TBan not ue for release on the ate of issue
as a whole r
of termination letter, in case of termination of the contract a
VN
ii in art arts ro ortionate to the contract rice of the ill sche ule to which
the terminate art of work elongs i e
P AxB C where,
P Pro ortionate Bank uarantee Amount
A Contract Price of the articular ill sche ule to which the terminate
art of work elongs
B Performance uarantee amount in terms of CC su clause 2
C Total Contract Price
R
15.5 E p o er The m lo er shall e entitle to terminate the Contract, at an time for the
E tit e e t to m lo er s convenience, giving notice of such termination to the Contractor
Ter i atio or The termination shall take effect 28 a s after the later of the ates on which
Co e ie e the Contractor receives this notice or the m lo er returns the Performance
ecurit The m lo er shall not terminate the Contract un er this u -Clause
in or er to execute the orks himself or to arrange for the orks to e
execute another contractor or to avoi a termination of the Contract the
Contractor un er Clause 16 2 Termination Contractor
After this termination, the Contractor shall rocee in accor ance with u -
Section 6 –General Conditions of Contract Page 90 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
15.6 Corr pt or f the m lo er etermines that the Contractor has engage in corru t,
Fra d e t frau ulent, collusive or coercive ractices, in com eting for or in executing the
Pra ti e Contract, then the m lo er ma , after giving 1 a s notice to the Contractor,
terminate the Contractor s em lo ment un er the Contract an ex el him from
the ite, an the rovisions of Clause 15 shall a l as if such ex ulsion ha
een ma e un er u -Clause 15 2
For the ur oses of this u -Clause
a “corrupt practice” means the offering, giving, receiving of soliciting of any
thing of "value to influence the action of a public official in the
procurement process or in the Contract execution.
“fraudulent practice”
ractice” means a misrepresentation of facts in order to
influence a procurement process or the execution of the Contract to the
includes collusive practice among Bidders
detriment of the Employer, and includes
(prior to or after bid submission) designed to establish bid prices at
L
artificial non-competitive levels and to deprive the Employer of the
benefits of free and open competition.
c “collusive practice” means a scheme or arrangement between two or
more bidders, with or without the knowledge of the Employer, designed to
VN
establish bid prices at artificial, noncompetitive levels.
“coercive practice” means harming or threatening to harm, directly or
indirectly, persons or their property to influence their participation in the
procurement process or affect the execution of a contract.
16.1 Co tra tor f the ngineer fails to certif in accor ance with u -Clause 1 6 ssue of
E tit e e t to nterim Pa ment Certificates or the m lo er fails to com l with u -Clause
S pe d Wor 2 m lo er s Financial Arrangements or u -Clause 1 7 Pa ment , the
Contractor ma , after giving not less than 21 a s notice to the
t m lo er,
sus en work or re uce the rate of work unless an until the Contractor has
R
receive the Pa ment Certificate, reasona le evi ence or a men ment, as the
case ma e an as escri e in the notice
The Contractor s action shall not reju ice his entitlements to interest un er
u -Clause 1 8 Dela e Pa ment an to termination un er u --Clause 16 2
Termination Contractor
f the Contractor su se uentl receives such Pa ment Certificate, evi ence or
a ment as escri e in the relevant u -Clause an in the a ove notice
efore giving a notice of termination, the Contractor shall resume normal
working as soon as is reasona l ractica le
f the Contractor suffers ela an or incurs Cost as a result of sus en ing
work or re ucing the rate of work in accor ance with this u -Clause, the
Contractor shall give notice to the ngineer an shall e entitle su ject to
u -Clause 20 1 Contractor s Claims to
(a) an extension of time for an such ela , if com letion is or will e
ela e , un er u -Clause 8 xtension of Time for Com letion , an
(b) a ment of an such Cost lus rofit, which shall e inclu e in the
Contract Price
Section 6 –General Conditions of Contract Page 91 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
After receiving this notice, the ngineer shall rocee in accor ance with u -
Clause 3 5 Determinations to agree or etermine these matters
16.2 Ter i atio The Contractor shall e entitle to terminate the Contract if
Co tra tor
(a) the Contractor oes not receive the reasona le evi ence within 2 a s
after giving notice un er u -Clause 16 1 Contractor s ntitlement to
us en ork in res ect of a failure to com l with u -Clause 2
m lo er s Financial Arrangements ,
(b) the ngineer fails, within 56 a s after receiving a tatement an
su orting ocuments, to issue the relevant Pa ment Certificate,
(c) the Contractor oes not receive the amount ue un er an nterim
Pa ment Certificate within 2 a s after the ex ir of the time state in
u -Clause 1 7 Pa ment within which a ment is to e ma e e exce t
for e uctions in accor ance with u -Clause 2 5 m lo er s ClClaims ,
(d) a rolonge sus ension affects the whole of the orks as escri e in
u -Clause 8 11 Prolonge us ension , or
(e) the m lo er ecomes ankru t or or insolvent, goes into li ui ation,
ati has a
L
receiving or a ministration or er ma e against him, com oun s w with his
cre itors, or carries on usiness un er a receiver, trustee or manager for
the enefit of his cre itors, or if an act is one or event oc occurs which
un er a lica le aws has a similar effect to an of these ac acts or
events
VN
n an of these events or circumstances, the Contractor ma , u on giving 1
a s notice to the m lo er, terminate the Contract owever, in the case of
su - aragra h or e , the Contractor ma notice terminate
terminat the Contract
imme iatel
The Contractor s election to terminate the Contract shall not reju ice an
other rights of the Contractor,
Contractor un er the Contract or otherwise
E ip e t shall rom tl
(a) cease all further work, exce t for such work as ma have een iinstructe
the ngineer for the rotection of life or ro ert or for tthe safet of
the orks,
(b) han over Contractor s Documents, Plant, aterials an other work, for
which the Contractor has receive a ment, an
(c) remove all other oo s from the ite, exce t as necessar for safet ,
an leave the ite
17. Ri a d Re po i i it
17.1 I de itie The Contractor shall in emnif an hol harmless the m lo er, the
m lo er s Personnel, an their res ective agents, against an from all claims,
amages, losses an ex enses inclu ing legal fees an ex enses in res ect
of
(a) o il injur , sickness, isease or eath, of an erson inclu ing railwa
L
user whatsoever arising out of or in the course of or reason of the
Contractor s esign if an , the execution an com letion of tthe orks
an the reme ing of an efects, unless attri uta le to an negligence,
wilful act or reach of the Contract the m lo er, the m lo er s
Personnel, or an of their res ective agents, an
VN
(b) amage to or loss of an ro ert , real or ersonal other than the
orks , to the extent that such amage or loss arises out of or in the
course of or reason of the Contractor s esign if an , the execution
an com letion of the orks an the reme ing of an efects, u unless
an to the extent that an such amage or loss is attri uta le to an
negligence, wilful act or reach of the Contract e the
the m lo er,
m lo er s Personnel,, their res ective agents, or an one irectl
irec or
in irectl em lo e an of them
The m lo er shall in emnif an hol harmless the Contractor, the
Contractor s Personnel, an their res ective agents, against an from all
R
17.2 Co tra tor The Contractor shall take full res onsi ilit for the care of the orks an
Care o t e oo s from the Commencement Date until the Taking- ver Certificate is
Wor issue or is eeme to e issue un er u -Clause 10 1 Taking ver of the
orks an ections for the orks, when res onsi ilit for the care of the
orks shall ass to the m lo er f a Taking- ver Certificate is issue or is
so eeme to e issue for an ection or art of the orks, res onsi ilit for
the care of the ection or art shall then ass to the m lo er
After res onsi ilit has accor ingl asse to the m lo er, the Contractor
shall take res onsi ilit for the care of an work which is outstan ing on the
ate state in a Taking- ver Certificate, until this outstan ing work has een
com lete
17.3 E p o er The risks referre to in u -Clause 17 elow, insofar as the irectl affect
Ri the execution of the works in the Countr , are
a war, hostilities whether war e eclare or not , invasio
invasion, act of foreign
enemies,
re ellion, terrorism, sa otage ersons other than the C
Contractor s
Personnel, revolution, insurrection, militar or usur e ower, or civil war,
within the Countr ,
L
c riot, commotion or isor er within the Countr ersons other than the
Contractor s Personnel,
munitions of war, ex losive materials, ionising ra iation or contamination
ra io-activit , within the Countr , exce t as ma e attri utau le to the
VN
Contractor s use of such munitions, ex losives, ra iation or ra io-activit ,
e ressure waves cause aircraft or other aerial evices travelling at
sonic or su ersonic s ee s,
f use or occu ation Perma
the m lo er of an art of the Permanent orks,
exce t as ma e s ecifie in the Contract,
g esign of an art of the orks Personne or
the m lo er s Personnel others
for whom the m lo er is res onsi le, an
h an o eration of the forces of nature which is nforeseea le or against
which an ex erience contractor coul not reasona l have een
ex ecte to have taken a e uate reventative recautions
R
17.4 Co e e e o f an to the extent that an of the risks liste in u -Clause 17 3 a ove results
E p o er Ri in loss or amage to the orks, oo s or Contractor s Documents, the
Contractor shall rom tl give notice to the ngineer an shall rectif this loss
or amage to the extent re uire the ngineer
f the Contractor suffers ela an or incurs Cost from rectif ing this loss or
amage, the Contractor shall give a further notice to the ngineer an shall e
entitle su ject to u -Clause 20 1 Contractor s Claims to
(a) an extension of time for an such ela , if com letion is or will e
ela e , un er u -Clause 8 xtension of Time for Com letion , an
(b) a ment of an such Cost, which shall e inclu e in the Contract Price
n the case of su - aragra hs f an g of u -Clause 17 3 m lo er s
isks , Cost shall e a a le
After receiving this further notice, the ngineer shall rocee in accor ance
with u -Clause 3 5 Determinations to agree or etermine these matters
Propert Ri t name, tra e secret or other intellectual or in ustrial ro ert right relating to the
orks an claim means a claim or rocee ings ursuing a claim alleging
an infringement
henever a Part oes not give notice to the other Part of an claim within 28
a s of receiving the claim, the first Part shall e eeme to have waive an
right to in emnit un er this u -Clause
The m lo er shall in emnif an hol the Contractor harmless against an
from an claim alleging an infringement which is or was
(a) an unavoi a le result of the Contractor s com liance with the Contract,
or
(b) a result of an orks eing use the m lo er
(i) for a ur ose other than that in icate , or reasona l to e
inferre from, the Contract, or
(ii) in conjunction with an thing not su lie the Contractor, u
unless
such use was isclose to the Contractor rior to the Base Date or
is state in the Contract
The Contractor shall in emnif an hol the m lo er harmless a against an
L
from an other claim which arises out of or in relation to i the manufacture,
use, sale or im ort of an oo s, or ii an esign for which the Contractor is
res onsi le
f a Part is entitle to e in emnifie un er this u -Clause, the in emnif ing
VN
Part ma at its cost con uct negotiations for the settlement of the claim, an
an litigation or ar itration which ma arise from it The othe other Part shall, at the
contesting the claim This
re uest an cost of the in emnif ing Part , assist in contestin
other Part an its Personnel shall not make an a mission wh which might e
reju icial to the in emnif ing Part , unless the in emnif ing Part faile to take
over the con uct of an negotiations, litigation or ar itration u on eing re ueste
to o so such other Part
17.6 Li itatio o Neither Part shall e lia le to the other Part for loss of us
use of an orks, loss
Lia i it of rofit, loss of an contract or for an in irect or conse uential ue loss or
amage which ma e suffere the other Part in connection with w the
R
17.7 U e o E p o er The Contractor shall take full res onsi ilit for the care of the m lo er
A o odatio / rovi e accommo ation an facilities, if an , as etaile in the ecification,
Fa i itie from the res ective ates of han -over to the Contractor until cessation of
occu ation where han -over or cessation of occu ation ma take lace after
the ate state in the Taking- ver Certificate for the orks
f an loss or amage ha ens to an of the a ove items while the Contractor
is res onsi le for their care arising from an cause whatsoever other than
Section 6 –General Conditions of Contract Page 95 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
those for which the m lo er is lia le, the Contractor shall, at his own cost,
rectif the loss or amage to the satisfaction of the ngineer
18. I ra e
18.1 Ge era n this Clause, insuring Part means, for each t e of insurance, the Part
Re ire e t or res onsi le for effecting an maintaining the insurance s ecifi
ecifie in the
I ra e
relevant u -Clause
herever the Contractor is the insuring Part , each insurance sshall e
L
effecte with insurers an in terms a rove the m lo er T These
terms shall e consistent with an terms agree oth Parties efore
the ate of the etter of Acce tance This agreement of terms s shall take
rece ence over the rovisions of this Clause
VN
herever the m lo er is the insuring Part , each insurance shashall e
effecte with insurers an in terms consistent with the etails annexe to
the ecial Con itions of Contract
f a olic is re uire to in emnif joint insure , the cover sshall a l
se aratel to each insure as though a se arate olic ha een issue
for each of the joint insure f a olic in emnifies a itionitional joint
insure , namel in a ition to the insure s ecifie in this ClClause, i the
Contractor shall act un er the olic on ehalf of these a iti itional joint
insure exce t that the m lo er shall act for m lo er s Personnel,
Perso ii
a itional joint insure shall not e entitle to receive a me ments irectl
R
from the insurer or to have an other irect ealings with the insurer,
an iii the insuring Part sha shall re uire all a itional joint insure to
com l with the con itions sti ulate in the olic
ach olic insuring against loss or amage shall rovi e for a ments
to e ma e in the currencies re uire to rectif the loss or amage
Pa ments receive from insurers shall e use for the rectification of the
loss or amage
The relevant insuring Part shall, within the res ective erio s state in
the Contract Data calculate from the Commencement Date , su mit to
the other Part
(a) evi ence that the insurances escri e in this Clause have een
effecte , an
(b) co ies of the olicies for the insurances escri e in u -Clause
18 2 nsurance for orks an Contractor s ui ment an u -
Clause 18 3 nsurance against njur to Persons an Damage to
Pro ert
(c) f the contractor fails to su mit evi ence an co ies of the olicies
as mentione in a a ove to rove that the olicies have
een o taine within the erio s ecifie in the contract ata, an
su mits the same later on an from the su mitte evi ence it is
foun that the olicies have not een o taine within the erio
s ecifie , the m lo er shall recover ou le the cost of the
remium for the erio the olicies have een ela e
hen each remium is ai , the insuring Part shall su mit evi ence of
a ment to the other Part henever evi ence or olicies are
su mitte , the insuring Part shall also give notice to the ng
ngineer
ach Part shall com l with the con itions sti ulate in each of the
insurance olicies The insuring Part shall kee the insurers informe
of an relevant changes to the execution of the orks an ensur
ensure that
insurance is maintaine in accor ance with this Clause
L
Neither Part shall make an material alteration to the terms o of an
insurance without the rior a roval of the other Part f an insurer
makes or attem ts to make an alteration, the Part first not
notifie the
insurer shall rom tl give notice to the other Part
VN
f the insuring Part fails to effect an kee in force an of the
insurances it is re uire to effect an maintain un er the Cont
Contract, or
fails to rovi e satisfactor evi ence an co ies of olicies in i
accor ance with this u -Clause, the other Part ma at its o tion an
without reju ice to an other right or reme insurance for the
effect insuranc
relevant coverage an a the remiums ue The insuring Part shall
a ou le the amount of these remiums to the other Part , an the
Contract Price shall e a juste accor ingl
Nothing in this Clause limits the o ligations, lia ilities or rres onsi ilities
of the Contractor or the m lo er, un er the other terms of the Contract
R
18.2 I ra e or The Contractor shall insure the orks, Plant, aterials, inclu ing those issue
Section 6 –General Conditions of Contract Page 97 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
Wor a d the m lo er an Contractor s Documents for not less than the full
Co tra tor reinstatement cost inclu ing the costs of emolition, removal of e ris an
E ip e t rofessional fees an rofit, su ject to a maximum value in icate in Contract
Data. This insurance shall e effective from the ate which the evi ence is
to e su mitte un er su - aragra h a of u -Clause 18 1 eneral
e uirements for nsurances , until the ate of issue of the Taking- ver
Certificate for the orks
The insuring Part shall maintain this insurance to rovi e cover until the ate
of issue of the Performance Certificate, for loss or amage for which the
Contractor is lia le arising from a cause occurring rior to the issue of the
Taking- ver Certificate, an for loss or amage cause the Contractor in
the course of an other o erations inclu ing those un er Clause 11 Defects
ia ilit
The insuring Part shall insure the Contractor s ui ment for not less than the
full re lacement value, inclu ing eliver to ite For each it item of Contractor s
ui ment, the insurance shall e effective while it is eing trans
t orte to the
ite an until it is no longer re uire as Contractor s ui me
ment
nless otherwise state in the ecial Con itions of Contract, insurances
L
un er this u -Clause
(a) shall e effecte an maintaine the Contractor as insuring Part ,
(b) shall e in the joint names of the Parties, who shall e jointl entitle to
receive a ments from the insurers, a ments eing hel or allo allocate
VN
etween the Parties for the sole ur ose of rectif ing the loss or amage,
(c) shall cover all loss an amage from an cause not liste in u -Clause
17 3 m lo er s isks ,
(d) shall also cover loss or amage to a art of the orks which is
attri uta le to the use or occu ation the m lo er of anothe
another art of
the orks, an loss or amage from the risks liste in su - ara aragra hs
c , g an h of u -Clause 17 3 m lo er s isks , exclu iing in each
case risks which are not insura le at commerciall reasona le terms,
with e ucti les er occurrence of not more than the amount statesta in
aragra h
the Contract Data if an amount is not so state , this su - ara
R
shall not a l , an
(e) ma however exclu e loss of, amage to, an reinstatement of
i art of the orks which is in a efective con ition ue to a
efect in its esign, materials or workmanshi ut cover shall
inclu e an other arts which are lost or amage as a irect
result of this efective con ition an not as escri e in su -
aragra h ii elow ,
ii a art of the orks which is lost or amage in or er to
reinstate an other art of the orks if this other art is in a
efective con ition ue to a efect in its esign, materials or
workmanshi ,
iii a art of the orks which has een taken over the m lo er,
exce t to the extent that the Contractor is lia le for the loss or
amage, an
iv oo s while the are not in the Countr , su ject to u -Clause
1 5 Plant an aterials inten e for the orks
f, more than one ear after the Base Date, the cover escri e in su -
L
VN
R
18.3 I ra e a ai t The insuring Part shall insure against each Part s lia ilit for an loss,
I r to Per o amage, eath or o il injur which ma occur to an h sical ro ert
a d Da a e to exce t things insure un er u -Clause 18 2 nsurance for orks an
Propert Contractor s ui ment or to an erson exce t ersons insure un er u -
Clause 18 nsurance for Contractor s Personnel , which ma arise out of the
Contractor s erformance of the Contract an occurring efore the issue of the
Performance Certificate
This insurance shall e for a limit er occurrence of not less than the amount
state in the Contract Data, with no limit on the num er of occurrences f an
amount is not state in the Contract Data, this u -Clause shall not a l
nless otherwise state in the ecial Con itions of Contract, the insurances
s ecifie in this u -Clause
a shall e effecte an maintaine insur
the Contractor as insuring Part ,
shall e in the joint names of the Parties,
c shall e exten e to cover lia ilit for all loss an amag to the
amage
L
m lo er s ro ert inclu ing ailwa s Pro ert exce t things insure
erforma
un er u -Clause 18 2 arising out of the Contractor s erformance of the
Contract, an
ma however exclu e lia ilit to the extent that it arises from
VN
(i) the m lo er s right to have the Permanent orks execute on,
over, un er, in or through an lan , an to occu this lan fo
for the
Permanent orks,
(ii) amage which is an unavoi a le result of the Contractor s
o ligations to execute the orks an reme an efects, an
(iii) a cause liste in u -Clause 17 3 m lo er s isks , exce t to the
extent that cover is availa le at commerciall reasona le terms
Per o e losses an ex enses inclu ing legal fees an ex enses arising from injur ,
sickness or isease n a ition the contractor shall also maintain
main insurance
eath of an erson em lo e
against lia ilit for claim of eat the Contractor or
an other of the Contractor s Personnel
The m lo er an the ngineer shall also e in emnifie un er the olic of
insurance, exce t that this insurance ma exclu e losses an claims to the
extent that the arise from an act or neglect of the m lo er or of the
m lo er s Personnel
The insurance shall e maintaine in full force an effect uring the whole time
that these ersonnel are assisting in the execution of the orks For a
u contractor s em lo ees, the insurance ma e effecte the
u contractor, ut the Contractor shall e res onsi le for com liance with this
Clause
19. For e Ma e re f at an time, uring the continuance of this contract, the erformance in whole
or in art either art of an o ligation un er this contract shall e revente
or ela e reason of an war, hostilit , acts of u lic enem , civil
commotion, sa otage, serious loss or amage fire, ex losions, e i emics,
strikes, lockouts or acts of o hereinafter referre to events rovi e ,
Section 6 –General Conditions of Contract Page 100 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
notice of the ha ening of an such event is given either art to the other
within 1 a s from the ate of occurrence thereof, neither art shall
reason of such event, e entitle to terminate this contract nor shall either art
have an claim for amages against the other in res ect of such non-
erformance of ela in erformance, an works un er the contract shall e
resume as soon as ractica le after such event has come to an en or
cease to exist, an ecision of the ngineer as to whether the works have
een so resume or not shall e final an conclusive, P D DF T
that if the erformance in whole or in art of an o ligation un er this contract
is revente or ela e reason of an such event for a continuous erio
excee ing 8 a s, either art ma at its o tion terminate the contract
giving notice to the other art
19.1 Payment and on such termination, the ngineer shall etermine the value of the
elease in case of work one an issue a Pa ment Certificate which shall inclu e
ptional (a) Theamounts a a le for an work carrie out for which a
Termination rice is state in the contract;
(b) TheCost of Plant an aterials or ere for the orks
which have een elivere to the Contractor, or of which
L
the contractor is lia le to acce t eliver this Plant an
materials shall ecome the ro ert of an e at the risk
of the m lo er when ai for the m lo er, the
Contractor shall lace the same at the m lo er s
is osal;
VN
(c) therCosts or lia ilities su orte necessar
ocumentar evi ence which in the circumstances were
reasona l an necessaril incurre the Contractor in
the ex ectation of com leting the orks as er mutuall
agree rogramme.
20. C ai , Di p te a d Ar itratio
20.1 Co tra tor f the Contractor consi ers himself to e entitle to an exten
extension of the Time
C ai for Com letion an or an a itional a ment, un er an Clause of these
Con itions or otherwise in connection with the Contract, the Contractor shall
give notice to the ngineer, escri ing the event or circumstance giving rise to
the claim The notice shall e given as soon as ractica le, an not later than
28 a s after the Contractor ecame aware, or shoul have ecome aware, of
the event or circumstance
f the Contractor fails to give notice of a claim within such erio of 28 a s,
the Time for Com letion shall not e exten e , the Contractor shall not e
entitle to a itional a ment, an the m lo er shall e ischarge from all
lia ilit in connection with the claim therwise, the following rovisions of this
u -Clause shall a l
The Contractor shall also su mit an other notices which are re uire the
Contract, an su orting articulars for the claim, all as relevant to such event
or circumstance
Section 6 –General Conditions of Contract Page 101 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
L
(c) the Contractor shall sen a final claim within 28 a s after th
the en of the
effects resulting from the event or circumstance, or within suc
such other
erio as ma e ro ose the Contractor an a rove the
ngineer
VN
ithin 2 a s after receiving a claim or an further articulars su orting a
revious claim, or within such other erio as ma e ro ose the
ngineer an a rove the Contractor, the ngineer shall res on with
a roval, or with isa roval an etaile comments e ma als also re uest
an necessar further articulars, ut shall nevertheless give his res onse on
the rinci les of the claim within such time
ach Pa ment Certificate shall inclu e such amounts for an claimcla as have
een reasona l su stantiate as ue un er the relevant rovision rovisi of the
sufficient to su stantiate
Contract nless an until the articulars su lie are suffici
the whole of the claim, the Contractor shall onl e entitle to t a ment for
such art of the claim as he has een a le to su stantiate
R
20.2 A i a e n case an is ute etween the ngineer an the Contractor for which claim
Sett e e t has alrea een ma e the contractor, remains unresolve , the Contractor
shall, then, give notice of issatisfaction an intention to commence ar itration
to the m lo er ul s ecif ing the su ject of the is ute or ifference as also
the amount of claim item wise The Parties shall make attem ts to settle the
is ute amica l efore the commencement of ar itration as er roce ure
lai own in olic letter no C Polic Ar itration 2007-08 ate 26 12 2018 or
Section 6 –General Conditions of Contract Page 102 of 108
Base on BD u ate u to 02.05.2020 for e-tendering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
20.3 Ar itratio Any dispute, in respect of which amicable settlement has not been reached,
arising between the Employer and the Domestic or Foreign Contractor related
to any matter arising out of or connected with this contract, then the contractor
shall be entitled to demand in writing that the dispute or difference be referred
to arbitration.
Only such dispute(s) or difference(s) in respect of which the demand had been
made for amicable settlement under GCC 20.2 but could not be settled, shall be
cumulative amount of claims
referred to arbitration subject to the condition that cumulativ
in the contract is not exceeding 20% of the contract price. In case the
cumulative amount of claims exceeds 20% of the contract price, arbitration
clause will not be applicable.
writ
The Arbitration proceedings shall commence from the day, a written and duly
L
quantified demand for arbitration is received by Chairman and Managing
M
Director, Rail Vikas Nigam Limited, New Delhi (CMD/RVNL).
arbitration
The disputes so referred to arbitr ation shall be settled in accordance
acc with the
Indian Arbitration & Conciliation Act, 1 6 and any statutory modification
m or
VN
re-enactment thereof.
Further, it is agreed between the parties as under:
20.3.2
appointed as per following procedure:
(a) The Contractor, while invoking demand for arbitration, shall submit to
CMD/RVNL, claims duly quantified along with name and contact details
of his nominee arbitrator. Thereafter, he Employer will nominate his
nominee arbitrator within a period of 30 days from receipt of such
demand from the Contractor and will issue letter of appointment to both
the arbitrators appointed by the parties with a copy to the Contractor.
(b) The third Arbitrator shall be chosen by the two Arbitrators so appointed
by the parties and shall act as Presiding Arbitrator. In case of failure of
the two Arbitrators appointed by the parties to reach upon consensus
within a period of 30 days from the appointment of the Arbitrators
subsequently appointed, then, upon the request of either or both parties,
the Presiding Arbitrator shall be appointed by the Chairman and
L
an experience as
arbitrators to be appointed shall have minimum qualification and
under:
Arbitrator shall be;
a working/retired officer (not below E- grade and above in a P
PSU with which
VN
RVNL has no business relationship) of any discipline of Engineering
Enginee or
Management of
Accounts/Finance department, having experience in Contract Mana
construction contracts; or
or
below the AG level) of any Engineering/Accounts
a retired officer (retired not below Engi
Services of Central Government, having experience in Contract M Management of
retired more than 3
construction contracts; ora retired officer who should have ret
years previously from the date of appointment as Arbitrator (retired
(re not below
E- grade in RVNL or a PSU with which RVNL has a business relat relationship) of
any Engineering discipline or Accounts department, having experience
exper in
Contract Management of construction contracts.
R
Neither party shall be entitled to suspend the orks, nor shall payment to the
Contractor be withheld on account of such proceedings
If the contractor(s) does/do not prefer his/their specific and final claims in
writing, within a period of 0 days of receiving the intimation from the
20.3.7
Employer/Engineer that the final bill is ready for signature of the
contractor(s), he/they will be deemed to have waived his/their claim(s) and the
Employer shall be discharged and released of all liabilities under the contract
in respect of these claims.
L
detailed reasons upon which it is based.
T
Any ruling on award shall be made by a majority of members of Tribunal. In
Arbi
the absence of such a majority, the views of the Presiding Arbitrator shall
20.3.10 prevail.
VN
A party may apply for correction of any computational errors, aany
typographical or clerical errors or any other error of similar nature occurring
in the award of a tribunal and interpretation of specific point of award to
tribunal within 60 days of the receipt of award.
A party may apply to tribunal within 60 days of receipt of awar
award to make an
additional award as to claims presented in the arbitral proceed
proceedings but omitted
from the arbitral award.
here the Arbitral award is for the payment of money, no intere
interest shall be
R
20.3.11 payable on whole or any part of the money for any period till tthe date on
which the award is made.
The fees and other charges of the conciliator/arbitrators shall be as per the fee
20.3.12 structure fixed by the employer (enclosed as Annexure 3 to section 7) and as
amended from time to time irrespective of the fact whether the Arbitrator(s)
is/are appointed by the parties or by the Court of law unless specifically
directed by on’ble Court otherwise on the matter, and shall be shared equally
by the Employer and the Contractor. owever, the expenses incurred by each
party in connection with the preparation, presentation will be borne by itself.
21. ri di tio o The Contract Agreement shall e su ject to exclusive juris iction of Courts as
o rt in icate in the Contract Data
PP N
L
em
Act on satisfaction of certain con itions on se aration if an em lo ee has
com lete 5 ears service or more or on eath the rate of 15 a s wages for
ever com lete ear of service The Act is a lica le to all e esta lishments
em lo ing 10 or more em lo ees
VN
c E p o ee P.F. a d Mi e a eo Pro i io A t 1952 ( i e a e ded):
The Act Provi es for monthl contri utions the em lo er lus workers
10 or 8 33 The enefits a a le un er the Act are
miscarriage etc
enefits to women em lo ees in case of confinement or miscarria
e Co tra t La o r (Re atio & A o itio ) A t 1970 The Act rovi es for
certain welfare measures to e rovi e the Contractor to contract la our
an in case the Contractor fails to rovi e, the same are re ui uire to e
rovi e , the Princi al m lo er aw The Princi al m lo er is
re uire to take Certificate of egistration an the Contractor is re uire to
take license from the esignate fficer The Act is a lica le to the
esta lishments or Contractor of Princi al m lo er if the em lo 20 or more
contract la our
L
the ur ose of a lica ilit of this Act
l Trade U io A t 1926: The Act la s own the roce ure for registration of
R
Fa torie A t 1948 The Act la s own the roce ure for a roval at lans
efore setting u a factor , health an safet rovisions, welfare
welfare rovisions,
L
working hours, annual earne leave an ren ering information re regar ing
acci ents or angerous occurrences to esignate authorities t is a lica le
to remises em lo ing 10 ersons or more with ai of ower or 2 20 or more
ersons without the ai of ower engage in manufacturing rocess
roce
VN
T e E p o ee State I ra e A t, 1948 (A t No. 34 o 1948)
(Pro i io a e te ded ro ti e to ti e):An e):An Act to rovi e for certain
enefits to em lo ees in case of sickness, maternit an em lo ment injur
an to make rovision for certain other matters in relation thereto
the
R
L
Spe ia Co ditio o Co tra t
VN
Part A: Co tra t Data
R
Left Blank
R
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
Section
L
VN
Spe ia /Parti ar Co ditio o
Co tra t
R
L
Besi es Toll gunge ailwa tation
Kolkata-700 033
Tel 033 2 2 -7338
Fax 033 2 2 -7332
VN
E- ai : te der o 2 ai . o
ngineer s na e and
address
efects otification
Period
E tire Wor
PACKAGE ANVS: C N T CT N F
AD CT, A P ND ND CC
R
B C T C ,B P N
NC D N AT D K F 3 520
K N T F C 25891 527 T C
29 10 989 B T N TN P CP-760
N A C T C NT - T N
P NT T T A A AT B AN
BANDA TAT N A D NC D N T
TAT N AB ND A T T A P AD ont s
T A A D K
A C T CT A , CT CA ,
C AN CA , AT N , NT AT N, A
C ND T N N , F D T CT N, F
PP N T P B C A T
N N N K NN A A-
B ANBANDA T C D F
K KATA T A A N , T
B N A
Key Dates
Ke 02 onths from
Date 1 Commencement Key Dates as per Attachment
Ke 03 onths from “A” of Section -5 of Works
Date 2 Commencement Requirement, Chapter-1
Ke 15 onths from
Date 3 Commencement
Ke 18 onths from
Date Commencement
Ke 21 onths from
Date 5 Commencement
Ke 2 onths from
Date 6 Commencement
Ke 27 onths from
Date 7 Commencement
L
Ke 30 onths from
Date 8 Commencement
Ke 33 onths from
Date 9 Commencement
VN
Ke 36 onths from
Date 10 Commencement
lectronic
trans ission syste s
ddress for Chief Project anager K - ,
o unication to ail ikas Nigam imite ,
loyer 2 , Desh ran hasmal oa
Besi es Toll gunge ailwa tation
Kolkata-700 033
Tel 033 2 2 -7338
R
L
letter of awar an in the same currenc ies of the Acce te
Contract amount in the rescri e form vali for a erio of 28 a s
e on issue of erformance certificate
Proportionate 4.2
Performance
VN
NOT APPLICABLE
Security for a
particular
section
or al orking
ours
o ence ent of
orks
Ti ing of o ili ation First nstallment within 21 Twent one a s from the ate of recei t of
d ance Pay ent guarantee acce ta le to m lo er
econ nstallment shall e release onl when the contractor s su mits
statement of having utili e the First nstallment of mo ili at
ation A vance
an the m lo er is satisfie that the utili ation has een one in
ur oseful manner This shall e release within 21 a s from the ate
of recei t of guarantee acce ta le to the m lo er
L
d ance Pay ent The total a vance for Plant an achiner shall e limite to 5 of the
against Plant and Contract rice ach time a vance shall e ai within 21 a s from the
ac inery
ate of recei t of guarantee acce ta le to the m lo er su ject to the
fulfillment of other con itions
itions of the su -clause
VN
Interest on d ance At the rate of 8.15 % (Eight point One Five Per cent) simple interest per
Pay ent
annum on reducing balances.
e ay ent rate of 13 5 Thirteen an half ercent of the amount of each a ment if the
d ance ay ent a vance taken is 10 of the contract rice
20 Twent ercent of the amount of each a ment if the a van vance
taken is 15 of the contract rice
f the total a vance taken is less, the rate of recover shall e
ro ortionate
n case further a vance is taken un er su -clause 1 2 1 an or 1 2 2,
after re a ment has alrea een starte , the e a ment ate
shall e revise in the next a ment certificate as er following formula
R
L
Pre-stresse ca les igh Tensile steel
mployers Ban details 14.7.1
for
Periods for
su ission of
R
insurance
a) e idence of
insurance a 1 a s
) rele ant 28 a s
olicies
a i u a ount of N
deducti les for
insurance of
loyer s risks
ini u a ount of
insurance y t e 100 un re ercent of contract
ontractor for orks
and ontractor s
Plant and aterials
including loss or
da age to
e ui ent
L
VN
R
Section
L
VN
Spe ia /Parti ar Co ditio o
Co tra t
Part B: Specific Provisions
R
SECTION 7
PART B
L
VN
R
Ta le of lauses
L
Percentages governing Price Adjustment
13.8 Annexure 2B Adjustments for changes in cost, 12
Percentages governing Price Adjustment for E&M
orks
VN
20.3.12 Annexure 3 Fee Structure for Arbitrators/ 15
Reconciliators
20.2 Annexure 4 Procedure for Amicable Settlement in 18
Contracts
R
A e re 1 to Se tio 7
L
VN
R
L
VN
R
L
VN
R
L
VN
R
L
a) In case the CRS has authorized the opening of the section(s)
d
within 45 days from the date of signing the application, then date
of authorization shall be the date of completion.
b) In case the CRS has not authorized opening of the section(s) after
af
VN
having come for inspection within 45 days from the date of
signing the application, then the section(s) shall not be treated
treat as
substantially completed for the purposes of bonus under this
clause.
For the purpose of calculating bonus payments, the time given iin the Bid
for completion of the whole works or any section(s) is fixed anand unless
granting an
otherwise agreed, no adjustment of the time by reasons of grant
extension of time pursuant to clause 8.4 or any other clause of these
conditions will be allowed. Any period falling short of comple
completed month
shall be ignored for the purpose of computing the period relevant
releva for the
R
payment of bonus.
B. PCC or RE Co tra t
the date 45 days after the date of charging, for the purposes of bonus
under this clause subject to the conditions that:-
a) In case the CRS has authorized the opening of the section(s)
within 45 days from the date of signing the application, then date
of authorization shall be the date of completion.
b) In case the CRS has not authorized opening of the section(s) after
having come for inspection within 45 days from the date of
signing the application, then the section(s) shall not be treated as
substantially completed for the purposes of bonus under this
clause.
For the purpose of calculating bonus payments, the time given in the Bid
for completion of the whole works or any section(s) is fixed and
an unless
otherwise agreed, no adjustment of the time by reasons of granting
grant an
extension of time pursuant to clause 8.4 or any other clause of these
L
conditions will be allowed. Any period falling short of completed
comple month
releva for the
shall be ignored for the purpose of computing the period relevant
payment of bonus.
VN
C. PCC or Road ed Co tra t
L
. Bonus for If the Contractor achieves completion of the whole of the orks or any
early section(s) prior to the intended Completion Date prescribed in Contract
completion: data (Extension of time pursuant to Clause 8.4 or any other cla clause of
these conditions will not be considered), the Employer shall pa pay to the
VN
Contractor a sum stated in the Contract data as bonus for early
completion, for every calendar month which shall elapse between the
date of completion of all items of works as stipulated in the ccontract,
including variations ordered by the Engineer and the time presc
prescribed in
Clause 8.2. owever, on completion of all PSC girder/slab brid bridges
including protection works and successful passing of load testing but
girder bridges,
excluding linking of track, and on completion of all steel gird
if any, including protection works but excluding load testing aand linking
of track on steel girder bridges, the section shall be consider
considered to be
substantially completed for the purposes of bonus payment under this
R
Fixed Px 15 15 15 15 15 15 15 15 15
Labour Pl 15 15 25 25 5 15 5 25 25
Steel P
s 0 50 5 5 75 10 0 20 0 ee
to
4 Cement Pc 15 0 15 5 0 0 75 15 0 nne
Plant u e
Machinery Pp 20 10 20 20 0 20 0 0 20 B to
L
& Spares Se t
Fuel and on
Pf 20 5 15 15 5 25 5 10 20
Lubricants
Other
Pm 15 5 5 15 0 15 0 15 20
VN
Materials
Total 100 100 100 100 100 100 100 100 100
Note:
(i) For Coefficients governing the adjustment of changes in cost for works related to Electrical,
M&P and Fire Fighting, Refer to Annexure 2B to Section 7.
(ii) Under GCC clause 13.8 (c) (iii) relating to adjustment for Steel Component Formula‐I is for
all schedules except bill/schedule‐2B and 2C, Formula‐II and III is only for bill/Schedules
2B and 2C respectively. Since in the present BOQ there are no such bill/schedules as Bill 2B
and 2C, it is clarified that Formula‐II is applicable only for Schedule‐A2 and Formula‐III is
applicable for Schedule‐A5 and Formula‐I is applicable for all other Schedules of the instant
tender.
ection 7 - Particular Con itions of Contract Part B Page 11 of 19
Base on BD u ate u to 02 05 2020 for e-ten ering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
10 Price ariation
11 Prices uote the Ten erer shall e fixe throughout the Ten erer s erformance of the
Contract an not su ject to variation on an account exce t for items in icate in following
clause
12 The following e ui ment items exce t mil steel i ing use
use in firefighting - for mil steel
variatio as er relevant
i ing refer Para 1 3 elow shall e su ject to rice variation A
formula, given at Para 1 16 elow
Ta e 1: Ite der Pri e Variatio or a t e Pa a e
L
escri tion o Packages ulti lier factor
under P
1 Sc edule 1
VN
Sc edule 1
Sc edule
R
13 For mil steel i ing use in fire Detection tem No 10 1 10 6 Pi ing for Fire Fighting
f
s stem, che ule- the rice a justment shall e one as er formula given elow
Vs Ps / 100 X RI X (S1-S0) / S0
Vs Increase or decrease in the cost of work on the date under consideration due
to changes in the rates for Steel.
S0 The weighted average of index Numbers of holesale Prices in India by
Groups and Sub Groups (Averages) for
(i) MS Bright Bars under Mild Steel -Long Products sub-group
(weight 1)
(ii) Angles, Channels, Sections, steel (coated/not) under Mild
Steel -Long Products sub-group (weight 2)
ection 7 - Particular Con itions of Contract Part B Page 12 of 19
Base on BD u ate u to 02 05 2020 for e-ten ering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
L
to which a particular interim payment certificate is related.
Ps Percentage of Steel component of the work.
17 The total a missi le rice variation amount for this Contract for lectrical Air Con itioning,
Fire Detection shall e su ject to a ceiling of 5 lus min
minus five ercent of the total
Contract Price of che ules D
18 D T D
19 Price variation that ma accrue uring the erio from the ate of ten er su mission will not
e consi ere for Ten er evaluation an for eci ing inter-se osition of the Ten erers
1 10 The erio of rice variation will e limite from the first working a of the Calen ar month,
one month rior to the ate of o ening of ten er to the first working a of the calen ar
month covering the ate two months rior to the ate of eliver rovi e however, in no
case such rice variation is a missi le e on 12 months after he ate of issue of etter of
Acce tance of the ten er n the case of eliver within 12 months from the ate of issue of
etter of Acce tance, the a lica le in ices governing, the ate of eliver are however as
er l A formula No escalation is however a a le for the exten e erio if such
extension is ue to the failure of the contractor
1 11 The amount as er formula mentione at 1 16 shall e e ucte from the ill in the
event of negative scalation variation
ection 7 - Particular Con itions of Contract Part B Page 13 of 19
Base on BD u ate u to 02 05 2020 for e-ten ering
RVNL/KOL/New Garia-Airport/Metro/ANVS June’2020
Note :
a t ma lease e note that onl latest notifications circ
circulars
ulars issue efore the ase
L
ate shall e consi ere for rice a justment
The a ove Notifications Circulars are for reference of the Ten erer an these are
also availa le on A we site www ieema org an for latest one, ten erer has
to own loa the current ones
VN
R
L
VN
R
L
VN
R
L
VN
R
L
VN
R
L
VN
R
This Section contains forms which, once completed, will form part of the
Contract. The forms for Performance Security and Advance Payment Security,
when required, shall only be completed by the successful Bidder after contract
award.
All italicized text is for guidance how to prepare the various forms and shall be
deleted from the final documents.
L
Ta e o For
Letter o A epta e
[on letterhead paper of the Employer]
. . . . . . . date. . . . . . .
L
amount in numbers and words and name of the currency]. . , as correcte an
mo ifie in accor ance with the nstructions to Bi ers, is here here acce te
Authori e ignature
Co tra t A ree e t
T A NT ma e the a of , etween Name of the
Employer. . . hereinafter the m lo er , of the one art, an
name of the Contractor]. . 1. . . hereinafter the Contractor , of the other art
L
construe as art of this Agreement This Agreement shall revail
revail over all
other Contract ocuments
- the Drawings;
Drawings;
- the ork s e uirements
- the com lete che ules inclu ing rice Bill of uantities
- An other ocuments
1
In case Contractor is a Joint Venture the ‘name of the contractor’ shall be inserted as under :
“the Joint Venture under the name and title of ……, comprising of ….[Lead Partner] ;…….; and
…..”
ection 8 Contract Forms Page 3 of 22
Base on BD u ate u to 02 05 2020 for e-ten ering
RVNL/KOL/New Garia-Airport/Metro/ANVS e 2020
igne igne
L
itness, Name, ignature, A ress, Date ignatu
itness, Name, ignature,
A ress, Date
VN
R
COF/3
FORM OF CONTRACTPERFORMANCE SECURITY
(BANK GUARANTEE)
Refer Clause 41 of Instructions to Bidders]
(On non-judicial stamp paper of the appropriate value in accordance with
stamp Act. The stamp paper to be in the name of Executing Bank).
Fro :
Name an A ress of the Bank
To:
The Chairman an anaging Director,
ail ikas Nigam imite ,
1st Floor, August Kranti Bhawan,
Bhikaji Cama Place, K Puram,
New Delhi-110 066
L
A , ail ikas Nigam imite , hereinafter calle the E p o er, acting
through [Insert Designation and address of the Employer’s
Representative],, has acce te the i of [Insert Name and address of the
Contractor],, hereinafter calle the Co tra tor, for the work of [Insert Name of
VN
Work],, vi e Notification of Awar No [Insert Notification of Award No.]
AND
L
5 The Bank uarantee shall e uncon itional an irrevoca le
8 This guarantee is vali an effective from the ate of iits issue, which is
[insert date of issue] The guarantee an our o ligations un er it will
ex ire on [Insert the date twenty eight days after the expected end
R
12 The Bank here un ertakes not to revoke the guarantee uring its
currenc , exce t with the revious consent in writing of the em lo er
This guarantee is su ject to the niform ules for Deman uarantees,
CC Pu lication No 758
Date
Place Signature of Authorised person of Bank]
L
[Name in Block letters]
VN
……………………..
[Designation]
……….……………
[P/Attorney] No.
…………………….
Bank’s Seal
[P/Attorney] No.……
itness
R
1. Signature
Name & Address & Seal
2. Signature
Name & address & Seal
Note :
1 All italicized text is for guidance on how to prepare this bank guarantee
and shall be deleted from the final document.
2 In case the guarantee is issued by a foreign Bank, which does not have
operations in India, the said bank shall have to provide a counter-
guarantee by State Bank of India.
3 In case the Contractor is a JV, the Performance Security is required to
be furnished on behalf of the JV in favour of the Employer by the JV
Partners in proportion of their respective percentage share specified in
the JV Agreement. The percentage share of M/s [Insert Name of the
JV Partner] in the JV is [ Fill share % in the JV ] percent. All the
Bank Guarantee of JV Partners are liable to be encashed cumulatively.
L
VN
R
(BANK GUARANTEE)
[Refer Clause 35.5 of Instructions to Bidders]
(On non-judicial stamp paper of the appropriate value in accordance with stamp Act.
The stamp paper to be in the name of Executing Bank)
Fro :
Name and Address of the Bank…
To:
The Chairman an anaging Director,
ail ikas Nigam imite ,
1st Floor, August Kranti Bhawan,
Bhikaji Cama Place, K Puram,
New Delhi-110 066
A , ail ikas Nigam imite , hereinafter calle the E p o er, acting through
Representative] has acce te
[Insert Designation and address of the Employer’s Representative],
the i of [Insert Name and address of the Contractor],
Contractor], hereinafter calle the
Co tra tor, for the work of [Insert Name of Work],
Work], vi e Notification of Awar
No [Insert Notification of Award No.]
L
AND
A , the contractor is re uire to furnish a itional Performance
Performance ecurit for
the sum of [Insert Value of additional Pe required] in the form
rformance Security required],
Performance
VN
of ank guarantee, eing a con ition rece ent to the signing o of the contract
agreement
Bank], with its Branch [Address] having its
A , [Insert Name of the Bank],
ea uarters office at [Address]
[Address],, hereinafter calle the Ba , acting through
[Designation(s) of the author
authorised Bank], have, at the re uest of the
ised person of the Bank]
nsert name of the artner , a artner on ehalf of the contractor, agree to give
containe
guarantee for a itional erformance securit as hereinafter co
1 KN A N these resent that e the un ersigne [Insert name(s) of
Bank] eing full authori e to sign an
authorized representatives of the Bank],
incur o ligations for an on ehalf of the Bank,
Bank confirm that the Bank, here ,
uncon itionall an irrevoca l guarantee to a the m lo er the t full amount in
R
The Bank shall a the amount as eman e imme iatel on resentation of the
eman m lo er without an reference to the contractor an without the
m lo er eing re uire to show groun s or give reasons for its eman or the
amount eman e
5 The Bank uarantee shall e uncon itional an irrevoca le
6 The guarantee herein efore shall not e affecte an change in the
constitution of the Bank or in the constitution of the Contractor
7 The Bank agrees that no change, a ition, mo ifications to the terms of the
Contract Agreement or to an ocuments, which have een or ma e ma e
etween the m lo er an the Contractor, will in an wa release us from the
lia ilit un er this guarantee an the Bank, here , waives an re uirement for
notice of an such change, a ition or mo ification to the Bank
8 is
This guarantee is vali an effective from the ate of its issue, which is [insert
date of issue] The guarantee an our o ligations un er it will ex ire on [Insert
ected end of defect liability period]
the date twenty eight days after the expected
All eman s for a ment un er the guarantee must e receive us on or
efore that ate
9 The Bank agrees that the m lo ers right to eman a ment of
L
aforementione full amount in one instance or eman i
a ments in arts
totaling u to the aforementione full amount in several instances
instances will e vali
until either the aforementione full amount is ai to the m lo l er or the
guarantee is release m lo er efore the x ir ate
VN
10 The Bank agrees that its o ligation to a an amount eman e the
unti the amount
m lo er efore the ex ir of this guarantee will continue until
eman e has een ai in full
11 The ex ressions Bank an m lo
lo er herein efore use i
shall inclu e their
res ective successors an assigns
12 The Bank here un ertakes not to revoke the guarantee uring urin its currenc ,
exce t with the revious consent in writing of the em lo er This
Th guarantee is
su ject to the niform ules for Deman lica
uarantees, CC Pu lication No 758
13 The uarantee shall e in a ition to an without reju ice to an other securit
uarantee s of the contractor in favour of the m lo er availa le with the
R
Pr
m lo er The Bank, un er this uarantee, shall e eeme as Princi al De tor
of the m lo er
Date
Place [Signature of Authorised person of Bank]
…………………….
[Name in Block letters]
……………………..
[Designation]
……….……………
[P/Attorney] No.
…………………….
Bank’s Seal
[P/Attorney] No.……
Witness:
1. Signature
Name & Address & Seal
2. Signature
Name & address & Seal
Note :
1 All italicized text is for guidance on how to prepare this bank guarantee and shall be
deleted from the final document.
2 In case the guarantee is issued by a foreign Bank, which does not have operations in
India, the said bank shall have to provide a counter-guarantee by State Bank of India.
L
3 The Bank Guarantee should be duly attested by Notary public with notarial stamp of
appropriate value affixed thereon.
4 In case the Contractor is a JV, the additional Performance Security is required to be
furnished on behalf of the JV in favour of the Employer by the JV Partner(s) who is
responsible for execution of schedule(s) (as per JV agreement) against which
VN
additional Performance Security is required to be submitted in terms of ITB 35.5. All the
Bank Guarantee of JV Partners are liable to be encashed cumulatively.
R
(On non-judicial stamp paper of appropriate value in accordance with stamp Act.
The stamp paper to be in the name of Executing Bank)
rom
[Name and Address of the Bank]
To
The Chairman and Managing Director,
Rail Vikas Nigam Limited,
1st Floor, August rantiBhawan,
L
BhikajiCama Place, R. .Puram,
New Delhi 110 066
EREAS, Rail Vikas Nigam Limited hereinafter called the mployer has
entered into Contract No. ..reference Contract….]dated [………….]
reference number of the Contract….]
for the execution of [name of the contract] hereinafter called the ontract
with[….name
[….name of the Contractor….] hereinafter called the ontractor .
EREAS, according to the Conditions of the Contract, an advanc advance payment is
R
guarantee(s).
admissible to the contractor against submission of bank guarant
At the request of the Contractor, we [….name of the Bank….] with our branch
at[….address….],having
having our ead Office at [….address….] (hereinafter called the
Ban have, at the request of [......Insert name of the JV partner.....], a JV partner on
behalf of the Contractor, agreed to give the said guarantee as hereinafter contained:
. The Bank undertakes to immediately pay to the Employer, without any demur,
reservation or recourse, any amount up to and including aforementioned full
amount upon first written demand/demands from the Employer.
. On payment of any amount less than aforementioned full amount, as per
demand of the Employer, the guarantee shall remain valid for the balance
amount i.e. the aforementioned full amount less the payment made to the
Employer.
4. The Bank shall pay the amount so demanded without any reference to the
contractor and without the Employer being required to show grounds or give
reasons for its demand or the amount demanded.
. The guarantee hereinbefore shall not be affected by any change in the
constitution of the Bank, the Contractor or the Employer.
. The Bank agrees that no change, addition, modification to the tterms of the
Contract Agreement or to any document, which have been or may b be made
between the Employer and the Contractor, will in any way release
release us from the
liability under this guarantee; and the Bank, hereby, waives any
any requirement for
notice of any such change, addition or modification to the Bank.
Bank.
L
. This guarantee is valid and effective from the date of it’s issue,
issue, which is
[….date of issue….].. The guarantee and our obligations under it will expire on
dated ..[….Please 5….]. All demands for payment under the
[….Please refer note 4 & 5….].
VN
guarantee must be received by us on or before that date.
. The Bank agrees that the Employer’s right to demand payment of
aforementioned full amount in one instance or demand payments iin parts
totaling up to the aforementioned full amount in several instan
instances will continue
until either the aforementioned full amount is paid to the EmplEmployer or the
guarantee validity period expires.
. The Bank agrees that it’s obligation to pay any amount demanded by the
until the amount
Employer before the expiry of this guarantee will continue unti
demanded has been paid in full.
R
. The expressions Bank and Employer herein before used shall incl
include their
respective successors and assigns.
. The Bank hereby undertakes not to revoke the guarantee during iits currency,
This guarantee is
except with the previous consent in writing of the employer. Th
subject to the Uniform Rules for Demand Guarantees, ICC Publica
Publication No. 758.
ated ......................
Place .......................
...............................................
...............................................
(Name in Block Letters)
...............................................
(Designation)
...........................................
(Bank’s Seal)
...........................................
(Authorization No.)
itness
...........................................
L
1. Signature, Name & Address
...........................................
VN
2. Signature, Name & Address
Note:
1. All italicized text in brackets [….text….] is for guidance on how to prepare this
bank guarantee and shall be deleted from the final document.
2. In case the guarantee is issued by a foreign Bank, the said bank shall have
operations in India and should be issued by Indian operations branch of the
said bank.
R
OR
(b) For JV
For each Installment of Advance, individual JV partner shall furnish Bank
Guarantee equal to his share in the installment of Advance plus 10%. Each
Bank Guarantee shall be valid for the stipulated completion period of the
contract.
OR
(b) For JV
L
For each Installment of Advance, individual JV partner shall furnish a
Bank Guarantee equal to his share in the installment of advance plus 10%.
Each Bank Guarantee shall be valid for the stipulated completion period of
VN
the contract.
R
N NT B N T S ST T P NT N
T S S PP B T NT T
Refer Clause 14.5 of GCC
AND EREAS RVNL/ the Engineer has agreed to make advance/stage payment to
L
the Contractor the total sum of Rs. ((in Figures) Rupees
in Figures)
(in Words) in Interim Payment Certificate (IPC)
in Words)
No. , the quantities and other particulars of which are detailed in this
IPC for the said works signed by the Contractor on for the Plant and
VN
Materials brought by the Contractor to site of the works or his workshop. Brief details
are also mentioned in schedule 1 appended hereto.
L
and Materials are likely to be endangered, mis-utilized or converted
converted to uses other
or commission on the
than those specified in the Contract, by any acts or omission or
part of the Contractor or any other person or on account of any reason whatsoever
and the Contractor binds himself and undertakes to comply with the directions of
VN
demand of RVNL to return the Plant and Materials without any de demur or
reservation.
6. That the said plant and materials shall, at all times, be open to inspection by
RVNL/ the Engineer or any authorized representative. In the eve event of the said
material or any part thereof at any time being found to be in llesser quantity than
stolen, destroyed or
for which payment has been released or the same has been stolen
damaged or becoming deteriorated, the Contractor will forthwith replace the same
or repair and make good the same as required by RVNL/ the Engineer.
Engin
R
7. That making payment does not mean that Plant and Materials are of required
brought to site by
specifications and quality or that whole of the quantity brough
Contractor will be used in the work. The Contractor is fully reresponsible for the
materials to conform to required quality and specification and if at any time
RVNL/ the Engineer do not find the material satisfactory, the Contractor at his
own cost would replace these. RVNL/ the Engineer would be at liberty to recover
cost of these from any dues of the Contractor. Also any Plant and Materials which
are in excess of what is finally required under the contract would be the
Contractor’s property without any liability on RVNL/ the Engineer who would
recover the cost of this from the Contractor.
8. That this Indemnity Bond is irrevocable. If at any time, any loss or damage occurs
to the Plant and Materials or the same or any part thereof is mis-utilized in any
manner whatsoever, then the Contractor hereby agrees that the decision of RVNL/
the Engineer as to assessment of loss or damage to the Plant and Materials shall be
final and binding on the Contractor. The Contractor binds itself and undertakes to
replace the lost and/or damaged Plant and Materials at its own cost and/or shall
pay the amount of loss to RVNL without any demur, reservation or protest. This is
without prejudice to any other right or remedy that may be available to RVNL/ the
Engineer against the Contractor under the Contract or under this Indemnity Bond.
. That if the Contractor shall at any time make any default in the performance or
observance in any respect of any of the terms and provisions of the said agreement
or of those presents, the total amount of the payment shall immediately on the
happening of such default be recovered by RVNL/ the Engineer fr from any dues of
that non-observance of
Contractor. It is also clearly understood by the Contractor that
the obligations under this Indemnity Bond by the Contractor sha shall inter-alia
Contractor for all intents and
constitute a criminal breach of trust on the part of the Contractor
L
purpose including legal / penal consequences.
10. IN ITNESS Contractor has hereunto set its hand through
EREOF, the Contractor th its
authorized representative, the day, month and year first above mentioned.
mentioned.
VN
11. SC EDULE 1
Particulars of the Plant and uantity alue of the Plant and
aterials aterials
R
(Contractor’s Name)
IN T E PRESENCE OF:
ITNESS: SIGNATURE
NAME:
ADDRESS :
Note:
The contractor has the option to submit the Indemnity Bond to cover all the items and
quantities of Plant and Materials of stage payment or to submit indemnity bond each
time the stage payment is to be taken or Plant and Materials advance is to be taken.
1.
L
VN
R
To:
The Chairman an anaging Director,
ail ikas Nigam imite ,
1st Floor, August KrantiBhawan,
BhikajiCama Place, K Puram,
New Delhi-110 066
L
E p o er), acting through [Insert Designation and address of the
Employer’s Representative],, has entere into a contract with [Insert
Representative],, hereinafter
Name and address of the Contractor’s Representative]
calle the Co tra tor), for the work of [Insert Name of Work]
Work], vi e
VN
Notification of Awar No [Insert Notification of Award No.].
) A as
er con itions of contract m lo er has e ucte an
amount of [Insert Amount deducted as retention
towar s retention mone till ate, an
money]towar A now the
contractor has re ueste the m lo er for releasing the sai am
amount on
su mission of a ank guarantee of e uivalent amount which has een
acce te the m lo er
R
L
3. n a ment of an amount less than aforementione full amount, as er
eman of the m lo er, the guarantee shall remain vali for th
the alance
amount i e the aforementione full amount less the a ment ma e to the
m lo er
VN
4. The Bank shall a the amount so eman e without an reference to the
contractor an without the m lo er eing re uire to show grou
groun s or give
reasons for its eman or the amount eman e
6. The Bank agrees that no change, a ition, mo ifications to the terms of the
Contract Agreement or to an ocuments, which have een or ma e
R
10. The ex ressions Bank an m lo er herein efore use shall inclu e their
res ective successors an assigns
11. The Bank here un ertakes not to revoke the guarantee uring its
currenc , exce t with the revious consent in writing of the em lo er This
guarantee is su ject to the niform ules for Deman uarantees CC
uarantees,
Pu lication No 758
Date
Place Signature of Authorised person of Bank]
L
[Name in Block letters
[Designation]
Address
.
VN
itness
1. Signature
Name & Address & Seal
2. Signature Bank’s Seal
Name & address & Seal Authorisation No…………..
Note :
1) All italicized text is for guidance on how to prepare this bank guarantee and
shall be deleted from the final document.
2) In case the guarantee is issued by a foreign Bank, the said bank shall have
operations in India and should be countersigned by Indian operations branch of
R